This is a bid solicitation document from the Village of Spring Valley, New York Department of Public Works for snow and ice removal services with brine pre-treatment on Village-maintained streets. The Village seeks one or more qualified contractors to provide complete snow and ice control services, including pre-storm brine pre-treatment (anti-icing), salting, de-icing, plowing during storms, and post-storm clean-up. The contract covers three plow sections totaling approximately 29.69 centerline miles (58.75 lane-miles) of Village streets, with bidders permitted to submit bids for individual sections or all three sections combined. An optional pre-bid meeting and site review will be held on November 9, 2026 at 11:00 AM at the Department of Public Works, 21 West Street, Spring Valley. Sealed bids are due November 16, 2026 at 3:00 PM ET and will be received by the Rockland County Purchasing Department. The initial contract term is one winter season (2026-2027), with the Village reserving the right to renew for an additional season (2027-2028) on the same terms and conditions. Renewal term pricing may be adjusted by the Consumer Price Index for All Urban Consumers, not to exceed 3.5 percent.
Pricing is based on unit prices for nine line items including brine pre-treatment applications, storm events classified by accumulation (Class A through D), post-storm re-treatment, and supplemental hourly services. The Village guarantees each vendor a Guaranteed Seasonal Minimum payment per awarded section regardless of snow and ice activity: Section 1 (East) $57,000, Section 2 (North-West) $63,000, Section 3 (South-West) $56,000, or all three sections $176,000. Per-occurrence charges at the vendor's bid unit prices are credited against the minimum, with vendors receiving full payment of the minimum in light winters and minimum payment plus excess charges in heavy winters. Each bid must be accompanied by $5,000 bid security. Vendors must maintain comprehensive insurance including $1,000,000 commercial general liability, $1,000,000 business automobile liability, $5,000,000 umbrella coverage, and $1,000,000 pollution liability. Performance security of 100 percent of the estimated annual contract amount is required within ten days of award. Vendors must have minimum three years of snow plowing and de-icing experience and at least one full winter season of brine anti-icing experience, own or lease required equipment including two Class 7/8 plow trucks, one small plow unit, and one brine applicator per section, and maintain GPS/AVL systems on all vehicles. The Village encourages bids from Minority- and Women-Owned Business Enterprises and Disadvantaged Business Enterprises but does not establish a set-aside.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VILLAGE OF SPRING VALLEY, NEW YORK
Department of Public Works Village Hall, 200 North Main Street, Spring Valley, New York 10977
BID TITLE: Snow and Ice Removal with Brine Pre-Treatment for Village Streets BID NO. SV-DPW-2026-003
VILLAGE OF SPRING VALLEY
Rockland County, New York
SNOW AND ICE REMOVAL WITH BRINE PRE-TREATMENT
FOR VILLAGE STREETS, SECTIONS 1 THROUGH 3
BID NO. SV-DPW-2026-003
Bids Due: November 16, 2026 at 3:00PM ET
Department of Public Works · 21 West Street, Spring Valley, NY 10977
Bids received by Rockland County Purchasing Department, County of Rockland, 50 Sanatorium Road, BLDG A, 6TH floor, Pomona, NY 10970 ATTN Paul Brennan
Village Hall, 200 North Main Street, Spring Valley, New York 10977
TABLE OF CONTENTS
Notice to Bidders
Instructions to Bidders
Insurance and Bond Requirements
Scope
Specifications
Article I – Background and Plow Sections
Article II – Definitions
Article III – Qualifications and Experience
Article IV – General Requirements
Article V – Brine Pre-Treatment (Anti-Icing)
Article VI – Plowing, De-Icing and Clean-Up Standards
Article VII – Trucks and Equipment
Article VIII – Operators and Communication
Article IX – Reporting, GPS and Verification
Article X – Damage, Safety and Traffic
Article XI – Village Monitoring, Deductions and Liquidated Damages
Article XII – Exclusions and Village Responsibilities
Term
Pricing
Guaranteed Seasonal Minimum
Payment
Estimated Quantities and Basis of Award
Submission of Bids
Additional Information, Interviews and Site Visits
Anticipated Bid Timeline
Bid Form – Sections 1 through 3
Bid Form – All Sections (Optional)
Bid Form – Signature Page
Equipment and Brine Capability Form
Certification of Experience (References)
Questions Form
Non-Collusion Certification Iran Divestment Act Certification
Sexual Harassment Prevention Certification
Disclosure of Contractor-Subcontractor and Substantially Owned-Affiliated Entity Relationships
Non-Bidder's Response
Appendix A – Plow Section Maps
Appendix B – Street List by Section
Village Hall, 200 North Main Street, Spring Valley, New York 10977
NOTICE TO BIDDERS
Sealed bids for the Village of Spring Valley Bid No. SV-DPW-2026-003, Snow and Ice Removal with Brine Pre-
Treatment for Village Streets, will be received by the Rockland County Purchasing Department, County of
Rockland, 50 Sanatorium Road, BLDG A, 6TH floor, Pomona, NY 10970 ATTN Paul Brennan, up to and including
November 16,2026 at 3:00 PM ET, prevailing time, at which time they will be publicly opened and read aloud.
The work consists of furnishing all labor, equipment, brine, salt and materials to pre-treat, plow, de-ice and clean up snow and ice on Village-maintained streets, divided into three (3) plow sections totaling approximately
29.69 centerline miles (58.75 lane-miles). Bids may be submitted for one or more individual sections and, optionally, for all three sections combined. Each section carries a Guaranteed Seasonal Minimum payment, stated in the bid documents, against which per-occurrence charges are credited.
Copies of the bid documents can be found on Bidnet or by calling Spring Valley Village Clerk Olga Sweet at (845)
356-7400 or emailing osweet@villagespringvalley.org.
Each bid must be accompanied by bid security in the amount of $5,000, as described in the Instructions to
Bidders. The Board of Trustees reserves the right to waive any informality in, or to reject, any or all bids.
October 30, 2026 Olga Sweet, Village Clerk Village of Spring Valley By order of the Board of Trustees
(Remainder of Page Intentionally Left Blank)
Village Hall, 200 North Main Street, Spring Valley, New York 10977
INSTRUCTIONS TO BIDDERS
The only official distribution source for this Bid is the Village of Spring Valley ("Village") through the Village
Clerk. Bidders who obtain this Bid from another source should register with the Village Clerk to receive addenda. A bidder who is not registered may not receive addenda or other important information.
By submitting a bid, the bidder offers to perform the Work at the prices stated. Bidders must READ and
UNDERSTAND all terms and conditions of this Bid and the laws governing public contracts in New York State, including General Municipal Law §103. If you do not agree with the terms and conditions in this Bid, do not submit a bid.
A bid will be considered if the following conditions are met:
1. Bid Questions. From the issue date of this Bid until November 10, 2026 at 12PM, bidders must submit all questions in writing to Purchasing@co.rockland.ny.us. Questions received after the deadline will not be accepted.
2. Questions and errors. Bidders are responsible for reporting in writing any errors, omissions or ambiguities in this Bid. All questions must be submitted by email to Purchasing@co.rockland.ny.us no later than
November 10, 2026 at 12:00 PM ET. Answers will be issued only by written addendum to all registered bidders. Questions will not be answered individually or by telephone.
3. Pre-bid meeting and site review. An optional pre-bid meeting will be held at the Department of Public
Works, 21 West Street, Spring Valley, on November 9, 2026 at 11:00 AM. Bidders are encouraged to drive each section before bidding. Failure to examine the streets will not relieve a bidder of any obligation under this Bid.
4. Sealed bids. All bids must be made on the forms provided in this Bid, as modified by any addenda, in a sealed envelope clearly marked on the outside "Bid No. SV-DPW-2026-003– Snow and Ice Removal with
Brine Pre-Treatment for Village Streets", addressed to Rockland County Purchasing Department, County of Rockland, 50 Sanatorium Road, BLDG A, 6TH floor, Pomona, NY 10970 ATTN Paul Brennan, and received up to and including November 16, 2026 at 3:00PM ET. Faxed or e-mailed bids will not be accepted. NO
LATE BIDS WILL BE ACCEPTED.
5. No alterations. Any alteration of the Bid Form or the Specifications, or any condition or qualification added by the bidder, will make the bid non-responsive. Bid Forms that are incomplete, illegible, conditional or unsigned will be rejected.
6. Copies. Submit one (1) unbound original with original signatures and one (1) copy of all required forms.
7. Bid security. Each bid must be accompanied by a bid bond, certified check or bank check payable to the
"Village of Spring Valley" in the amount of $5,000. Bid security of unsuccessful bidders will be returned after award. The successful bidder's bid security will be retained if it fails to execute the contract or furnish required insurance and bonds within ten (10) calendar days after notice of award.
8. Withdrawal. A bid may be withdrawn in writing before the bid opening. Bids may not be withdrawn for five (5) days after the bid opening.
9. Basis of Award. Read the Estimated Quantities and Basis of Award portion of this Bid carefully. Individual sections may be awarded to different bidders. The Village reserves the right to waive any informality, to reject any or all bids, and to award in whole or in part as described in the Basis of Award, if in the best interest of the Village.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
10. Contract. Any award is subject to execution of a contract in the form attached to this Bid and approval by the Board of Trustees. The Village has no obligation until the contract is executed, required insurance and bonds are provided. All costs of preparing a bid are at the bidder's expense.
11. Registration and authority. Bidders must be authorized to do business in New York State and furnish applicable certificates of incorporation, authority, partnership or assumed name (d/b/a) with the bid.
12. Subcontracting. The bidder may not subcontract any portion of the Work without the prior written consent of the mayor, or his designee. Approved subcontractors must meet all requirements of this Bid, and the
Vendor remains fully responsible for their work.
13. MWBE. The Village encourages bids from Minority- and/or Women-Owned Business Enterprises (MWBE) and Disadvantaged Business Enterprises (DBE).
14. Required certifications. The Non-Collusion Certification (General Municipal Law §103-d), Iran Divestment
Act Certification (General Municipal Law §103-g), Sexual Harassment Prevention Certification (State
Finance Law §139-l), and Contractor-Subcontractor Disclosure (General Municipal Law §103(1-c) and Labor
Law §220-b) are included in this Bid. Bidders must complete and submit a signed original of each.
15. Freedom of Information. Under the NYS Freedom of Information Law (Public Officers Law, Article 6), bids are presumptively public records after award. A bidder that believes part of its bid is exempt must request the exemption in writing at the time of submission, state the basis, and mark each such page: "THE BIDDER
BELIEVES THIS INFORMATION IS PROTECTED FROM DISCLOSURE UNDER THE NEW YORK STATE
FREEDOM OF INFORMATION LAW." The Village will make any final determination in accordance with law.
INSURANCE AND BOND REQUIREMENTS
During the term of the contract the Vendor shall maintain, at its own expense, the following insurance with carriers licensed in New York State and rated A- VII or better. The Village of Spring Valley, its Board of Trustees, officers, employees and agents shall be named as additional insureds on a primary and non-contributory basis on the general liability, automobile liability and umbrella policies.
Coverage Minimum limit
Commercial General Liability (occurrence form, including products/completed operations and contractual liability)
$1,000,000 per occurrence / $2,000,000 aggregate
Business Automobile Liability (all owned, hired and non-owned vehicles, including plow trucks and brine applicators)
$1,000,000 combined single limit
Umbrella / Excess Liability (following form over General and Auto Liability) $5,000,000 per occurrence
Workers' Compensation and Employer's Liability (NYS statutory) Statutory
NYS Disability and Paid Family Leave Benefits Statutory
Pollution Liability $1,000,000 per occurrence
Certificates of insurance (ACORD 25 with additional insured endorsements, and NYS Workers' Compensation and Disability forms C-105.2 or U-26.3 and DB-120.1) must be provided before execution of the contract.
Failure to submit insurance documents may result in disqualification of the bidder and retention of its bid security.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
Performance security. Within ten (10) days after notice of award, the Vendor shall furnish a performance bond, or other security acceptable to the Village, in the amount of one hundred percent (100%) of the estimated annual contract amount for the section(s) awarded.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
SCOPE
The Village of Spring Valley is seeking one or more qualified contractors to provide complete snow and ice control services on Village-maintained streets, including pre-storm brine pre-treatment (anti-icing), salting and de-icing, plowing during storms, and post-storm clean-up, for the purpose of keeping Village streets safe and passable for emergency vehicles, the traveling public and pedestrians. The Village is divided into three (3) plow sections, using State Route 45 (Main Street) and Maple Avenue as boundaries. Bidders may bid on one or more sections and, optionally, on all three sections combined.
SPECIFICATIONS
ARTICLE I
BACKGROUND AND PLOW SECTIONS
The Village maintains approximately 29.69 centerline miles (58.75 lane-miles) of streets, as listed in the New
York State Department of Transportation 2025 Local Highway Inventory for the Village of Spring Valley. For this contract the streets are divided into three plow sections, using Route 45 (Main Street) and Maple Avenue as boundaries:
Section Area Streets Centerline miles
Lane-miles
1 – East
All Village streets east of Route 45 (Main Street), both north and south of Route 59: Ewing Ave to Clinton St, Memorial Park Dr, Lake and Lafayette St, Lawrence St, Dutch La, Van Ordan Ave, and the Fairview Ave / Castle Ave / Division Ave area
9.73
19.16
2 – North-West
All Village streets west of Route 45 (Main Street) and north of Maple Avenue, including Maple Avenue itself: Union Rd, the Twin Ave / Paikin Dr area, Linden Ave, W Sneden Pl, and the northwest neighborhoods (Blueberry Hill Rd, Rigaud Rd, Dorset and Morris Rd, Francis Pl)
10.52
21.03
3 – South-West
All Village streets west of Route 45 (Main Street) and south of Maple Avenue, both north and south of Route 59:
downtown west of Main St, West St to N Cole Ave, W Central Ave, S Madison Ave, Ridge Ave, and the Robert Pitt Dr and Kennedy Dr areas
9.44
18.56
Total 155* 29.69 58.75
* The Village has 151 named streets. Four streets cross a section boundary and are divided where they cross it, so they are counted in two sections: Castle Ave, Funston Ave and Furman St/W Furman Pl (divided at Main Street) and N Myrtle Ave (divided at Maple Avenue).
Section boundaries. Route 45 (Main Street) and Route 59 are State highways and are not part of this contract.
Section 1 includes every Village street east of Main Street. Section 2 includes every Village street west of Main
Street and north of Maple Avenue; Maple Avenue itself is in Section 2. Section 3 includes every Village street west of Main Street and south of Maple Avenue. Streets that begin at Main Street belong to the section on the side of Main Street where they run. Where a street crosses a boundary, each part belongs to the section it lies in, as listed in Appendix B.
Maps of each section are in Appendix A and a complete list of streets in each section, with limits, length, number of lanes and lane-miles, is in Appendix B. Section boundaries and street assignments may be adjusted by the Village by written notice; any resulting change in lane-miles of more than five percent (5%) in a section will be addressed by an equitable adjustment based on the bid unit prices.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
Roads not included. State highways (Route 59 / East Central Avenue and Route 45 / Main Street) are maintained by the New York State Department of Transportation, and County roads (including Pascack Road, Old Nyack Turnpike, Eckerson Road, Viola Road and the southern portion of South Central Avenue) are maintained by Rockland County. These roads are not part of this contract, but the Vendor may travel on them between Village streets.
The Village Department of Public Works ("DPW") is located at 21 West Street, Spring Valley, NY 10977.
ARTICLE II
DEFINITIONS
1. The term "Contract" refers to the contract awarded under this Bid for one or more sections.
2. The term "Vendor" refers to the successful bidder awarded a contract for one or more sections.
3. The term "Superintendent" refers to the mayor or his designee.
4. The term "Section" refers to one of the three plow sections described in Article I, Appendix A and Appendix
B.
5. The term "Work" refers to all brine pre-treatment, salting, de-icing, plowing, clean-up and related services required by this Bid.
6. The term "Storm Event" refers to a period of snowfall, sleet, freezing rain or ice formation requiring Work, beginning at the Village call-out and ending when snowfall or freezing precipitation has stopped and clean-up is complete. Precipitation that resumes more than twenty-four (24) hours after the prior precipitation ended is a new Storm Event.
7. The term "Accumulation" refers to the total depth of new snow for a Storm Event as measured by the
Village on a snow board at the DPW yard, 21 West Street, or as reported by the National Weather Service for Spring Valley, NY. The Village's measurement is final for classification and payment.
8. The term "Lane-mile" refers to one mile of one travel lane. A two-lane street one mile long equals two lane-miles.
9. The term "Brine" refers to a sodium chloride (salt) and water solution meeting Article V.
10. The term "Pre-treatment (anti-icing)" refers to application of brine to dry or near-dry pavement before a
Storm Event to prevent snow and ice from bonding to the pavement.
11. The term "Pre-wetting" refers to applying brine to rock salt as it is spread so that it sticks to the pavement and works faster.
12. The term "Main Roads" refers to Union Rd, Maple Ave, Ewing Ave, Lawrence St, Commerce St, Church St, N Madison Ave, N Myrtle Ave, South Central Ave (Village portion), West Central Ave and West St, and any other street designated by the Superintendent (including hills, school access and emergency routes).
13. The term "Event Ticket" refers to the Vendor's written record of a brine application or Storm Event for a section, in the form approved by the Village, signed by the Vendor and verified by the Superintendent.
ARTICLE III
QUALIFICATIONS AND EXPERIENCE
Each bidder, by submitting a bid, confirms that at the time of its bid and throughout the Contract term it:
Village Hall, 200 North Main Street, Spring Valley, New York 10977
1. Experience. Has at least three (3) years of experience, as of the date of this Bid, performing snow plowing and de-icing of public streets or large commercial properties, and at least one (1) full winter season of brine anti-icing experience. Bidders must complete the Certification of Experience (References) with at least three references.
2. Equipment. Owns or has under long-term lease the equipment required by Article VII for each section bid, and lists it on the Equipment and Brine Capability Form.
3. Brine supply. Has a dependable source of brine meeting Article V, either by producing it with its own brine maker or by purchase from a supplier.
4. Staff. Employs a sufficient number of properly licensed (CDL), trained and experienced operators to perform the Work twenty-four (24) hours a day for the duration of a Storm Event, including relief operators for storms longer than twelve (12) hours.
5. Permits. Holds, at its own expense, all permits, registrations and licenses required by Federal, State and local authorities for the Work, including for brine production, storage and transport.
ARTICLE IV
GENERAL REQUIREMENTS
1. Full service. For each section awarded, the Vendor is responsible for all brine pre-treatment, salting, plowing and clean-up of every street in that section, in accordance with these Specifications, for every
Storm Event during the Contract term. The Vendor shall furnish all labor, supervision, equipment, fuel, brine, salt and materials.
2. Vendor representative. The Vendor shall assign a representative who is the main point of contact for the
Village and is available twenty-four (24) hours a day, seven (7) days a week, including holidays, from
November 1 through April 15, and shall keep the Village informed of current contact information.
3. Route plan. Within ten (10) days after award and before November 22, the Vendor shall submit a written route plan for each awarded section, showing the order of streets for each truck, with Main Roads first, for approval by the Superintendent. The approved plan may be changed only with the Superintendent's approval.
4. Compliance. All Work shall be performed in compliance with applicable Federal, New York State and local laws, rules and regulations, including NYS Vehicle and Traffic Law, NYS Department of Environmental
Conservation requirements, and Village Code.
5. Responsibility for equipment and materials. The Vendor is solely responsible for its equipment, tools, brine and materials. Equipment shall not be left unattended on Village streets. The Village is not responsible for loss of or damage to the Vendor's property.
6. Multiple sections. A Vendor awarded more than one section must provide the full minimum equipment and staffing required by Article VII for each section at the same time. Equipment may not be shared between sections during a Storm Event.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
ARTICLE V
BRINE PRE-TREATMENT (ANTI-ICING)
1. Purpose. Brine pre-treatment prevents snow and ice from bonding to the pavement, makes plowing faster and more effective, and reduces the total amount of salt required. Brine pre-treatment is a required part of the Work.
2. Brine material. Brine shall be a sodium chloride solution of 23% salt by weight (allowable range 22% to
23.3%), made from rock salt meeting ASTM D632 / AASHTO M 143 and clean water, free of sediment and debris. The Vendor shall check the concentration of each batch with a calibrated salinometer or hydrometer and record the reading. Additives (such as calcium chloride, magnesium chloride, corrosion inhibitors or agricultural by-products) may be used only with the Superintendent's written approval. The
Vendor shall submit Safety Data Sheets for all materials before the first application.
3. Application rate. Brine shall be applied at 40 to 60 gallons per lane-mile, or as directed by the
Superintendent for specific conditions, using a ground-speed-controlled applicator with a spray bar or stream nozzles that covers the full width of each travel lane. Main Roads, hills, intersections, the Lawrence
Street bridge, school zones and the downtown business area shall be treated first.
4. When to apply. Brine pre-treatment shall be applied when ordered by the Superintendent, normally 12 to
48 hours before forecast snow or ice, and only when: (a) pavement temperature is at or above 15°F and expected to stay above that during application; (b) the pavement is dry or nearly dry; and (c) rain is not expected to fall first and wash the brine away. Brine shall not be applied to snow-covered or wet pavement or during active precipitation, unless directed by the Superintendent.
5. Completion time. Each brine application for a full section shall be completed within four (4) hours of the
Superintendent's order. The Superintendent may order partial applications (for example, Main Roads only); partial applications are paid in proportion to lane-miles treated.
6. Pre-wetting of salt. All rock salt spread during Storm Events shall be pre-wetted with brine at the spinner at 8 to 10 gallons per ton, unless the Superintendent approves otherwise.
7. Rock salt. Rock salt shall meet ASTM D632 / AASHTO M 143, Type I, Grade 1, and shall be applied at 200 to 300 pounds per lane-mile per application, adjusted for pavement temperature and conditions. Sand or abrasives may be used only with the Superintendent's approval.
8. Storage and environment. Brine and salt shall be stored and handled in accordance with NYS Department of Environmental Conservation requirements: salt under cover on an impervious pad, and brine in sound tanks with secondary containment. The Vendor shall avoid over-application near storm drains and the
Pascack Brook, shall immediately clean up any spill, and shall report spills as required by law and to the
Superintendent. The Village will not provide storage space for the Vendor's materials unless agreed in writing.
9. Records. For each brine application the Vendor shall record on the Event Ticket: date, start and finish time, section and streets treated, gallons applied, application rate (the Superintendent may request brine concentration reading, and air and pavement temperature, supported by GPS/AVL data as described in
Article IX).
Village Hall, 200 North Main Street, Spring Valley, New York 10977
ARTICLE VI
PLOWING, DE-ICING AND CLEAN-UP STANDARDS
1. Call-out. Storm Events begin with a call-out by the Superintendent by phone, text or email. The Vendor shall have the required equipment working in the section within one (1) hour of the call-out. Regardless of call-out, the Vendor shall monitor weather forecasts and be ready to mobilize from November 15 through April 15.
2. Salting at the start of a storm. At the start of snowfall or freezing precipitation the Vendor shall salt Main
Roads, hills, intersections, the Lawrence Street bridge and school zones, and then all other streets in the section.
3. Plowing. Plowing shall begin when accumulation reaches one-half (1.5) inches or as directed by the
Superintendent, and shall continue without interruption until the Storm Event ends. During the storm the
Vendor shall keep Main Roads open with a complete pass at least every two (2) hours, and every street in the section open to at least one passable lane in each direction (or the full width of a one-way street) at least every four (4) hours.
4. Plowing practices. Trucks shall be operated in the direction of traffic at all times, including on one-way streets. Snow shall not be pushed onto sidewalks, crosswalks, fire hydrants, bus stops, curb ramps or catch basins, into intersections, or onto State or County roads. Snow shall be plowed curb to curb, and dead ends and cul-de-sacs shall be cleared to their full width. Operators shall use care to avoid blocking driveways where practical.
5. Clean-up. After snowfall ends, the Vendor shall complete clean-up of the entire section within six (6) hours for Class A and Class B events and ten (10) hours for Class C and Class D events, including: pushing back snow to the curb line; widening intersections and corners for sight distance and turning; clearing dead ends and cul-de-sacs; and salting to bare or wet pavement on Main Roads and to a safe condition on all other streets.
6. Re-treatment. After clean-up, when refreezing, drifting or ice formation occurs, the Superintendent may order re-treatment (salting) of the section, which shall be completed within four (4) hours of the order.
7. Snow hauling. Removal and hauling of snow (for example, from the downtown business area) is not part of the per-event price and will be performed only when ordered by the Superintendent at the supplemental hourly rates on the Bid Form.
8. Completion report. When each section is complete, the Vendor's representative shall notify the
Superintendent and submit the Event Ticket within twenty-four (24) hours.
ARTICLE VII
TRUCKS AND EQUIPMENT
1. Minimum equipment per section. For each section awarded, the Vendor shall furnish at a minimum:
– Two (2) plow trucks, Class 7 (26,001 to 33,000 lbs. GVWR) or Class 8 (over 33,000 lbs. GVWR), model year 2015 or newer, each with a front plow of at least 10 feet and a ground-speed-controlled material spreader with a pre-wet (liquid) system.
– One (1) brine applicator (truck-mounted tank and spray system) with capacity of at least 1,000 gallons, or able to complete a full-section application within the time required by Article V.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
– One (1) smaller plow unit (one-ton or similar, with plow and spreader) for dead ends, cul-de-sacs and narrow streets.
2. Back-up equipment. The Vendor shall have back-up equipment available to replace any truck that breaks down within two (2) hours. Time lost to breakdowns does not extend the performance standards in Article
VI.
3. Lights and safety. All trucks shall have amber warning lights (strobe, LED or rotating) visible 360 degrees, working headlights, plow lights, turn signals and back-up alarms, and reflective conspicuity markings on the sides and rear, in conformance with NYS Vehicle and Traffic Law.
4. Calibration. Spreaders and brine applicators shall be calibrated before November 15 each season and after any repair, and calibration records shall be given to the Superintendent.
5. Inspection. All equipment is subject to inspection by the Village at any time. Equipment that does not meet these Specifications may not be used.
6. Registration and condition. All vehicles shall be properly registered, inspected and insured and maintained in safe operating condition in accordance with applicable law.
ARTICLE VIII
OPERATORS AND COMMUNICATION
1. Operators. The Vendor shall provide enough qualified operators to perform the Work twenty-four (24) hours a day when required. Operators shall hold the proper class of driver's license and shall be trained in snow plowing, salt spreading and brine application.
2. Hours of service. The Vendor shall not allow any operator to work so long without rest that safety is at risk, and shall provide relief operators for long Storm Events.
3. Cell phones. Each operator shall carry a working cellular phone. The Vendor shall give the Superintendent a list of operators, trucks and phone numbers before each season and keep it current.
4. Instructions. Operators shall follow the instructions of the Superintendent and shall communicate in
English sufficiently to understand and carry out those instructions.
ARTICLE IX
REPORTING, GPS AND VERIFICATION
1. GPS / AVL. Every plow truck and brine applicator shall be equipped with a working GPS/automatic vehicle location (AVL) system that records location, time, speed (where available) and spreader or spray status.
The Vendor shall give the Village access to live tracking or provide reports after each Storm Event or brine application, in a format acceptable to the Superintendent.
2. Event Tickets. The Vendor shall submit an Event Ticket for each brine application, Storm Event and re-treatment in each section, listing the event classification claimed, equipment and operators used, start and finish times, salt (tons) and brine (gallons) applied, and any problems encountered.
3. Verification. Payment will be made only for Work verified by the Superintendent from the Event Tickets, GPS/AVL records and field confirmation.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
ARTICLE X
DAMAGE, SAFETY AND TRAFFIC
1. Accidents and damage. If any of the Vendor's vehicles is involved in an accident or contacts any property
(including traffic signals, poles, street lights, signs, fire hydrants, curbs, sidewalks, mailboxes, fences, lawns or parked vehicles), the Vendor shall immediately notify the Superintendent and the Spring Valley Police
Department, and the operator shall remain at the scene until released. The Vendor is responsible for all damage caused by it, its operators or subcontractors, and shall repair it to the Village's satisfaction by May
31 following the season. The value of unrepaired damage, as determined by the Village, may be deducted from payments due the Vendor.
2. Indemnification. The Vendor shall defend, indemnify and hold harmless the Village, its officers, employees and agents from all claims arising from the Vendor's performance of the Work, as more fully stated in the contract.
3. Parked vehicles and obstructions. The Vendor shall report to the Superintendent any parked vehicle or obstruction that prevents plowing. The Village will enforce its snow emergency parking regulations. The
Vendor shall return to complete any blocked street once it is cleared.
4. Safety. The Vendor shall operate safely and in accordance with the NYS Vehicle and Traffic Law and OSHA requirements, with due regard for pedestrians, school buses and emergency vehicles.
ARTICLE XI
VILLAGE MONITORING, DEDUCTIONS AND LIQUIDATED DAMAGES
1. Monitoring. The Superintendent will monitor road conditions and the Vendor's performance during and after Storm Events.
2. Deductions. The Village may deduct from any amount due the Vendor the value of Work not performed or not performed in accordance with these Specifications.
3. Liquidated damages. Because delays in snow and ice control endanger public safety and the actual damages are difficult to determine, the Vendor agrees to pay as liquidated damages, and not as a penalty:
– Failure to have required equipment working in the section within the call-out time: $250 per truck per hour of delay.
– Failure to complete a brine application within the required time: $250 per hour of delay per section.
– Failure to meet the plowing or clean-up standards of Article VI: $500 per occurrence per section, plus $100 per hour until corrected.
4. Work by others. If the Vendor fails to perform, the Village may perform the Work with its own forces or another contractor and deduct the cost from amounts due the Vendor, in addition to any liquidated damages.
5. Default. Repeated failure to perform three (3) or more documented failures in a season is a material default for which the Village may terminate the contract for the affected section(s) on three (3) days' written notice and call on the performance security. On termination for default the Vendor forfeits the unpaid portion of the Guaranteed Seasonal Minimum, as stated in the Guaranteed Seasonal Minimum section.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
ARTICLE XII
EXCLUSIONS AND VILLAGE RESPONSIBILITIES
1. Not included. Unless added by written order of the Superintendent at the supplemental hourly rates: State and County roads; sidewalks; municipal parking lots and Village facility driveways; private roads and private property; and snow hauling.
2. Village responsibilities. The Village will: issue call-outs and brine orders; measure accumulation; enforce snow emergency parking rules; provide the Vendor with section maps and street lists; and designate any additional Main Roads, hills or school routes.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
TERM
The initial term of the contract ("Initial Term") is one (1) winter season, beginning on the date of contract execution and continuing until the last snow or ice event of the 2026–2027 winter season, but no later than
April 30, 2027. The Village reserves the right, in its sole discretion, to renew the contract for one (1) additional winter season ("Renewal Term"), the 2027–2028 season, on the same terms and conditions. If the Village exercises the renewal option, the Vendor shall execute a renewal amendment by the date stated in the Village's notice.
Renewal Term prices. Bidders submit one set of unit prices. For the Renewal Term, the Vendor may request in writing, at least [sixty (60)] days before the renewal season begins, an increase in all unit prices equal to the percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), New York–Newark–Jersey
City area, published by the U.S. Bureau of Labor Statistics, for the twelve (12) months ending August before the renewal season, not to exceed three-and-half percent (3.5%). If the index decreases, prices remain unchanged.
Without a timely request, Initial Term prices continue to apply. The Guaranteed Seasonal Minimum for the
Renewal Term shall be adjusted by the same percentage as the unit prices.
PRICING
1. Conditional bids will not be accepted (for example, bidder-imposed minimum events or minimum dollar amounts). The only minimum payment is the Guaranteed Seasonal Minimum set by the Village below.
2. Pricing must be submitted on the Bid Forms provided. Bidders must price every item for each section bid.
The All-Sections Bid Form is optional.
3. Unit prices are all-inclusive: labor, supervision, equipment, fuel, brine, rock salt, materials, mobilization, GPS/AVL, insurance, overhead and profit. No fuel, material or other surcharges will be paid. Prices shall exclude taxes from which the Village is exempt.
4. Prices are fixed for the Initial Term and may be adjusted for the Renewal Term only as provided in the Term portion of this Bid.
5. Event classification. Each Storm Event in each section will be paid once, at the price for the class matching the Village's accumulation measurement:
Class Accumulation / condition What is paid
Class A Salting / de-icing only; less than 2 inches of snow, sleet, freezing rain or ice
Price per event (Item 2)
Class B 2 inches to less than 6 inches Price per event (Item 3)
Class C 6 inches to 12 inches Price per event (Item 4)
Class D More than 12 inches Class C price plus price per inch above 12 inches (Item 5)
6. Brine pre-treatment (Item 1) is paid per completed full-section application ordered by the Superintendent.
Re-treatment (Item 6) is paid per completed full-section salting ordered by the Superintendent after clean-
up. Supplemental hourly items (Items 7–9) are paid only for hours ordered by the Superintendent and actually worked, with a minimum of two (2) hours per call-out.
7. Salting during a Storm Event, including salting before plowing begins and during clean-up, is included in the event price and is not paid separately.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
8. Quantities are estimates for bid comparison only. Except for the Guaranteed Seasonal Minimum, the
Village does not guarantee any number of events, applications or hours. Actual quantities depend on the weather and the Village's needs, and the Vendor shall hold the Village harmless for any difference between estimated and actual quantities.
GUARANTEED SEASONAL MINIMUM
To secure dedicated equipment, operators and materials for the Village all winter, the Village guarantees each
Vendor a minimum payment for each section awarded, for each winter season, regardless of the amount of snow and ice ("Guaranteed Seasonal Minimum"). The amounts are set by the Village and are the same for every bidder; they are not bid prices and are not part of the bid comparison.
Section Guaranteed Seasonal Minimum (per season)
Section 1 – East $57,000
Section 2 – North-West $63,000
Section 3 – South-West $56,000
All three sections $176,000
1. Credit against the minimum. All charges for Work performed in a section at the Vendor's bid unit prices
(brine pre-treatment, Storm Events, re-treatment and supplemental hourly work) are credited against that section's Guaranteed Seasonal Minimum as they are earned.
2. Light winter. If the total charges earned in a section for the season are less than the Guaranteed Seasonal
Minimum, the Vendor is paid the full Guaranteed Seasonal Minimum for that section.
3. Heavy winter. If the total charges earned in a section for the season are more than the Guaranteed
Seasonal Minimum, the Vendor is paid the Guaranteed Seasonal Minimum plus all charges above it. There is no additional payment beyond the charges earned.
4. Entitlement. The Vendor's right to the Guaranteed Seasonal Minimum is earned by remaining ready and in compliance for the full season, from November 15 through April 15: equipment inspected and calibrated, insurance and performance security in force, route plan approved, and representative and operators available as required by these Specifications. The Village shall pay the Guaranteed Seasonal Minimum in accordance with the Payment section below and may not reduce it except as stated in items 5 and 6.
5. Deductions. Liquidated damages, the cost of Work performed by others because of the Vendor's failure to perform, and the cost of damage repairs under Articles X and XI may be deducted from any payment, including installments of the Guaranteed Seasonal Minimum.
6. Termination. If the Village terminates a section for its own convenience, the Vendor is entitled to the
Guaranteed Seasonal Minimum prorated by the number of months of the season (December through April) completed, or to the charges earned, whichever is greater. If the Village terminates a section because of the Vendor's default, the Vendor forfeits any part of the Guaranteed Seasonal Minimum not already paid and is paid only for Work performed through the date of termination, less deductions.
7. Budget. The Village shall appropriate at least the full Guaranteed Seasonal Minimum for each awarded section for each season.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
PAYMENT
1. Monthly installments. The Guaranteed Seasonal Minimum for each section is payable in five (5) equal monthly installments for December, January, February, March and April.
2. Monthly invoices. The Vendor shall submit a monthly invoice by section, with all Event Tickets and
GPS/AVL reports for the month, showing the charges earned at the bid unit prices, the season-to-date total of charges earned, and the season-to-date total paid. Each month the Vendor is paid the greater of (a) the season-to-date charges earned, or (b) the season-to-date installments of the Guaranteed Seasonal
Minimum, less the total already paid for the season.
3. End-of-season reconciliation. By May 15, the Village will total all charges earned for the season in each section. If total charges are less than the Guaranteed Seasonal Minimum, the Village will pay any unpaid balance of the Guaranteed Seasonal Minimum. If total charges are more than the Guaranteed Seasonal
Minimum, the Village will pay any remaining charges earned. No payment is owed for charges not supported by verified Event Tickets.
4. Approval. Payments will be made after audit and approval by the Board of Trustees in accordance with
Village Law, normally within thirty (30) to forty-five (45) days of receipt of a correct invoice, by check.
5. Withholding. The Village may withhold from any payment amounts for deductions, damage and liquidated damages under Articles X and XI.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
ESTIMATED QUANTITIES AND BASIS OF AWARD
For comparing bids, the following estimated quantities per section per season will be used. They are estimates only and are not guaranteed.
Item
Description
Unit
Est. quantity per section per season
1 Brine pre-treatment, full section per application 10
2 Class A event – salting / de-icing only (under 2") per event 8
3 Class B event – 2" to less than 6" per event 6
4 Class C event – 6" to 12" per event 3
5 Class D – each inch above 12" (added to Class C) per inch 6
6 Post-storm re-treatment (salting), full section per application 6
7 Supplemental: plow truck (Class 7/8) with operator per hour 10
8 Supplemental: front-end loader (min. 3 cu. yd.) with operator per hour 10
Supplemental: dump truck (min. 10 cu. yd.) with operator, for snow hauling per hour 10
1. Section Total. For each section, the bidder's Section Total is the sum of (estimated quantity × unit price) for all items, as shown on the Bid Form. The Guaranteed Seasonal Minimum is the same for all bidders and is not included in the Section Total.
2. All-Sections Total. A bidder may also submit an optional All-Sections Bid for all three sections combined.
The All-Sections estimated quantities are three (3) times the per-section quantities for Items 1–6, and twenty (20) hours for each of Items 7–9.
3. Award. The Village will award to the lowest responsive and responsible bidder(s) as follows: (a) the Village will identify the lowest responsive and responsible Section Total for each of the three sections; (b) the
Village will add those three lowest Section Totals together; and (c) the Village will compare that sum with the lowest responsive and responsible All-Sections Total. The Village will award the combination that results in the lowest total cost to the Village — either section-by-section to the lowest bidder for each section, or all three sections to the lowest All-Sections bidder, at the Superintendent discretion.
4. Responsibility. In determining responsibility the Village may consider the bidder's experience, references, equipment, brine capacity, financial ability, and past performance for the Village or other public agencies.
5. Ties. Ties will be resolved by coin toss conducted by the Superintendent in the presence of at least two witnesses, with the tied bidders invited to attend.
6. Rights reserved. The Village reserves the right to waive any informality, to reject any or all bids, and to re-advertise, if in the best interest of the Village.
SUBMISSION OF BIDS
Submit one (1) unbound signed original and the number of copies stated in the Instructions to Bidders. It is not necessary to return the entire bid document. Bids must include:
1. Bid Form for each section bid (Sections 1 through 3), and the optional All-Sections Bid Form if submitted
Village Hall, 200 North Main Street, Spring Valley, New York 10977
2. Bid Form – Signature Page (including maximum number of sections)
3. Bid security
4. Equipment and Brine Capability Form
5. Certification of Experience (References)
6. Non-Collusion Certification
7. Iran Divestment Act Certification
8. Sexual Harassment Prevention Certification
9. Disclosure of Contractor-Subcontractor and Substantially Owned-Affiliated Entity Relationships
10. Certificate of incorporation / authority / partnership / d/b/a, as applicable
11. Proof of NYS Department of Labor registration under Labor Law §220-i, if required
ALL SUBMISSIONS MUST BE CLEARLY MARKED ON THE OUTSIDE OF THE ENVELOPE WITH THE BID TITLE AND
NUMBER.
ADDITIONAL INFORMATION, INTERVIEWS AND SITE VISITS
The Village may require any bidder to present additional evidence of experience, equipment, brine production or supply, staffing and financial standing, and may inspect any bidder's equipment and brine facilities before award. Bidders should not assume they will be given an opportunity to clarify or improve their bids.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
BID FORM – SECTION 1 (EAST)
BUSINESS NAME:
Section 1 – East: 54 streets, 9.73 centerline miles, 19.16 lane-miles. All Village streets east of Route 45 (Main
Street), both north and south of Route 59: Ewing Ave to Clinton St, Memorial Park Dr, Lake and Lafayette Sts, Lawrence St, Dutch La, Van Ordan Ave, and the Fairview Ave / Castle Ave / Division Ave area. See Appendix A and Appendix B.
Item Description Unit Est. qty Unit price Extended total*
1 Brine pre-treatment, full section per application 10 $ $
2 Class A event – salting / de-icing only (under 2") per event 8 $ $
3 Class B event – 2" to less than 6" per event 6 $ $
4 Class C event – 6" to 12" per event 3 $ $
5 Class D – each inch above 12" (added to Class C) per inch 6 $ $
6 Post-storm re-treatment (salting), full section per application 6 $ $
7 Supplemental: plow truck (Class 7/8) with operator per hour 10 $ $
Supplemental: front-end loader (min. 3 cu. yd.) with operator per hour 10 $ $
Supplemental: dump truck (min. 10 cu. yd.) with operator, for snow hauling per hour 10 $ $
SECTION 1 TOTAL (sum of Extended totals, Items 1–9) $
* Extended total = Est. qty × Unit price. Unit prices apply to the Initial Term; Renewal Term prices are adjusted only as stated in the Term section.
Guaranteed Seasonal Minimum for Section 1 (set by the Village, not bid): $57,000 per season. Per-occurrence charges at the unit prices above are credited against it.
Check here if NOT bidding on this section.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
BID FORM – SECTION 2 (NORTH-WEST)
Section 2 – North-West: 60 streets, 10.52 centerline miles, 21.03 lane-miles. All Village streets west of Route
45 (Main Street) and north of Maple Avenue, including Maple Avenue itself: Union Rd, the Twin Ave / Paikin
Dr area, Linden Ave, W Sneden Pl, and the northwest neighborhoods (Blueberry Hill Rd, Rigaud Rd, Dorset and
Morris Rds, Francis Pl). See Appendix A and Appendix B.
total*
1 Brine pre-treatment, full section per application 10 $ $
2 Class A event – salting / de-icing only (under 2") per event 8 $ $
3 Class B event – 2" to less than 6" per event 6 $ $
4 Class C event – 6" to 12" per event 3 $ $
5 Class D – each inch above 12" (added to Class C) per inch 6 $ $
6 Post-storm re-treatment (salting), full section per application 6 $ $
7 Supplemental: plow truck (Class 7/8) with operator per hour 10 $ $
Supplemental: front-end loader (min. 3 cu. yd.) with operator per hour 10 $ $
Supplemental: dump truck (min. 10 cu. yd.) with operator, for snow hauling per hour 10 $ $
SECTION 2 TOTAL (sum of Extended totals, Items 1–9) $
* Extended total = Est. qty × Unit price. Unit prices apply to the Initial Term; Renewal Term prices are adjusted only as stated in the Term section.
Guaranteed Seasonal Minimum for Section 2 (set by the Village, not bid): $63,000 per season. Per-occurrence charges at
☐ Check here if NOT bidding on this section.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
BID FORM – SECTION 3 (SOUTH-WEST)
Section 3 – South-West: 41 streets, 9.44 centerline miles, 18.56 lane-miles. All Village streets west of Route 45
(Main Street) and south of Maple Avenue, both north and south of Route 59: downtown west of Main St, West
St to N Cole Ave, W Central Ave, S Madison Ave, Ridge Ave, and the Robert Pitt Dr and Kennedy Dr areas. See
Appendix A and Appendix B.
total*
1 Brine pre-treatment, full section per application 10 $ $
2 Class A event – salting / de-icing only (under 2") per event 8 $ $
3 Class B event – 2" to less than 6" per event 6 $ $
4 Class C event – 6" to 12" per event 3 $ $
5 Class D – each inch above 12" (added to Class C) per inch 6 $ $
6 Post-storm re-treatment (salting), full section per application 6 $ $
7 Supplemental: plow truck (Class 7/8) with operator per hour 10 $ $
Supplemental: front-end loader (min. 3 cu. yd.) with operator per hour 10 $ $
Supplemental: dump truck (min. 10 cu. yd.) with operator, for snow hauling per hour 10 $ $
SECTION 3 TOTAL (sum of Extended totals, Items 1–9) $
* Extended total = Est. qty × Unit price. Unit prices apply to the Initial Term; Renewal Term prices are adjusted only as stated in the Term section.
Guaranteed Seasonal Minimum for Section 3 (set by the Village, not bid): $56,000 per season. Per-occurrence charges at
☐ Check here if NOT bidding on this section.
Village Hall, 200 North Main Street, Spring Valley, New York 10977
BID FORM – ALL SECTIONS (OPTIONAL)
Complete this form only if offering a combined price for all three sections (29.69 centerline miles, 58.75 lane-miles). A bidder submitting this form must also submit a Bid Form for each of Sections 1 through 3. The equipment requirements of Article VII apply to each section.
total*
1 Brine pre-treatment, full section per application 30 $ $
2 Class A event – salting / de-icing only (under 2") per event 24 $ $
3 Class B event – 2" to less than 6" per event 18 $ $
4 Class C event – 6" to 12" per event 9 $ $
5 Class D – each inch above 12" (added to Class C) per inch 18 $ $
6 Post-storm re-treatment (salting), full section per application 18 $ $
7 Supplemental: plow truck (Class 7/8) with operator per hour 20 $ $
Supplemental: front-end loader (min. 3 cu. yd.) with operator per hour 20 $ $
Supplemental: dump truck (min. 10 cu. yd.) with operator, for snow hauling per hour 20 $ $
ALL SECTIONS TOTAL (sum of Extended totals, Items 1–9) $
* Extended total = Est. qty × Unit price. Items 1–6 are full-village quantities (all three sections).
Guaranteed Seasonal Minimum for all three sections (set by the Village, not bid): $176,000 per season,…