Sundog_Trunk_Main_Sewer_Phase_C3.pdf
PDF 350 KB Posted
- Attached to
- Sundog Trunk Main Sewer Phase C3
- Solicitation number
- 2026-NIBCONST-559
- Issued by
- Yavapai County, Arizona
About this file
This is a Notice Inviting Bids issued by the City of Prescott, Arizona, for the Sundog Trunk Main Sewer Phase C3 Project, a critical wastewater infrastructure centralization initiative. The project includes construction of a downtown regional lift station near Granite Creek Park/6th Street, approximately 25,000 linear feet of 26-inch force main routing through downtown streets and residential areas, and approximately 2,500 linear feet of 24-inch gravity sewer trunk main with 8-inch branch mains along Granite Creek. The work encompasses extensive utility coordination, traffic management, environmental controls near the EPA-designated impaired waterway, and integration with existing infrastructure. The mandatory pre-bid conference is scheduled for Tuesday, September 8, 2026, at 9:00 a.m. at the City of Prescott Public Works Department, with an optional site walk following the meeting. Sealed bids are due on Thursday, October 1, 2026, at 2:00 p.m. via the OpenGov Procurement portal. The anticipated contract award date is October 27, 2026, with an anticipated Notice to Proceed of November 30, 2026, and an expected project completion date of May 31, 2028. The contract term is three years beginning November 9, 2026, with mutual consent renewal options. The project must be completed within 720 calendar days from the Notice to Proceed.
The bidding schedule includes 148 line items covering mobilization, traffic control, pavement work, utilities (water and sewer), force main installation, lift station construction, and site restoration, with a contract allowance of $4,120,000. Bidders must submit a proposal guarantee of at least 10 percent of the total bid price and possess an Arizona Registrar of Contractors A-General Engineering license. Construction insurance requirements include commercial general liability with limits of $1,000,000 per occurrence and $3,000,000 general aggregate, business automobile liability with $1,000,000 combined single limit, and workers' compensation with statutory limits. Key challenges addressed in the project scope include urban routing through downtown and sensitive areas, environmental protection for Granite Creek, coordination with multiple stakeholders, and adherence to ADEQ standards and impaired waterway requirements stemming from a 2023 consent order. Questions must be submitted by September 22, 2026, at 5:00 p.m., and all inquiries are to be made through the OpenGov Procurement portal's Question and Answer section.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE INVITING BIDS
PROJECT SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR
SUNDOG TRUNK MAIN SEWER PHASE C3
MAYOR AND COUNCIL:
Cathey Rusing, Mayor
Mary Frederickson, Council Member
Lois Fruhwirth, Council Member
Ted Gambogi, Council Member
Jim Garing, Council Member
Patrick Grady, Council Member
Jay Ruby, Council Member
CITY CLERK:
Sarah M. Thornhill
PUBLIC WORKS DIRECTOR:
Gwen Rowitsch
CITY OF PRESCOTT
SUNDOG TRUNK MAIN SEWER PHASE C3
TABLE OF CONTENTS
1. NOTICE TO PROPOSERS
2. GENERAL INFORMATION
3. SCOPE OF WORK
4. CONTRACT NEGOTIATION AND AWARD
5. TERM OF CONTRACT
6. TERMINATION OF CONTRACT
7. PROTEST POLICY
8. BIDDING SCHEDULE
9. PROPOSAL
ATTACHMENTS:
A - SAMPLE CONSTRUCTION CONTRACT
B - CITY OF PRESCOTT SUPPLEMENT TO THE MARICOPA ASSOCIATION OF
GOVERNMENTS (MAG) UNIFORM STANDARD SPECIFICATIONS AND DETAILS FOR
PUBLIC WORKS CONSTRUCTION (TECHNICAL SPECIFICATIONS)
C - SUNDOG TRUNK MAIN SEWER C3 CIVIL_FINAL PLAN SET
D - SUNDOG TRUNK MAIN SEWER C3_LIFT STATION FINAL PLAN SET
E - SUNDOG TRUNK MAIN SEWER C3_SPECIAL PROVISIONS
F - SUNDOG TRUNK MAIN SEWER C3_SPECIAL PROVISIONS APPENDIX A
G - SUNDOG TRUNK MAIN SEWER C3_SPECIAL PROVISIONS APPENDIX B
H - SUNDOG TRUNK MAIN SEWER C3_LIFT STATION SPECIFICATIONS
I - SUNDOG TRUNK MAIN SEWER C3_LIFT STATION TECHNICAL MEMORANDUM
1. NOTICE TO PROPOSERS
Sundog Trunk Main Sewer Phase C3
DESCRIPTION: The City of Prescott, Arizona, is advancing its long-term wastewater infrastructure centralization initiative through the Sundog Trunk Main Sewer Phase C3 Project.
The critical capital improvement project supports the consolidation of wastewater treatment operations from the Sundog Wastewater Treatment Plant to the more modern and expandable
Airport Water Reclamation Facility. It addresses capacity limitations, mitigates risk of sanitary sewer overflows, lowers long-term operations and maintenance costs, and enhances overall system reliability for current and future growth.
MANDATORY PRE-BID CONFERENCE: Tuesday, September 8, 2026, at 9:00 am, at City of
Prescott Public Works Department, 433 N. Virginia Street, Prescott, Arizona 86301 or via optional
Microsoft Teams Meeting. Microsoft Teams Meeting https://teams.microsoft.com/meet/211996783618273?p=GczCsr4Smm5ZFAacFH ID: 211 996
783 618 273 Passcode: ex72u98V.
BID OPENING: Thursday, October 1, 2026, at 2:00 pm (Arizona time) via OpenGov Procurement
Portal.
In accordance with local and State law, sealed bids will be received by the City of Prescott until the time and date specified above, for the services specified herein. Bids must be submitted using the City’s OpenGov Procurement portal at the website shown below.
The City of Prescott reserves the right to accept or reject any or all bids, and/or some or all of the alternates bid, and waive any informality deemed in the best interest of the City and to reject the bids of any persons who have been delinquent or unfaithful in any contract with the City.
This solicitation, full submittal information and any addenda are available free of charge on the
City’s website at https://procurement.opengov.com/portal/prescott-az
PUBLISH: August 30, 2026, and September 6, 2026 https://procurement.opengov.com/portal/prescott-az
2. GENERAL INFORMATION
2.1. MANDATORY PRE-BID CONFERENCE
The pre-bid conference is mandatory for potential bidders. Bids will only be accepted from firms in attendance as established on the sign-in sheet. Anything discussed, or not discussed, in the meeting shall not change the requirements of the Notice Inviting Bid or its documents. Any changes to the Notice Inviting Bid or its documents shall be in writing issued via addendum through the City's OpenGov Procurement portal. The minutes of this pre-bid conference will be distributed to all attendees. The minutes shall not be considered part of any addendum and shall not be considered part of the contract documents for the project.
The mandatory pre-bid conference will be held on Tuesday, September 8, 2026 at 9:00 am and at the following location:
City of Prescott Public Works Department, 433 N. Virginia Street, Prescott, Arizona 86301 or via optional Microsoft Teams Meeting. Microsoft Teams Meeting https://teams.microsoft.com/meet/211996783618273?p=GczCsr4Smm5ZFAacFH ID: 211 996
783 618 273 Passcode: ex72u98V
There will be an optional site walk following the meeting. The sewer alignment for the portion of the project that runs through the Granite Creek Corridor will be staked to allow the potential bidders visual representation of available construction limits and access.
2.2. REQUESTS FOR INFORMATION
Firms who desire clarification of the procurement terms, selection criteria or submittal requirements shall restrict their inquiries to written communications only. All communications shall be submitted through the "Question and Answer" section of the Notice Inviting Bids on the
City's OpenGov Procurement portal.
All inquiries, requests for information, or requests for clarifications must be received by the City before 5:00 pm on Tuesday, September 22, 2026. Responses, or addenda as required, will be issued no later than a time and date noted in this Notice Inviting Bid's Timeline (see Proposed Project
Schedule). Receipt of addenda must be acknowledged. All interested parties "following" the project on the City's OpenGov Procurement portal will automatically be notified upon the City issuing an Addendum to this Notice Inviting Bids. It is the submitter’s sole responsibility to check the City’s OpenGov Procurement portal for periodic updates or addenda.
2.3. CONTACT INFORMATION
Procurement Contact:
Jaimie Sventek
Contracts Coordinator
City of Prescott - Purchasing contracts@prescott-az.gov
2.4. PROPOSED PROJECT SCHEDULE
The Contractor shall fully complete all work under this Contract within seven hundred twenty
(720) calendar days beginning with the calendar day as noted in the Notice to Proceed. The
Contractor shall at all times during the continuance of the Contract prosecute the work with such work force and equipment as is sufficient to complete the project within the time specified.
The following milestones are estimates of the earliest dates possible for planning purposes only and shall not represent any contractual commitment whatsoever on the part of the City. The City reserves the right to amend the project schedule as necessary.
Project milestones are estimated to be as follows:
Notice Inviting Bids Release Date: August 28, 2026
Notice Inviting Bids Advertised: Prescott
Daily Courier:
August 30, 2026
Pre-Bid Conference Meeting (Mandatory): September 8, 2026, 9:00am
City of Prescott Public Works Department, 433 N. Virginia Street, Prescott, Arizona
86301 or via optional Microsoft Teams
Meeting.
Microsoft Teams Meeting https://teams.microsoft.com/meet/21199678
3618273?p=GczCsr4Smm5ZFAacFH
ID: 211 996 783 618 273
Passcode: ex72u98V
Question Submission Deadline: September 22, 2026, 5:00pm
Notice Inviting Bids Due Date and Time: October 1, 2026, 2:00pm
Bid Opening (Non-Mandatory): October 1, 2026, 2:05pm
Microsoft Teams Meeting https://teams.microsoft.com/meet/29375245
0672401?p=AhW7fbFa1cBMc7SRxI
ID: 293 752 450 672 401
Passcode: Fq9Rz69J
Anticipated Award of Contract: October 27, 2026
Pre-Construction Meeting: Week of November 16, 2026
Anticipated Notice to Proceed: November 30, 2026
Anticipated Expected Completion Date: May 31, 2028
3. SCOPE OF WORK
3.1. SCOPE OF WORK
The intent of the Plans and Specifications is to prescribe a complete work for the described project which the Contractor shall perform in a manner acceptable to the City Public Works Director and in full compliance with the terms of the Contract.
https://teams.microsoft.com/meet/211996783618273?p=GczCsr4Smm5ZFAacFH https://teams.microsoft.com/meet/211996783618273?p=GczCsr4Smm5ZFAacFH https://teams.microsoft.com/meet/293752450672401?p=AhW7fbFa1cBMc7SRxI https://teams.microsoft.com/meet/293752450672401?p=AhW7fbFa1cBMc7SRxI
Unless otherwise specified in the Special Provisions, the Contractor shall furnish all materials, labor, tools, equipment, water, light, power, transportation, superintendence, temporary construction of every nature, and incidentals, but not limited to, dust and traffic control measures, and to perform all work involved in executing the Contract in a satisfactory and workmanlike manner within the specified time.
All standard specifications and details referenced, unless otherwise noted, shall conform to all the
City of Prescott Standard Specifications and Detail Drawings, most current revisions, and to the most current editions of the Uniform Standard Specifications and Details for Public Works
Construction by the Maricopa Association of Governments (MAG Specifications and Details), including revisions thereto.
3.2. DESCRIPTION OF WORK
Phase C3 includes:
• Downtown Regional Lift Station: Construction of a new regional lift station near the
Granite Creek Park / 6th Street area.
• 26-inch Force Main: Approximately 25,000 linear feet of 26” force main, routing from the new lift station northward along 6th Street, westward on Merritt Avenue and
Montezuma Street, northward on Ruth Street and Demerse Avenue, eastward on Prescott
Heights Drive, northward on Campbell Avenue, eastward on Rosser Street, and northward on Highway 89 to connect with an existing force main stub at Highway 89 and Prescott
Lakes Parkway.
• 24-inch Gravity Sewer Trunk Main and Branch Mains: Approximately 2,500 linear feet of 24” sewer trunk main and 8” branch mains along Granite Creek from eastern Sonora
Drive, under La Guardia Bridge / Montezuma Street, through Granite Creek Park to the new lift station.
Key Challenges
• Urban and Sensitive Routing: Construction through downtown streets, residential areas, parks (e.g., Granite Creek Park), and along State Route 89. This involves traffic control, minimizing disruptions to businesses/residents, and coordinating with multiple stakeholders.
• Environmental Sensitivities: Work near Granite Creek, an EPA designated impaired waterway requiring robust erosion/sediment control, dewatering, and protection of park resources and the La Guardia Bridge crossing.
• Integration with Existing Infrastructure: Tie-ins to prior phases and ensuring seamless connections to support full centralization.
• Regulatory and Permitting: Compliance with ADEQ standards and impaired waterway requirements, stormwater permits, and any conditions from the 2023 consent order. Public safety and environmental monitoring will be critical.
• Construction Phasing and Schedule: Phased work to maintain sewer service, manage wet weather flows, scheduling construction activities outside of local school sessions, and align with overall centralization timeline including related projects like the AWRF Solids
Handling Facility Project and the Effluent/Wastewater Pipelines and State Route 89 Road
Improvements Project.
• Geotechnical and Site Conditions: Variable soils including the potential for rock excavation, groundwater, urban utilities, and highway work constraints in Prescott’s terrain.
• Minimize Community Impact: Exceptional traffic control management, phased construction, proactive communication, and restoration that improves roadways, sidewalks, and public spaces.
• Innovative Methods: Use of trenchless technologies where feasible, critical sequencing to minimize utility shutdowns, advanced erosion control, or sustainable practices to reduce disruption and environmental footprint.
• Safety and Quality: Zero-incident safety performance with an emphasis on trench safety, high-quality materials/installation for long-term durability, and value engineering that maintains or enhances system performance within budget.
• Schedule and Budget Adherence: Reliable delivery that accelerates centralization benefits without compromising quality.
• Collaboration and Expertise: Demonstrated experience with similar urban sewer/force main projects, lift stations, multi-agency coordination, and Arizona-specific regulations.
Strong partnership approach with City staff, residents, and other contractors.
The project offers vendors an opportunity to deliver high-impact infrastructure that protects
Prescott’s environment, supports growth, and exemplifies excellence in public works. The City values experienced, solutions-oriented teams committed to quality and community stewardship.
4. CONTRACT NEGOTIATION AND AWARD
To qualify the proposal must be submitted on time and materially satisfy all requirements identified in this Request. If, in the judgment of the City, a proposal does not conform to the format specified herein, or if any section is absent or significantly incomplete, the City reserves the right to reject the submittal.
4.1. OVERVIEW
Approval of the City Council will be required for the award of a contract for performance of the services described herein.
The City reserves the right to cancel this Request, reject in whole or in part any and all submittals, waive or decline to waive irregularities in any submittals, or determine not to enter into contract as specified if determined by the City to be in the City’s best interests.
4.2. AWARD OF CONTRACT
The selected company/firm will be required to execute and meet the terms of the City’s contract/agreement, including insurance requirements, in a form acceptable to the City Attorney.
Approval of the City Council may be required for award of a contract for performance of the services described herein and as may additionally be developed during negotiations. Any contract award submitted to the City Council for consideration is not binding on the City until after approval by the City Council and full execution of the contract documents by both parties.
4.3. CONSTRUCTION INSURANCE REQUIREMENTS
Vendor/Contractor and/or subcontractors shall procure and maintain until all of their obligations have been discharged, including any warranty periods under this Contract are satisfied, insurance against claims for injury to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Vendor/Contractor, his agents, representatives, employees, or subcontractors.
The insurance requirements herein are minimum requirements for this Contract and in no way limit the indemnity covenants contained in this Contract.
The City in no way warrants that the minimum limits contained herein are sufficient to protect the
Contractor from liabilities that might arise out of the performance of the work under this Contract by the Vendor/Contractor, his agents, representatives, employees, or subcontractors.
Vendor/Contractor is free to purchase such additional insurance as may be determined necessary.
The policies shall include, or be endorsed to include the following provisions:
A. On insurance policies where the City of Prescott is named as an additional insured, the City of Prescott shall be an additional insured to the full limits of liability purchased by the
Contractor even if those limits of liability are in excess of those required by this Contract.
Additional Insured:
City of Prescott
201 N. Montezuma Street
Prescott, AZ 86301
B. The Contractor's insurance coverage shall be primary insurance and non-contributory with respect to all other available sources.
All certificates required by this Contract shall be emailed directly to coi@prescott-az.gov. The
City contract number and project name/description shall be noted on the certificate of insurance.
The City reserves the right to require complete, certified copies of all insurance policies required by this Contract at any time. Any Renewal of insurance certificates with endorsements will need to be emailed to the above emails at least two weeks prior to expiration.
Notice of Cancellation: With the exception of a ten (10) day notice of cancellation for non-payment of premium, and changes to material to compliance with this contract in the insurance policies above shall require thirty (30) days written notice.
Acceptability of Insurers: Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A-VII, unless otherwise approved by the City of Prescott. General liability, automobile liability, and worker’s compensation insurance is to be placed with an insurer admitted in the state in which operations are taking place.
Verification of Coverage: Contractor shall furnish the City with certificates of insurance (ACORD form or equivalent approved by the City) as required by this Contract. The certificates for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf.
All certificates and any required endorsements are to be received and approved by the City before work commences. Each insurance policy required by this Contract must be in effect at or prior to commencement of work under this Contract and remain in effect for the duration of the project and warranty period as set forth in warranty letter. Failure to maintain the insurance policies as required by this Contract or to provide evidence of renewal is a material breach of contract.
MAG Specifications, Sections 103.1 through 103.8, including: Unless otherwise specifically required by the Special Conditions, the minimum limits of public liability and property damage liability shall be as follows:
A. Contractor shall provide coverage with limits of liability not less than those stated below. An excess liability policy or umbrella liability policy may be used to meet the minimum liability requirements provided that the coverage is written on a following form basis.
Commercial General Liability – Occurrence Form:
Policy shall include bodily injury, property damage, broad form, contractual liability and
XCU coverage.
• General Aggregate $3,000,000
• Products - Completed Operations Aggregate $3,000,000
• Personal and Advertising Injury $1,000,000
• Each Occurrence $1,000,000
• Fire Legal Liability (Damage to Rented
Premises)
$100,000 (if applicable)
The policy shall be endorsed to include the following additional insured language:
“The Contractor agrees to endorse the City of Prescott as an Additional Insured on the Commercial
General Liability with the following Additional Insured endorsement, or similar endorsement providing equal or broader Additional Insured coverage, the CG 2010 10 01 Additional Insured -
Owners, Lessees, or Contractors, or CG2010 07 04 Additional Insured – Owners, Lessees, or
Contractors – Scheduled Person or Organization endorsement in combination with the additional endorsement of GC2037 10 01 Additional Insured – Owners, Lessees, or Contractors – Completed
Operations shall be required to provide back coverage for the contractor’s “your work” as defined in the policy and liability arising out of the products-completed operations hazard.”
Business Automobile Liability: Bodily Injury and Property Damage for any owned, hired, and/or non-owned vehicles used in the performance of this Contract.
• Combined Single Limit (CSL) $1,000,000
The policy shall be endorsed to include the following additional insured language:
“The City of Prescott shall be named as additional insured with respect to liability arising out of the activities performed by or on behalf of the Contractor, involving automobiles, owned, leased, hired, or borrowed by the Contractor.”
Workers' Compensation and Employer’s Liability:
Workers' Compensation Statutory
Employer's Liability
• Each Accident - $1,000,000
• Disease - Each Employee - $1,000,000
• Disease - Policy Limit - $1,000,000
Policy shall contain a waiver of subrogation against the City of Prescott for losses arising from work performed by or on behalf of the Vendor / Contractor.
Professional Liability (Errors and Omissions Liability) – if applicable
• Each Claim $1,000,000
• Annual Aggregate $2,000,000
A. In the event that the professional liability insurance required by this Contract is written on a claims-made basis, Contractor warrants that any retroactive date under the policy shall precede the effective date of this Contract and that either continuous coverage will be maintained, or an extended discovery period will be exercised for a period of two (2) years at the time work under this contract is completed.
B. The policy shall cover professional misconduct or lack of ordinary skill for those positions defined in the Scope of Work of this contract.
Notice of Cancellation: With the exception of a ten (10) day notice of cancellation for non-payment of premium, any changes to material to compliance with this contract in the insurance policies above shall require thirty (30) day written notice.
Such policy shall not exclude coverage for the following:
A. Injury to or destruction of any property arising out of the collapse of/or structural injury to any building or structure due to grading of land, excavation, borrowing, filling, backfilling, tunneling, pile driving, cofferdam work or caisson work.
B. Injury to or destruction of wires, conduits, pipes, mains, sewers, or other similar property or any apparatus in connection therewith, below the surface of the ground, if such injury or destruction is caused by and occurs during the use of mechanical equipment for the purpose of grading of land, paving, excavating, drilling; or injury to or destruction of any property at any time resulting there from.
C. Injury to or destruction of any property arising out of blasting or explosion.
D. Motor vehicle public liability and property damage insurance to cover each automobile, truck, and other vehicle used in the performance of the Contract in an amount of not less than $1,000,000.00 for one person, and $1,000,000.00 for more than one person, and property damage in the sum of $1,000,000.00 resulting from any one accident which may arise from the operations of the Contractor in performing the work provided for herein.
The Contractor shall carry and maintain fire and extended coverage with an endorsement for vandalism and malicious mischief in Contractor's name and also in the name of the City in an amount of at least ONE HUNDRED PERCENT (100%) of the Contract amount (if applicable).
The Contractor shall secure "all risk" type builder's risk insurance for work to be performed. Unless specifically authorized by the City, the amount of such insurance shall not be less than ONE HUNDRED PERCENT (100%) of the contract price. Such policy shall include coverage for earthquake, landslide, flood, collapse, or loss due to the results of faulty workmanship, during the contract time and until final acceptance of work by the City (if applicable).
All insurance required pursuant to this Agreement must be written by an insurance company authorized to do business in the State of Arizona, to be evidenced by a Certificate of Authority as defined in A.R.S. § 20-217, a copy of which certificate is to be attached to each applicable bond or binder.
5. TERM OF CONTRACT
The initial term of the contract shall be for a period of three (3) years, with an estimated start date of November 9, 2026. The contract may be extended with the mutual consent of the City of
Prescott and Contractor/Supplier. If renewal results in changes of the terms or conditions, such changes shall be in writing as an amendment to the contract and such amendment shall not become effective until fully executed by both parties.
6. TERMINATION OF CONTRACT
The City reserves the right to terminate any part of or the entirety of any contract that may result from this proposal, without cause and at any time with thirty (30) calendar days’ written notice. In such a case, the consultant shall be paid for services rendered through the date of the termination notice, and the results of all such work through that date shall become the property of the City.
7. PROTEST POLICY
Any protest against the solicitation or award must be filed with the City Clerk’s Office by 4:00p.m.
up to ten (10) days after award. All such protests shall be in writing and contain the following: 1)
Name, address, email address and telephone number of the interested party; 2) Signature of the interested party or its representative; 3) Identification of the purchasing department and Project name; 4) Detailed statement of the legal and factual grounds for protest including copies of relevant documents; and 5) Form of relief requested. Protesting parties must demonstrate as part of their protest that they made every reasonable effort within the schedule and procedures of this solicitation to resolve the basis or bases of their protest during the solicitation process, including asking questions, seeking clarifications, requesting addenda, and otherwise alerting the City to perceived problems so that corrective action could be taken prior to the selection of the successful vendors. The City will not consider any protest based on items which could have been or should have been raised prior to the deadline for submitting questions or requesting addenda. The filing of a protest shall not prevent the City from executing an agreement with any other proposer.
8. BIDDING SCHEDULE
CONSTRUCTION ITEMS
Line Item Item Description Quantity Unit of
Measure Unit Cost Total
1 105.8 Construction Stakes, Lines and Grades
1 LS
2 107.15 Public Relations 1 ALL $50,000.00
3 107.16 Stormwater Pollution
Prevention Plan (SWPPP)
1 LS
4 109.1 Payment for
Mobilization/Demobilization
1 LS
5 109.11 Contract Allowance 1 ALL $4,120,000.00
6 401.8(A) Traffic Control Plan 1 LS
7 401.8(B) Flaggers 1,000 HR
8 401.8(C) Uniformed Off-Duty Law
Enforcement Officers
1 ALL $2,900.00
9 401.8(D) Barricades and Storage 1 LS
10 401.8(E) Message Boards 2,000 DY
11 401.8(G) Incidental Traffic Related
Items
1 LS
12 201a Tree Removal > 12"
Diameter
40 EA
13 201b Clearing & Grubbing 10 AC
14 205 Unsuitable Materials 2,300 CY
15 211 Fill Material 5,000 CY
16 301 Subgrade Preparation, 8"
Thick
36,980 SY
17 330.7 SP Asphalt Chip Seal, Low
Volume w/ PMM
49,510 SY
18 321a Asphalt Concrete (AC)
Pavement, 3" Thick
147 SY
19 321b Asphalt Concrete (AC)
Pavement, 4" Thick
13,479 SY
Line Item Item Description Quantity Unit of
Measure Unit Cost Total
20 321c Asphalt Concrete (AC)
Pavement, 5" Thick
3,991 SY
21 321d Asphalt Concrete (AC)
Pavement, 6" Thick
630 SY
22 336a Pavement Matching and
Replacement, 4" Thick
5 SY
23 336b Pavement Matching and
Replacement, 5" Thick
7,117 SY
24 336c Pavement Matching and
Replacement, 6" Thick
4,925 SY
25 336d Pavement Matching and
Replacement, 7" Thick
3,252 SY
26 321.13 SP Pavement Matching and
Replacement, 9" Thick
3,434 SY
27 310a Aggregate Base Course
(ABC), 6" Thick
2,042 CY
28 310b Aggregate Base Course
(ABC), 8" Thick
2,020 CY
29 310c Aggregate Base Course
(ABC), 10" Thick
3,265 CY
30 310d Aggregate Base Course
(ABC), 12" Thick
6,002 CY
31 310e Aggregate Base Course
(ABC), 18" Thick
482 CY
32 402.1a Thermoplastic Pavement
Striping, White (4"
Equivalent)
5,710 LF
33 402.2a Temporary Pavement
Striping, White (4"
Equivalent)
10,690 LF
34 402.2b Temporary Pavement
Striping, Yellow (4"
Equivalent)
32,635 LF
35 402.2c Temporary Pavement
Markings (Arrow, Symbol, or Legend)
113 EA
Unit Cost Total
36 402.3a Permanent Pavement
Striping, White (4"
Equivalent)
10,690 LF
37 402.3b Permanent Pavement
Striping, Yellow (4"
Equivalent)
32,635 LF
38 402.3c Permanent Pavement
Markings (Arrow, Symbol, or Legend)
113 EA
39 340a Concrete Curb & Gutter, QCSD 220Q-1, Type A
934 LF
40 340b Concrete Curb & Gutter, QCSD 220Q-1, Type B
51 LF
41 340c Concrete Curb & Gutter, QCSD 220Q-2, Type C
800 LF
42 340d Curb & Gutter, MAG Std.
Det. 220-2, Type F
71 LF
43 340e Curb & Gutter, AZDOT C-
05.10, Single Curb Type G
7 LF
44 340f Concrete 4' Sidewalk, QCSD
230Q
1,856 SF
45 340g Concrete 5' Sidewalk, QCSD
230Q
2,164 SF
46 340h Sidewalk Termination Ramp 73 SF
47 340i Local Street Sidewalk Ramp, QCSD 231Q-1
420 SF
48 340j 6' Valley Gutter & Spandrels, QCSD 240Q
3,695 SF
49 340k 3' Roll Curb Driveway, QCSD 251PV
928 SF
50 340l Return Type Driveway, QCSD 252Q
830 SF
51 340m Replace Existing Concrete
Driveway
230 SF
52 342 Interlocking Concrete Pavers in Roadway
900 SF
Unit Cost Total
53 324 SPa Concrete in Roadway 1,552 SF
54 324 SPb Colored Concrete in
Roadway
5,264 SF
55 350.6.1 Removal and Disposal 6" or
8" Friable ACP
309 LF
56 610a 6" Water Main & Fittings
(Restrained, DIP CL 350)
333 LF
57 610b 8" Water Main & Fittings
(Restrained, DIP CL 350)
290 LF
58 610c 12" Water Main & Fittings
(Restrained, DIP CL 350)
109 LF
59 630a 8" Tapping Sleeve and
Valves, QCSD 340Q-1
1 EA
60 630b 6" Gate Valve, Box, & Cover 2 EA
61 630c 12" Gate Valve, Box, &
Cover
1 EA
62 610d Water Service Connection, QCSD 316P-1
48 EA
63 610e Fire Hydrant, QCSD 360Q 4 EA
64 610.13 SP 1” Diameter Cross Lot
Service Connection
1 EA
65 612.1 (E) Temporary Water Mains (Fly
Lines), 1 EA
66 345a Water Valve Box
Adjustment, QCSD 391Q
59 EA
67 610f Utility Encasement 1 EA
68 650a Remove 6" PVC Water Main 58 LF
69 650b Remove 6" DIP Water Main 99 LF
70 650c Remove 8" PVC Water Main 28 LF
71 650d Remove 10" DIP Water Main 7 LF
72 650e Remove 12" DIP Water Main 35 LF
Unit Cost Total
73 200.1 SP Dewatering 1 LS
74 200.2 Bypass Pumping 1 LS
75 601a Rock Excavation for Sewer
Utility
34,299 CY
76 601.2.12 SP Leach Rock for Trench
Drainage
2,380 CY
77 611 Closed Circuit Television
Inspection
6,857 LF
78 615a 4" DIP Sewer CL 350 76 LF
79 615b 8" DIP Sewer CL 350 165 LF
80 615c 12" DIP Sewer CL 350 150 LF
81 615d 6" PVC Sewer SDR35 292 LF
82 615e 8" PVC Sewer SDR35 2,226 LF
83 615f 10" PVC Sewer SDR35 73 LF
84 615g 12" PVC Sewer SDR35 20 LF
85 615h 18" PVC Sewer SDR26 77 LF
86 615i 24" PVC Sewer SDR26 20 LF
87 SP06a Wager Company, 2050-50-
SA Odor Control Unit
3 EA
88 SP06b Wager Company, 2050-100-
SA Odor Control Unit
2 EA
89 615k Sewer Service Connection, QCSD 440P-1
37 EA
90 615l Sewer Main Cleanout, QCSD 441Q
4 EA
91 625a 48" Sewer Manhole, QCSD
420Q-1
3 EA
92 625b 60" Sewer Manhole, QCSD
420Q-1
5 EA
93 625c 48” Polymer Manhole 2 EA
Unit Cost Total
94 625d 60” Polymer Manhole 4 EA
95 625e 72” Polymer Manhole 20 EA
96 625f Inside Drop Manhole, QCSD
426Q-1
6 EA
97 625g Beaver Slide Manhole, QCSD 426Q-2
4 EA
98 345b Sewer Manhole Frame
Adjustment, QCSD 422Q
46 EA
99 345c Sewer Cleanout Frame
Adjustment, QCSD 270Q
1 EA
100 615m 26" HDPE Force Main DR11 2,510 LF
101 615n 26" HDPE Force Main
DR13.5
12,175 LF
102 615o 26"HDPE Force Main DR17 2,013 LF
103 615p 26" HDPE Force Main DR21 10,885 LF
104 651a Remove 4" CIP Sewer Main 21 LF
105 651b Remove 6" CIP Sewer Main 22 LF
106 651c Remove 8" PVC Sewer Main 16 LF
107 651d Remove 8" DIP Sewer Main 69 LF
108 651e Remove 8" HDPE Sewer
Main
42 LF
109 651f Remove 8" VCP Sewer Main 32 LF
110 651g Remove 10" PVC Sewer
Main
30 LF
111 651h Remove 10" DIP Sewer
Main
60 LF
112 651i Remove 12" VCP Sewer
Main
31 LF
113 651j Remove 12" DIP Sewer
Main
94 LF
Unit Cost Total
114 651k Remove 16" DIP Sewer
Main
44 LF
115 651l Remove 18" VCP Sewer
Main
48 LF
116 651m Remove 21" VCP Sewer
Main
52 LF
117 651n Remove 24" PVC Sewer
Main
9 LF
118 651o Remove 48" Sewer Manhole 2 EA
119 651p Remove 60" Sewer Manhole 5 EA
120 SP01a Hobas 18” CCFRPM, SN46
Sewer Main
108 LF
121 SP01b Hobas 24” CCFRPM, SN46
Sewer Main
3,650 LF
122 SP07 Sewer Force Main Drain
Manhole
16 EA
123 SP05a 24" Plug Valves 20 EA
124 SP05b 12" Plug Valves 1 EA
125 SP05c Sanitary Force Main Air and
Vacuum Release Valve, Vent-Tech Model 03SXG
19 EA
126 SP05d Sanitary Force Main Air and
Vacuum Release Valve, Vent-Tech Model 03SZG
11 EA
127 SP02 C3 Regional Lift Station per
Plans and Specifications by
Waterworks Engineers
1 LS
128 SP03a Abandon in Place Sewer
Main with Flowable CLSM
2,771 LF
129 SP03b Abandon in Place Sewer
Manhole with Flowable
CLSM
12 EA
130 SP09 PipeSak Geotextile Pipeline
Weight
158 EA
Unit Cost Total
131 505a Headwall, 'L' Type, MAG
Std. Det. 501-1
1 EA
132 618a 12" CMP Culvert 16 LF
133 618b 24" CMP Culvert 96 LF
134 618c 30" HDPE Culvert 8 LF
135 618d 30" CMP Culvert 16 LF
136 618e 36" CMP Culvert 8 LF
137 618f 68"x48" CMP Culvert 20 LF
138 505b Spillway Inlet Wing, MAG
Std. Det. 550
1 EA
139 220a Riprap, D50=9" 88 CY
140 220b Reno Mattress, 9" Thick 150 CY
141 220c Gabion Basket 687 CY
142 505c 8'-0" Curb Opening Catch
Basin - Type 'C', MAG Std.
Det. 532
1 EA
143 405 Survey Marker, Type 'A', QCSD 120Q
26 EA
144 430 Seeding (Hydraulic) 10 AC
145 350 Wood Fence 8 LF
146 420a Chain-link Fence with 3
Strands Barbed Wire, Mag
Std. Det. 160
9 LF
147 420b Chain-link Fence 90 LF
148 520 Safety Rail, QCSD 145Q 72 LF
TOTAL
9. PROPOSAL
Firms shall possess the qualifications and Arizona licenses as required by law. Responses to this
Request must be in the form of a proposal, as outlined in this document. The City assumes no liability for the cost of preparing a response to this Request.
Any deviations from the provisions of this Request which are desired by the Offeror shall be specifically noted in the proposal submitted.
9.1. PROPOSAL*
The Undersigned hereby declares that he has visited the site and has carefully examined the
Contract Documents relating to the work covered by the bid.
The Proposal Guarantee (Certified Check, Cashier's Check, or Electronic Bid Bond) attached, payable to the City of Prescott in the sum of not less than ten percent (10%) of the total bid price submitted for the complete project, to ensure that the Undersigned, if his/her bid is accepted, shall enter into contract and give the bonds and certificates of insurance required.
If the bidder uses a Certified Check or Cashiers Check for the Proposal Guarantee, said check/s shall be physically delivered to the Finance Department prior to the closing date and time of the bid. The Finance Department is located at 201 N. Montezuma Street, Second Floor, Suite 224, Prescott, Arizona 86301. Failure to deliver said Cashier or Certified Check/s in a timely manner may subject the bid to disqualification. In the event that the contract and bonds and certificates of insurance required are not furnished to the City within the time required, then and in that event the
City may retain from the proposal guarantee an amount, not to exceed the amount of the proposal guarantee, representing the difference between the amount specified in the proposal or bid, and such larger amount that the City in good faith contracts with another party to perform the work covered by the proposal or bid.
The project shall be completed within seven hundred twenty (720) calendar days after the starting date set forth in the NOTICE TO PROCEED.
The Undersigned hereby declares, as bidder, that the only persons or parties interested in this
PROPOSAL as principals are those named herein; that no elected official or employee of the City is in any manner interested directly or indirectly in this PROPOSAL or in the profits to be derived from the contract proposed to be taken, other than as permitted by law; that this bid is made without any connection with any other person or persons making a separate bid for the same purpose; that the bid is in all respects fair and without collusion or fraud; that he has read the NOTICE
INVITING BIDS, CONTRACT DOCUMENTS AND PROJECT SPECIFICATIONS, and agrees to furnish the items and perform the work called for in accordance with the provisions of said form of Contract and the Specifications and to deliver the same within the time stipulated herein, and that he will accept in full payment therefore the total bid price named in this Proposal.
The bidder shall be an A-General Engineering contractor properly licensed in the State of Arizona at the time of bidding to perform construction in connection with fixed works, including streets, roads, power and utilities plants, dams, hydroelectric plants, sewage and waste disposal plants, bridges, tunnels, and overpasses and shall also be licensed to perform work within residential and commercial property lines, or shall be properly licensed to sub-contract residential or commercial work, as may be required in the Scope of Work.
Any bid submitted without the proper contracting license to perform the required work shall be considered non-responsive and rejected.
The bidder further agrees that, upon receipt of written notice of the acceptance of this PROPOSAL, he will execute the Contract in accordance with the PROPOSAL as accepted and furnish the required bonds TEN (10) days from the date of mailing of said Notice of Award to him at his address as given, or within such additional time as may be allowed by the City; and that upon his failure or refusal to do so within said time, then the certified or cashier's check or bid bond accompanying this bid shall be cashed or enforced and the money payable pursuant thereto shall be forfeited to and become the property of the City as liquidated damages for such failure or refusal; provided that if said bidder shall execute the Contract and furnish the required bonds within the aforesaid time, his certified or cashier's check, if furnished, shall be returned to him within three (3) days thereafter, and the bid bond, if furnished, shall become void.
Bidder understands and agrees that the City reserves the right to reject any or all bids and to waive any informality in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving bids.
☐ Please confirm
*Response required
9.2. SUBCONTRACTORS LIST*
Please download the below document, complete, and upload here as part of your proposal.
• Subcontractors_List.pdf
*Response required
9.3. PROPOSED STAGING LOCATIONS*
Please download the below document, complete, and upload here as part of your proposal.
• Proposed_Staging_Locations.pdf
*Response required
9.4. DISCLOSURE*
Identify any public or private disciplinary actions against your firm or individuals within your firm that occurred within the past five (5) years and would be relevant to this contract. This includes action by professional organizations or oversight committees.
Report any significant material litigation information that would be relevant to this contract.
Disclose any investigation (involving your firm or individuals) conducted in the past five (5) years of any federal or state regulatory agency that might have an impact on this contract.
The firm's response shall be on the firm’s company letterhead and shall be signed by an officer or principal of the firm with contracting authority.
Please upload a PDF document here.
*Response required
9.5. PROPRIETARY INFORMATION*
All materials submitted in response to the solicitation, including samples, shall become the property of the City and are therefore subject to public release, upon request, after the Contract award. Firms shall clearly mark any proprietary information contained in its submittal with the https://government-project.s3.us-west-2.amazonaws.com/156311/590f28dc-5f52-4d1e-9685-3a67b179ae8e_Subcontractors_List.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4H45K3DDN%2F20260828%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260828T210017Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEI3%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCNAKSL2MrAkKbUVmDC%2FC576L4%2FbqVh1rmrp%2B%2FCdRtxwAIgcq%2B6ULJCFLZ36aVoDWlOEsbfXT43fZfJ1BK4AmoiqzoqjAUIVhACGgw4OTIzNjQ2ODc2NzIiDMykAsX1F40ERzVwKCrpBGPl8di1fH1ghieb6OJpepTPPRq4nPOhCvCba1FJFEUUyZUJ%2BmYX7GiRHbMF%2BbqVYbEfkM43UiKY5adCJnikPG%2FH2t6l9124mqX3UmzjOAVROfTFJ3iWXtY6w8b3EKTsA2SXstdbYApxAh0adabu8MiSsKICTE0RCb92KEH5qMqXEopZlyOUj4Fk8Z1LF%2Fkjv3%2FERHiMoY0SkiSA9UJobcNE%2Fxva7wPtYtfwul%2FdGAlGXzW30DaoQqhItxXbT%2FAzdJOMDplxiOe%2BvqbgH43ow8fl6H%2FccUnak3KWsNPpItbciHQXjP0qEhuqPczAXUhnct00UJ6LcZoTyYZ9CuC5WLSZlPHX%2Bv5UTfKmpum3ZqEiQed8jf6Oc2qslXuHXjsnm80u8QaWI%2BOIn2PDZSF%2F8BLZjmfUfRe9wdcsnnxcQq772h7UGQ7OGA44p9lq1ky%2Bd%2FMdtisZ7AthPYxInTxQnHeTcwEOaLWQNk2EP4uLFNPrqPoj%2F9fgOR2JMX4wEqJxb13sklLL7p0PIe%2B1tzPUjm7p0HHZHJgXRFhfiYAhTFQ13u8N1TacYfnA4lKq93wPtFJXj58paWQXKIodFLy91vv2Zts6mbgcFdYFzDe24vQFxWUQ%2B9AUFsHyYsgLsgs0M5EoxCulxejqqMs%2BUtl8i1qCHoG44hG79H7Fj7IU0DR9QFZQKm599TYG0gUGxf35A5anpSEujgEwm7QSvtXhf2%2Fhxg9GQFN7fcmJCU0GqlWd%2FSovh6sE35E8x9iXN5v0w06eOeAZMXuJVCH7fzos2VURUTWtUGj30Fdo9ULzxO%2FZbODGaJ51RgqUMK%2Fmx9QGOpkBxXU1WVERbEsIzxyKVL14K0LDJpngwOTV5MVmKXROcdQquts6RcdD8q2EZBqP4M5ZifhitC6mKSsiichd%2FEiejXB4zNNEiJlL3t6640vxTjCtQrgNOCbzr7tdRYQlosec7MKJlLUHu7NnvOkvNc4jLub3o6aMKbi2PMW%2BJKe3afP57evAGUMFyAU4eFUnobwvnmX4dHsnMeyH&X-Amz-Signature=750bcb63b2f4ff6cb34ec9d051058f8a6d36cc0b5df07016945fb3c21da7d696&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Subcontractors_List.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/156311/158dec7b-359d-4984-99c3-80f67456c8d1_Proposed_Staging_Locations.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4H45K3DDN%2F20260828%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260828T210017Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEI3%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCNAKSL2MrAkKbUVmDC%2FC576L4%2FbqVh1rmrp%2B%2FCdRtxwAIgcq%2B6ULJCFLZ36aVoDWlOEsbfXT43fZfJ1BK4AmoiqzoqjAUIVhACGgw4OTIzNjQ2ODc2NzIiDMykAsX1F40ERzVwKCrpBGPl8di1fH1ghieb6OJpepTPPRq4nPOhCvCba1FJFEUUyZUJ%2BmYX7GiRHbMF%2BbqVYbEfkM43UiKY5adCJnikPG%2FH2t6l9124mqX3UmzjOAVROfTFJ3iWXtY6w8b3EKTsA2SXstdbYApxAh0adabu8MiSsKICTE0RCb92KEH5qMqXEopZlyOUj4Fk8Z1LF%2Fkjv3%2FERHiMoY0SkiSA9UJobcNE%2Fxva7wPtYtfwul%2FdGAlGXzW30DaoQqhItxXbT%2FAzdJOMDplxiOe%2BvqbgH43ow8fl6H%2FccUnak3KWsNPpItbciHQXjP0qEhuqPczAXUhnct00UJ6LcZoTyYZ9CuC5WLSZlPHX%2Bv5UTfKmpum3ZqEiQed8jf6Oc2qslXuHXjsnm80u8QaWI%2BOIn2PDZSF%2F8BLZjmfUfRe9wdcsnnxcQq772h7UGQ7OGA44p9lq1ky%2Bd%2FMdtisZ7AthPYxInTxQnHeTcwEOaLWQNk2EP4uLFNPrqPoj%2F9fgOR2JMX4wEqJxb13sklLL7p0PIe%2B1tzPUjm7p0HHZHJgXRFhfiYAhTFQ13u8N1TacYfnA4lKq93wPtFJXj58paWQXKIodFLy91vv2Zts6mbgcFdYFzDe24vQFxWUQ%2B9AUFsHyYsgLsgs0M5EoxCulxejqqMs%2BUtl8i1qCHoG44hG79H7Fj7IU0DR9QFZQKm599TYG0gUGxf35A5anpSEujgEwm7QSvtXhf2%2Fhxg9GQFN7fcmJCU0GqlWd%2FSovh6sE35E8x9iXN5v0w06eOeAZMXuJVCH7fzos2VURUTWtUGj30Fdo9ULzxO%2FZbODGaJ51RgqUMK%2Fmx9QGOpkBxXU1WVERbEsIzxyKVL14K0LDJpngwOTV5MVmKXROcdQquts6RcdD8q2EZBqP4M5ZifhitC6mKSsiichd%2FEiejXB4zNNEiJlL3t6640vxTjCtQrgNOCbzr7tdRYQlosec7MKJlLUHu7NnvOkvNc4jLub3o6aMKbi2PMW%2BJKe3afP57evAGUMFyAU4eFUnobwvnmX4dHsnMeyH&X-Amz-Signature=bbf2a97cd060982b7d78170027d43a14b2fc8f3258c06bfc40b61e32386040f4&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Proposed_Staging_Locations.pdf%22&x-id=GetObject words “Proprietary Information”. Firms shall not mark any Solicitation Form as proprietary.
Marking all or nearly all of a submittal as proprietary may result in rejection of the submittal.
Firms should be aware that the City is required by law to make its records available for public inspection. All firms, by submission of materials marked proprietary, acknowledge, and agree that the City will have no obligation to advocate for non-disclosure in any form nor will the City assume any liability to the firms in the event that the City must legally disclose these materials.
The letter shall be on the firm’s company letterhead and shall be signed by an officer or principal of the firm with contracting authority.
Please upload a PDF document here.
*Response required
9.6. CERTIFICATIONS*
Please upload all requested certifications in PDF format here.
*Response required
9.7. ADDITIONAL INFORMATION (IF NEEDED)
For any additional information requested or required by any of your previously provided answers or as stated within this Notice Inviting Bids please upload the additional documentation here.
If needed, please upload a PDF document here.
9.8. BIDDER QUALIFICATIONS, REPRESENTATIONS AND WARRANTIES
9.8.1. TAXES AND LIENS*
The Bidder hereby certifies as follows:
Bidder has no unsatisfied tax or judgment lien on record.
☐ Please confirm
*Response required
9.8.2. BIDDER'S CERTIFICATE*
Proposer, being first duly sworn, deposes and says: That he/she who submits herewith to the City of Prescott, Arizona, a Proposal:
That all statements of fact in such Proposal are true.
That said Proposal was not made in the interest of or on behalf of any disclosed person, partnership, company, association, organization, or corporation.
That said bidder has not, directly, or indirectly by agreement, communication, or conference with anyone attempted to induce action prejudicial to the interest of the City of Prescott, Arizona, or of any bidder or anyone else interested in the proposed contract; and further, That prior to the public opening and reading of proposal, said bidder:
A. Did not directly or indirectly, induce or solicit anyone else to submit a false or sham proposal;.
B. Did not directly or indirectly collude, conspire, connive or agree with anyone else that said bidder or anyone else would submit a false or sham proposal, or that anyone should refrain from bidding or withdraw his proposals;
C. Did not in any manner, directly or indirectly, seek by agreement, communication or conference with anyone to raise or fix the proposal price of said bidder or of anyone else, or to raise or fix any overhead, profit or cost element of his proposal price, or of that of anyone else;
D. Did not, directly or indirectly, submit his proposed price or any breakdown thereof, or the contents thereof, or divulge information or data relative thereto, to any corporation, partnership, company, association organization, bid depository or to any member or agent thereof, or to any individual or group of individuals, except the City of Prescott, Arizona, or to any person or persons who have a partnership or other financial interests with said bidder in his business.
☐ Please confirm
*Response required
9.8.3. PROPOSAL CERTIFICATION*
The undersigned Proposer hereby certifies as follows:
That he/she has read The City of Prescott’s solicitation documents, its appendices and attachments, and the following Addenda, and to the best of his/her knowledge, has complied with the mandatory requirements stated therein.
That he/she has had opportunity to ask questions regarding the solicitation, and that such questions having been asked, have been answered by the City.
That the Proposer’s proposal consists of all forms required by this Notice Inviting Bids.
That the Proposer’s bid is valid for 90 days.
☐ Please confirm
*Response required
9.9. MANDATORY REQUIREMENTS
The following criteria are mandatory for submitting proposals.
9.9.1. REGISTRAR OF CONTRACTORS LICENSE*
Vendor must have applicable ROC license. Enter License number here.
*Response required
9.9.2. ARIZONA CORPORATION COMMISSION BUSINESS STATUS*
Vendor must be in good standing with the Arizona Corporation Commission. Enter business name here.
*Response required
9.9.3. DEBARMENT/SUSPENSION VERIFICATION*
Please enter the business name here.
*Response required
9.9.4. SURETY2000 BID BOND VERIFICATION*
Please enter your Bid Bond information from Surety2000 below.
*Response required
9.9.5. BONDING CAPACITY*
I hereby certify that the firm is bondable to the projected amount of the project from an AM Best, Inc. rating of “A” or better surety company if the firm is awarded the contract.
☐ Please confirm
*Response required
| 1. Notice to Proposers |
| 2. General Information |
| 2.1. Mandatory Pre-Bid Conference |
| 2.2. Requests for Information |
| 2.3. Contact Information |
| 2.4. Proposed Project Schedule |
| 3. Scope of Work |
| 3.1. Scope of Work |
| 3.2. Description of Work |
| 4. Contract Negotiation and Award |
| 4.1. Overview |
| 4.2. Award of Contract |
| 4.3. Construction Insurance Requirements |
| 5. Term of Contract |
| 6. Termination of Contract |
| 7. Protest Policy |
| 8. Bidding Schedule |
| 9. Proposal |
| 9.1. Proposal* |
| 9.2. Subcontractors List* |
| 9.3. Proposed Staging Locations* |
| 9.4. Disclosure* |
| 9.5. Proprietary Information* |
| 9.6. Certifications* |
| 9.7. Additional Information (if needed) |
| 9.8. Bidder Qualifications, Representations and Warranties |
| 9.8.1. Taxes and Liens* |
| 9.8.2. Bidder's Certificate* |
| 9.8.3. Proposal Certification* |
| 9.9. Mandatory Requirements |
| 9.9.1. Registrar of Contractors License* |
| 9.9.2. Arizona Corporation Commission Business Status* |
| 9.9.3. Debarment/Suspension Verification* |
| 9.9.4. Surety2000 Bid Bond Verification* |
| 9.9.5. Bonding Capacity* |