Successful Offerors - To participate In phase 2.pdf
PDF 105 KB Posted
- Solicitation number
- Not on record
About this file
This document is a Special Notice identifying five offerors selected to participate in Phase 2 of a Design-Build acquisition for a Child Development Center (CDC) at Randolph Air Force Base in San Antonio, Texas. The selected construction firms are StructSure Projects (Kansas City, MO), Clark Construction Group, LLC (Bethesda, MD), AR6-White Construction, LLC (New Braunfels, TX), SGS, LLC (Yukon, OK), and Bryan Construction Inc. (Colorado Springs, CO).
The project involves constructing a large CDC utilizing a Two-Phase Design-Build process in accordance with FAR 36.3 procedures. The facility will include comprehensive developmental spaces for various child age groups (infants through preschoolers), administrative areas, lobby, restrooms, storage, kitchen, playground, and supporting infrastructure. Specific construction elements include concrete foundation, floor slabs, structural steel frame, masonry walls, standing seam metal roof, security systems, CCTV, and associated utilities. The solicitation number is W9126G24R0126, and the project is being managed by the Department of the Army Corps of Engineers Engineering District Fort Worth.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The following five (5) offerors will be invited to participate in Phase 2 of this acquisition for Solicitation Number: W9126G24R0126, Child Development Center, Randolph Air Force Base, San Antionio, Texas.
StructSure Projects ATTN: Mr. Kevin Rogers, CEO 903 E 104th St., Suite 140 Kansas City, MO 64131
Clark Construction Group, LLC Attn: Ms. Cara K. Lanigan, CEO 7500 Old Georgetown Road Bethesda, MD 20814
AR6-White Construction, LLC Attn: Mr. John C. Anness II, President 26726 Rockwell Parkway New Braunfels, TX 78132
SGS, LLC
ATTN: Mr. Eddie Scott, President 2121 Sough Mustang Road Yukon, OK 73099
Bryan Construction Inc.
ATTN: Mr. Rusty Chamberlain, Executive 5475 Tech Center Drive, Suite 300 Colorado Springs, CO 80919, USA
This project is a Design Build construction of a large Child Development Center (CDC) utilizing the standard facility design using a Two-Phase Design Build process in accordance with FAR 36.3-Two-Phase Design-Build Selection Procedures at JBSA Randolph which will include child development areas for infants, pre-toddlers, toddlers, preschoolers, administrative space, lobby areas, public restrooms, storage rooms, kitchen and equipment, playground areas and equipment, security system, CCTV, utilities, concrete foundation, concrete floor slabs, structural steel frame, masonry walls, standing seam metal roof, and all associated support.
File details come from the government source that posted it. Updated .