MAINTENANCE YARDS EV CHARGER EXPANSION
Solicitation number
2026-IFB-LM-0141
Issued by
Los Angeles County, California

About this file

This is a Subcontractor Listing form for the Maintenance Yards EV Charger Expansion project managed by Pasadena Water & Power (PWP) in California. The form requires contractors to identify and list all subcontractors who will perform work on the project, with specific attention to shoring design requirements. If shoring is required as part of the project, the Civil or Structural Engineer responsible for designing the shoring must be listed, whether that engineer is employed directly by the contractor or is a subcontractor. The form provides space for up to seven subcontractors and up to six shoring design engineers, with fields for each entry to include the subcontractor or engineer name(s), address, and description of work to be performed. If no shoring is required for the project, the form instructs contractors to indicate "NONE" in the appropriate section.

This document serves as a transparency and accountability measure for the PWP EV Charger Expansion Project, which involves constructing EV charging infrastructure at PWP maintenance yards with all labor, materials, equipment, and supervision provided by the contractor in accordance with approved design drawings and specifications. The form does not address pricing, set-asides, or contract terms, as it functions purely as a subcontractor disclosure document that must be completed as part of the contractor's bid submission to ensure the City has visibility into the project's team structure and specialized consultant involvement.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .