Supplemental Specifications.pdf

PDF 475 KB Posted

Attached to
"GAOA" Diamond Creek Falls Trail Bridge - Supply and Deliver F. O. B. Destination
Solicitation number
1240BK23Q0079
Issued by

View the file

Other files

File Type Posted
Plan Set - Diamond Creek Falls TrailBridge.pdf PDF
Amend. 1 SF-30.docx DOCX document
Amend. 2 SF-30.docx DOCX document
1240BK2Q0079.docx DOCX document
1240BK2Q0079.docx DOCX document
SF 1449 1240BK23Q0079.pdf PDF
Specification List.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Add the following paragraph to Subsection 101.01:

101.01_National_9_15_2016

101 - TERMS" FORMAT" AND DEFINITIONS

101.01Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

Add the following to Subsection 101.03:

101.03_National_4_7_2015

101.03Abbreviations.

(a)Acronyms.

AGAR - Agriculture Acquisition Regulations AFPA - American Forest and Paper Association FSAR - Forest Service Acquisition Regulations MSHA - Mine Safety and Health Administration NESC - National Electrical Safety Code WCLIB - West Coast Lumber Inspection Bureau

(t) Miscellaneous unit abbreviations.

MP milepost ppm parts per million STA station location volume location

101.04_National_l0 _23_2016 Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule - The Schedule of Items.

Bridge - A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor - The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the "Purchaser".

Culvert - Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings - (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed - (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way - A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation-(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the (Ollowingdefinitions:

Adjustment in Contract Price - "Equitable adjustment," as used in the Federal Acquisition Regulations, or "construction cost adjustment," as used in the Timber Sale Contract, as applicable.

Change - "Change" means "change order" as used in the Federal Acquisition Regulations, or "design change" as used in the Timber Sale Contract.

Forest Service - The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line - A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road - Temporary construction access built along the route of the project.

Purchaser - The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Stream course - A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order - An order affecting and controlling traffic on roads under Forest Service jurisdiction.

Road Orders are issued by a designated Forest Officer under the authorities of36 CFR, part 260.

Shop Drawings - (Timber and Stewardship Contracts) Referred to as "Drawings" in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards - The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure lOl-l-lllustration o(road structure terms:

I~

-. L, =, =~ I ~, ::t.11' I =c:

..:J i =::-. * e." ""4t:-=- a~:::.- , E '_ =..:J .=, Q.

~I ....c: x: ...;:: ~I =I~ u; n ':L' a--, ri

;-...e t------------------ F.'I~lrlt - or - "/',i:~\1 t--------F.'oa(I,:;j(le ------1""+'-- F.'0 a (l\I',,~~,,/---+------ F.'0 a (I ~;H:Ie

(; round Ine r',Jote: ::;rl ape s an(I (IItYIensio fro;',,I'lIll',,Iar,t to Tit 10Ca I co fll:lltlOfro;

~:;ee (jra',,I,,Iln~I':;io r t'/PICal sections :< ami '( (Ienote Clearjn~1outside oi the final de':;19n cross section

102 - BID" AWARD" AND EXECUTION OF CONTRACT

Delete Section 102 in its entirety.

Delete Section 102.

102.00_National_9_15_2016

103 - SCOPE OF WORK

Delete allo(Section 103 except Subsection 103.01 Intent o(Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

103.00_NatiooaJ_9_15_2016

I04.00_National_9_IS_2016

104 - CONTROL OF WORK

Delete Subsections 104.01,104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

I04.06_National_9_16_2016 Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

106 - ACCEPTANCE OF WORK

Delete Subsection 106.01 and replace with the (ollowing:

106.01_National_7_18_2017

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer's recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range.

The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project.

When the Government tests work, copies of test reports are furnished to the Contractor upon request.

Government tests mayor may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor's results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.

The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;

providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory's accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_10_23_20 16

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.05 _National_7 _18 _2017

Delete Subsection 107.05.

Delete Subsection 107.05.

108 - PROSECUTION AND PROGRESS

Delete Section 108 in its entirety.

Delete Section 108.

108.00_ National_9 _16 _2016

Delete Subsections 109.06.109.07.109.08. and 109.09:

I09.00_National_9_16_2016

109 - MEASUREMENT AND PAYMENT

Delete Subsections 109.06, 109.07, 109.08, 109.09.

Add the following sentence to Subsection 109.02(b):

I09.02_National_9_16_2016

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

552.00_Forest_7_1 5_201 9

571 - PREFABRICATED BRIDGES

Description

571.01 This work consists of designing, fabricating, delivering, and installing prefabricated modular bridge superstructures, or transporting and installing Government-furnished prefabricated, modular superstructures and components. The work also includes constructing caps, bearings, and abutments including excavation and backfill and anchoring bridge superstructures to abutments as required

Materials

571.02 Requirements. Furnish materials that meet the requirements specified in the following sections:

Bridge Railing Structural Metal Prestressed Concrete Reinforcing Steel Steel Structures Structural Concrete Timber Structures Material for Timber Structures

Concrete compressive strength, structural steel tensile strength, finish and designation, timber species, grade, and treatment, and other material specifications shall be as required or if not listed in the contract documents, take them from the manufacturer's drawings, and have them approved by the CO prior to fabrication.

Construction Requirements

571.03 Design Requirements. For required loadings use the most recent AASHTO "Standard Specifications for Highway Bridges".

When design of the structure is required, submit plans and calculations signed by a professional engineer registered in the state where the bridge will be located.

571.04 Design Drawings. When furnishing a prefabricated bridge superstructure, submit design drawings, calculations, or shop drawings at least 21 days in advance of the start of fabrication to allow time for review and correction of any changes and approval by the CO. Include plan, elevation, and section views of the modular bridge superstructure, dimensions of all components, welding and connection details, and general and specific notes regarding design and construction.

571.05 General. Perform excavation, backfill, and embankment work under Sections 204 and 209.

Dispose of all debris resulting from operations in accordance with Section 203.

571.06 Performance. Notify the CO at least before delivering the bridge.

If the prefabricated superstructure is not installed immediately upon delivery to the project site, provide appropriate equipment and labor to unload and stack, support, and store all material at the delivery point.

Support and stack all components to prevent damage. Furnish and install blocking to support all components at least 12 inches above the ground.

Furnish all tools, devices, special equipment, and material needed for installation in well-marked watertight containers suitable for long-term, outdoor storage.

571.07 Abutments and Approaches. Construct required caps, bearings, and abutments according to Division

500. Construct approaches including excavation and backfill according to sections 204 and 209.

571.08 Contractor-Furnished Prefabricated Bridge Superstructure. Furnish the following items for approval prior to delivery of the bridge component:

(a) Supplier or inspection agency certification of wood species and grade of all timber and a conformance certificate for all sawn and glued laminated members.

(b) Certification by an approved inspection and testing agency of wood treatment, listing method of treatment, type of preservative, retention, and penetration. Supplier certification is permitted if each piece is stamped or branded with a legible American Wood Preservers Bureau quality mark.

(c) Certification of structural steel, fasteners, and hardware.

(d) Certification of galvanizing process used.

(e) Steel fabricator certification that steel fabrication and quality control meet the requirements of the AISC Code of Standard Practice; and that all welding meets the requirements of ANSV AASHTO/AWS D 1.5Bridge Welding Code.

(f) A complete list of all bridge components, hardware, and fasteners.

(g) Complete instructions and drawings. Provide drawings that are black line, of reproducible quality, on 11x17 sheets. Furnish the same information in an approved electronic format.

Mark each major component of the bridge superstructure with the same permanent serial number in a location that is clearly visible, both when stacked in storage and erected at the site.

571.10 Non-pressure Epoxy Grout Anchors. Furnish non-pressure epoxy grout to cement anchor dowels and bolts. At least 15 days prior to use submit for approval manufacture's test information on the non-pressure epoxy grout proposed for use.

Immediately prior to placing dowels or bolts, clean drill hole of dust and other material. Fill hole halfway with grout. Insert dowels by rotating it though one complete turn while tapping it down. Insert bolts according to manufactures instructions. If necessary add more grout to fill the hole.

571.11 Acceptance. Furnish a production certification for timber, including glued-laminated lumber, structural steel, and fabricated steel. Furnish a certification for all wood treatment, fasteners, hardware, galvanizing processes, and non-pressure epoxy grout.

Measurement

571.12 Measure the Section 571 items listed in the bid schedule according to Subsection 109.02.

Payment

571.13 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 571 pay items listed in the bid schedule.

Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.