Supply and Install.pdf
PDF 168 KB Posted
- Attached to
- FCC Florence Commercial Washing Machines Federal contract opportunity
- Solicitation number
- 15B40624Q00000014
- Issued by
- Department of Justice Bureau of Prisons
About this file
This document is a requirement for the procurement of 4 commercial washing machines at the Federal Correctional Complex in Florence, Colorado. The required washing machines are UniMac 130lb hard mount models with 300 G-Force high performance, UniLinc touch control, and fully programmable OPTispray technology. They have a 10-year warranty on bearings, seals, frame, and cylinder shaft assembly, and a 3-year warranty on all other parts. The awarded contractor is responsible for delivery, installation, and connection to existing utilities within 3ft, as well as removal and disposal of the existing equipment. The customer is responsible for any needed utility upgrades or floor work. The related federal contract opportunity is Solicitation Number 15B40624Q00000014 for "FCC Florence Commercial Washing Machines" issued by the Department of Justice Bureau of Prisons.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15B40624Q00000014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Justice Federal Bureau of Prisons
Federal Correctional Complex Florence, Colorado
May 30, 2024
Requirement of 4 Commercial Washing Machines:
UniMac 130lb hard mount, 300 G-Force High Performance, UniLinc Touch Control, Fully Programmable, OPTispray Technology, No Soap Dispenser, Automatic Injection Only 440- 480V/50-60Hz/3Ph
10-year warranty on bearings, seals, frame, and cylinder shaft assembly 3-year warranty on all other parts
Install- Service Labor:
Includes removal and disposal of existing equipment. Delivery and installation of new equipment. The awarded Contractor shall complete all connections to existing utilities within 3ft.
The customer is to verify all correct utilities are in place before installation. The awarded Contractor will not alter any utilities. If additional supplies are needed to make connections, the awarded contractor will bill on a separate line item on the final invoice. The customer is responsible for any utility upgrades that may be needed. The awarded contractor is not responsible for the concrete condition as floor work may need to be done. The awarded contractor is not responsible for vibration issues. The awarded contractor will not perform any interior finish work on doors, jams, walls, trim, or bulkheads. The customer is responsible for providing access to and through the laundry room. If any doors, walls, or jams need to be removed, this will need to be done before the awarded Contractor's arrival.