Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
SCRAP METALS PURCHASE AND REMOVAL
Solicitation number
2022-IFB-LM-186
Issued by
Los Angeles County, California

About this file

The document is a Subcontractor Listing/Shoring Design form related to the City of Pasadena's scrap metals purchase and removal contract opportunity. The form provides blank tables for listing subcontractors and potential shoring design engineers, with instructions to complete the tables if applicable. The form requires contractors to list the names, addresses, and descriptions of work for subcontractors and any engineers responsible for shoring design.

Specific instructions note that if shoring is required for the project, the Civil or Structural Engineer who designs the shoring must be listed, even if they are employed by the contractor. If no shoring is needed, the contractor should write "NONE" in the designated section. This form appears to be a standard documentation requirement for the contract, allowing the City of Pasadena to have a clear record of all subcontractors and potential engineering support involved in the project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .