Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Tree Trimming, Vegetation Management, and Emergency Response Services for Power Line Clearance
Solicitation number
2025-IFB-LM-0407
Issued by
Los Angeles County, California

About this file

This is a Subcontractor Listing form for a tree trimming, vegetation management, and emergency response services procurement issued by Pasadena Water and Power (PWP) in California. The form is designed to capture subcontractor information for shoring design work, if required as part of the project, with designated sections for up to seven subcontractors and up to six engineers specializing in shoring design. The underlying contract opportunity involves comprehensive power line clearance services throughout Pasadena, including tree trimming, removal, brush clearing, and weed abatement to maintain electrical infrastructure safety and mitigate wildfire risks. The solicitation requires contractors to deploy a minimum of six two-person power line clearance crews with an estimated 14,560 crew hours annually. Bids were due by 4:00 pm on September 18, 2025, with a project release date of August 28, 2025. The initial contract term is three years from execution, with three optional one-year extensions available.

All work must comply with OSHA 1910.269 and California Code of Regulations standards, with contractors required to hold C-49 or C-61/D-49 licenses and maintain Line Clearance Tree Trimmer certifications. Insurance requirements are substantial, including $5,000,000 Commercial General Liability coverage, $1,000,000 Automobile Liability coverage, and workers' compensation as mandated by California law. Award will be made to the lowest responsive and responsible bidder meeting minimum qualification requirements. The procurement is open to all qualified contractors without specific set-aside designations, though local Pasadena and California-based contractors may have competitive advantages under the city's local business and workforce development preferences. Contractors must provide a Unique Entity Identifier from SAM.gov, prevailing wage compliance documentation, and evidence of robust emergency response capabilities and equipment.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .