Supplemental_project_specifications_SNF_LAU_RD_Mech_Site_Prep.pdf

PDF 176 KB Posted

Attached to
Superior National Forest Mechanical Site Prep Federal contract opportunity
Solicitation number
12444624Q0071
Issued by
Department of Agriculture Forest Service

About this file

This document is the Supplemental Project Specifications for the Superior National Forest Mechanical Site Prep FY2024 Laurentian Ranger District in Aurora, Minnesota. It provides details on Contract Line Items 0001 and 0002 for Tractor Scarification (Post-Harvest) in two separate blocks.

The specifications outline the access points, period of performance, and acreage for each map unit requiring tractor scarification. For Block 1, there are 8 map units ranging from 5 to 33 acres, to be accessed via various forest roads. For Block 2, there are 2 map units totaling 69 acres, to be accessed via a temporary logging road. The contractor will be responsible for opening and closing the temporary road.

This document is associated with the federal contract opportunity for the Superior National Forest Mechanical Site Prep, Solicitation Number 12444624Q0071, issued by the Department of Agriculture Forest Service.

View the file

Other files for this federal contract opportunity

Other files attached to Superior National Forest Mechanical Site Prep, newest first.
File Type Posted
Performance_Work_Statement_SNF_LAU_RD_Mech_Site_Prep.pdf PDF
Wage_Determination_1979-1073.pdf PDF
Project_Maps.pdf PDF
Sol_12444624Q0071.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Superior National Forest Mechanical Site Prep FY2024

Laurentian Ranger District, Aurora, MN Supplemental Project Specifications

Contract Line Item 0001 – Tractor Scarification (Post-Harvest) Block 1

MAP

UNIT

NBR

ACCESS SUPPLEMENTAL

PROJECT INSTRUCTION

Acres PAY UNIT

LN-01 Access via SC678 rock rake.

period of performance -summer dry (July-Oct)

33 per Acre

LN-02 Access via FR528F rock rake.

period of performance -summer dry (July-Oct)

11 per Acre

LN-03 Access via FR528F rock rake.

period of performance -summer dry (July-Oct)

6 per Acre

LN-04 Access via FR528F rock rake.

period of performance -summer dry (July-Oct)

16 per Acre

LN-05 Access via FR531DB rock rake.

period of performance -summer dry (July-Oct)

14 per Acre

LN-06 Access via FR531DB rock rake.

period of performance -summer dry (July-Oct)

18 per Acre

LN-07 Access via FR268M rock rake.

period of performance -summer dry (July-Oct)

5 per Acre

LN-08 Access via FR256 rock rake.

period of performance -summer dry (July-Oct)

12 per Acre

Contract Line Item 0002 – Tractor Scarification (Post-Harvest) Block 2

MAP

UNIT

NBR

ACCESS SUPPLEMENTAL

PROJECT INSTRUCTION

Acres PAY UNIT

LN-09 Access via Logging Road from LN-10 rock rake.

period of performance -summer dry (July-Oct)

44 per Acre

LN-10 Access via Murphy Lake Road and private road on the Northwest corner of unit.

(U1TWPMURPHYLK01).

rock rake.

period of performance -summer dry (July-Oct)

25 per Acre

NOTE: Both units in Block 2 are accessed through a short temp road that is closed with stumps as a barricade. These roads will need to be opened by the contractor to access and then closed again by the contractor when units are completed.

File details come from the government source that posted it. Updated .