Summary of Work_Draft 29Jun21.pdf

PDF 80 KB Posted

Attached to
Task Force Operations Center, Kingdom of Jordan
Solicitation number
W912ER21R0036
Issued by

About this file

This pre-solicitation notice is for a two-phase design-build contract to construct a Task Force Operations Center in Jordan. The Army Corps of Engineers will award a firm-fixed-price contract for the design and construction of a modular facility at King Abdullah II Air Base, including a pre-engineered metal building, site preparation, utilities, and optional stadium seating and backup power. Phase One involves a technical evaluation of up to five offerors' qualifications. Phase Two will issue the solicitation to those firms and evaluate price proposals against technical requirements. The Army Corps of Engineers intends to make one award by the conclusion of Phase Two evaluations using best value tradeoff source selection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

497241

SECTION 01 11 00 Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

-- End of Section Table of Contents --

SECTION 01 11 00 Page 2

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

The purpose of this Design Build project is to design and construct a Task Force Operations Center on King Abdullah II Air Base, Jordan in accordance with US standards. The project shall be awarded with base bid items and include the potential for options as specified in paragraph 1.3.

1.2 SUMMARY OF WORK

This design-build project involves the design and construction of a Pre- Engineered Metal Building (PEMB)with overall dimensions of 100 feet long x 100 feet wide with a 15 feet wide x 53 feet long extension. The PEMB shall have a roof slope of 2:12. The eave height of the building shall be 22 feet. The building will be built out in the interior with Offices, latrines, and a raised stadium flooring auditorium room. The building will also require HVAC, electrical, and other utilities. The final complete structure shall provide a dust-free and moisture-free environment when the doors are closed under all weather conditions. The moisture-free environment shall be achieved without any additional tarps or rain flies.

1.2.1 Pre-Engineered Metal Building

Contractor shall utilize provided drawings and technical requirements herein to develop a fully design, code-compliant facility. Facility shall be of size, configuration and adjacencies as shown in provided drawings without deviation.

1.2.2 Supporting Facilities, Site Development, and Utilities

The Contractor shall design and construct the supporting facilities, site layout, grading and drainage, and site utilities as described in the contract documents. Floor plans along with other design information shown in this document are "typical" and are included to communicate requirements. They do not relieve the Contractor from providing a detailed design.

1.2.3 The Contractor shall develop and submit a final layout for all facilities based on the known requirements taking into consideration the utilities to be extended to the magazines, maintaining positive drainage and minimizing site work.

SECTION 01 11 00 Page 3

1.2.4 Investigations and Surveys

The Contractor shall perform topographic survey for the project area and conduct geotechnical investigations for the structures and pavements. Based on the findings of the geotechnical investigation, the Contractor shall provide foundation design for the design build facilities. Based on the findings of the topographical investigations, the Contractor shall review the site layout plan to either confirm or propose changes to provide sufficient drainage.

1.3 BASE BIDS

The base bid includes the construction of the Pre-Engineered Metal Building including security lighting, site preparation, and site utilities serving the base bid items.

1.4 OPTIONS

Optional bid items include:

• Stadium Seating

• Emergency Backup Power Supply

-- End of Section --