sUSNA Water SOW.pdf

PDF 212 KB Posted

Attached to
USNA 10” Main Irrigation Pipe Repair Federal contract opportunity
Solicitation number
12305B22Q0119
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

View the file

Other files for this federal contract opportunity

Other files attached to USNA 10” Main Irrigation Pipe Repair, newest first.
File Type Posted
12305B22Q0119 (1).pdf PDF
sDOL WD DC SAM.pdf PDF
sUSNA WATER repair.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNA Emergency 10” Main Irrigation Pipe Repair 07/06/2022

STATEMENT OF WORK

1. PROJECT TITLE: USNA Emergency 10” Main Irrigation Pipe Repair

2. PROJECT LOCATION: US National Arboretum (USNA), 3501 New York Ave, N.E., Washington, DC 20002

3. INTRODUCTION

The U.S. National Arboretum (USNA) requires the services of a contractor to perform emergency repairs to the 10” Main Irrigation Pipe located under Hickey Lane and across from the Headhouse building on the USNA Campus per the Scope of Work (SOW) below.

4. GENERAL REQUIREMENTS

The contractor shall provide all labor, material, equipment, tools, travel, utilities, and supervision to complete the SOW in compliance with the current IBC Codes.

5. SCOPE OF WORK

• Verify location with USNA Facilities Personnel

• Cut approximately 2’ x 4’ area of asphalt

• Remove remaining subsurface to reveal pipe

• Install 4’ of new 10” DIP – 2 sleeves and megalugs

• Test system to ensure repair is complete

• Back fill with 12 inch stone Base (RC6 Stone) compacted

• Then 12 inch 57 stone compacted

• Then 6” Concrete base (allow 24 hrs to cure)

• Then 4” Asphalt Surface

• Place system back into service

6. PROJECT SCHEDULE

The period of performance shall be five (5) days after receiving the Notice to Proceed (NTP) from the Contracting Officer.

The Contractor shall provide a project schedule within two (2) calendar days after the date of receipt of award towards ensuring work is successfully completed within the period of performance. At minimum, the schedule shall include significant project milestones, for each task, to include, but not be limited to:

• Notice to Proceed Date

• Construction Start Date

• Construction End Date

• Substantial Completion

• Final Acceptance

• Warranty End Date

USNA Emergency 10” Main Irrigation Pipe Repair 07/06/2022

• Final Warranty Inspection Date

7. WARRANTY

All work shall be guaranteed for workmanship and material failures for a period of one (1) year from the date of final acceptance of the work. The contractor shall submit all product warranty documents to the COR.

8. CONTACT LIST:

Role Name and Address Phone E-Mail Address Contracting Officer

(CO)

TBD TBD TBD

EPM/COR Daniel Jewett

USDA, ARS, USNA

3501 New York Ave NE Washington, DC 20002

202-341-0917 Daniel.Jewett@usda.gov

Facility Manager/Location Coordinator

Daniel Jewett

USDA, ARS, USNA

3501 New York Ave NE Washington, DC 20002

202-341-0917 Daniel.Jewett@usda.gov

Director of USNA Richard Olsen

USDA, ARS, USNA

3501 New York Ave NE Washington, DC 20002

(202) 245-4539 Richard.Olsen@usda.gov

Administrative Officer

(AO)

TBD TBD TBD

Area Safety and Occupational Health Officer

Bonnie Di Salvo

USDA, ARS, NEA, FSRP

600 E. Mermaid Lane Wyndmoor, PA 19038

215-233-6592 Bonnie.Disalvo@USDA.GOV

Real Property Management

Lisa Bynum

USDA ARS, BARC

10300 Baltimore Ave.

Beltsville, MD 20705

(301) 504-5188 Lisa.Bynum@usda.gov

Contractor TBD mailto:onnie.Disalvo@USDA.GOV

File details come from the government source that posted it. Updated .