Subcontractor_Listing.pdf
PDF 224 KB Posted
- Attached to
- Police Department Off Highway Vehicles (OHV)
- Solicitation number
- 2026-IFB-LM-0588
- Issued by
- Los Angeles County, California
About this file
This is a Subcontractor Listing document related to the Pasadena Police Department's procurement of Off-Highway Vehicles (OHV) in California. The document identifies subcontractors and their roles in supporting the delivery of 2-5 off-highway vehicles for police operations in and around the Rose Bowl. The contract is structured as a three-year agreement with provisions for follow-on orders, with the first two vehicles to be procured immediately to meet the department's operational needs.
The subcontractor listing provides transparency regarding the parties involved in the vehicle supply and support chain, though specific pricing terms, funding sources, and contract award details are not evident from this document alone. No set-asides are explicitly indicated in the provided file. The document serves as a reference for identifying the qualified vendors and subcontractors participating in the fulfillment of this procurement opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Police_Department_Off_Highway_Vehicles_(OHV).pdf | ||
| MASTER_LABOR_AND_MATERIALS_CONTRACT_(12-18-24).pdf | ||
| REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf | ||
| Bed_RAck.png | PNG image | |
| Rancher_Bumper.png | PNG image | |
| CAN-AM_Front.png | PNG image | |
| Emergency_FEMA_TC.pdf | ||
| DoIT_Technical_Questionnaire.xlsx | XLSX spreadsheet | |
| Disclosure_of_Lobbying_Activities.pdf | ||
| RELEVANT_EXPERIENCE_FORM.pdf | ||
| Unique_Entity_ID_(SAM).pdf | ||
| Federal_Required_Certification_(4).pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor Listing/Shoring Design
SUBCONTRACTOR LISTING
Names (s) Address Description of Work
SHORING DESIGN
If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.
Engineer Names (s) Address Description of Work
| Names s 1: |
| Names s 2: |
| Names s 3: |
| Names s 4: |
| Names s 5: |
| Names s 6: |
| Names s 7: |
| Address 1: |
| Address 2: |
| Address 3: |
| Address 4: |
| Address 5: |
| Address 6: |
| Address 7: |
| Description of Work 1: |
| Description of Work 2: |
| Description of Work 3: |
| Description of Work 4: |
| Description of Work 5: |
| Description of Work 6: |
| Description of Work 7: |
| Engineer Names s 1: |
| Engineer Names s 2: |
| Engineer Names s 3: |
| Engineer Names s 4: |
| Engineer Names s 5: |
| Engineer Names s 6: |
| Address 1_2: |
| Address 2_2: |
| Address 3_2: |
| Address 4_2: |
| Address 5_2: |
| Address 6_2: |
| Description of Work 1_2: |
| Description of Work 2_2: |
| Description of Work 3_2: |
| Description of Work 4_2: |
| Description of Work 5_2: |
| Description of Work 6_2: |
File details come from the government source that posted it. Updated .