STS RFI Attachment 2 - MASTER - STS_LOG DOCS SERVICES CDRLS_1 July 24.docx

DOCX document 399 KB Posted

Attached to
Request for Information (RFI) Sustainment Transport System (STS)
Solicitation number
RFI-STS-070224-JJY
Issued by

About this file

This document contains multiple Contract Data Requirements Lists (CDRLs) for a federal contract opportunity to provide logistics support for the Sustainment Transport System (STS). The CDRLs outline required deliverables such as a Human Systems Integration Program Plan, Human Systems Integration Report, Training Materials, Government Property Inventory Report, Integrated Master Schedule, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation Plan and Report, Safety Assessment Report, Logistics Family Tree, and Product Data.

The key details include the required contents, submission dates, and distribution instructions for each CDRL. The contract is managed by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The solicitation is a Request for Information (RFI) to establish logistics support for STS terminal variants and configurations, including analysis, provisioning, technical manuals, training, and technical data packages. No specific pricing, set asides, or incumbents are provided in the CDRLs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

HFAC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS SATCOM

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A001-101
Human Systems Integration Program Plan
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-HFAC-81743A
PWS 3.5.4.2.1
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

SEE BLOCK 16

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

BLOCK 9:

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall provide a Human Systems Integration Program Plan (HSIPP) with details indicating the scope and extent of Human System Integration (HSI) activities and resources planned and required to meet all coordinated and designated PMs HSI objectives. The Contractor shall optimize HSI criteria, describe and prioritize all HSI activities, identify required Human Factors Engineering (HFE) design inputs and resources, while indicating issues and risks.

Note: HFE activities shall include events, i.e.… usability studies, Soldier’s User Juries, Focus Groups, interviews, etc…with direct input and feedback from the prescribed system operator/maintainer Military Occupational Specialty (MOS) category/type (system’s user).

The Contractor shall provide draft of CDRL for early engagement and coordination with PMs HSI lead prior to CDRL submittal. The first submittal of CDRL is required twenty (30) business days after contract award. Government requires twenty (20) business days for review and comment. Submit final plan twenty (20) days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

Brandon Norwood, COR - STS

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
1
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

HFAC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS LOS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A001-201
Human Systems Integration Program Plan
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-HFAC-81743A
PWS 3.5.4.2.1
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall provide a Human Systems Integration Program Plan (HSIPP) with details indicating the scope and extent of Human System Integration (HSI) activities and resources planned and required to meet all coordinated and designated PMs HSI objectives. The Contractor shall optimize HSI criteria, describe and prioritize all HSI activities, identify required Human Factors Engineering (HFE) design inputs and resources, while indicating issues and risks.

Note: HFE activities shall include events, i.e.… usability studies, Soldier’s User Juries, Focus Groups, interviews, etc…with direct input and feedback from the prescribed system operator/maintainer Military Occupational Specialty (MOS) category/type (system’s user).

The Contractor shall provide draft of CDRL for early engagement and coordination with PMs HSI lead prior to CDRL submittal. The first submittal of CDRL is required thirty (30) business days after contract award. Government requires twenty (20) business days for review and comment. Submit final plan twenty (20) days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
2
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

HFAC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS WIFI

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A001-301
Human Systems Integration Program Plan
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-HFAC-81743A
PWS 3.5.4.2.1
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall provide a Human Systems Integration Program Plan (HSIPP) with details indicating the scope and extent of Human System Integration (HSI) activities and resources planned and required to meet all coordinated and designated PMs HSI objectives. The Contractor shall optimize HSI criteria, describe and prioritize all HSI activities, identify required Human Factors Engineering (HFE) design inputs and resources, while indicating issues and risks.

Note: HFE activities shall include events, i.e.… usability studies, Soldier’s User Juries, Focus Groups, interviews, etc…with direct input and feedback from the prescribed system operator/maintainer Military Occupational Specialty (MOS) category/type (system’s user).

The Contractor shall provide draft of CDRL for early engagement and coordination with PMs HSI lead prior to CDRL submittal. The first submittal of CDRL is required thirty (30) business days after contract award. Government requires twenty (20) business days for review and comment. Submit final plan twenty (20) days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
3
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

HFAC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS SATCOM

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002-101
Human Systems Integration Report
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-HFAC-81833A
PWS 3.5.4.2.2
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall conduct a Human System Integration program and provide a Human System Integration Report (HSIR), which shall include HFE analysis of the STS hardware, software and workstations/terminals, with emphasis on the soldiers tasks associated with operating the STS systems/variants. As part of the report, the contractor shall describe all HSI activities, HSI design inputs, HSI accomplishments and indicate status and risk of all HSI issues. The report shall include the progress of HSI issues and associated corrective actions and mitigation plans.

Note: HFE activities shall include events, i.e… usability studies, Soldier’s User Juries, Focus Groups, interviews, etc…with direct input and feedback from the prescribed system operator/maintainer Military Occupational Specialty (MOS) category/type (system’s user).

The Contractor shall submit a draft CDRL twenty (20) business days after conclusion of the Logistics Demonstration. The Government requires twenty (20) business days for review and comment. Submit final report twenty (20) business days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
4
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

HFAC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS LOS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002-201
Human Systems Integration Report
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-HFAC-81833A
PWS 3.5.4.2.2
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall conduct a Human System Integration program and provide a Human System Integration Report (HSIR), which shall include HFE analysis of the STS hardware, software and workstations/terminals, with emphasis on the Soldiers’ tasks associated with operating the STS systems/variants. As part of the report, the contractor shall describe all HSI activities, HSI design inputs, HSI accomplishments and indicate status and risk of all HSI issues. The report shall include the progress of HSI issues and associated corrective actions and mitigation plans.

Note: HFE activities shall include events, i.e… usability studies, Soldier’s User Juries, Focus Groups, interviews, etc…with direct input and feedback from the prescribed system operator/maintainer Military Occupational Specialty (MOS) category/type (system’s user).

The Contractor shall submit a draft CDRL twenty (20) business days after conclusion of the Logistics Demonstration. The Government requires twenty (20) business days for review and comment. Submit final report twenty (20) business days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
5
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

HFAC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS WI-FI

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002-301
Human Systems Integration Report
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-HFAC-81833A
PWS 3.5.4.2.2
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall conduct a Human System Integration program and provide a Human System Integration Report (HSIR), which shall include HFE analysis of the STS hardware, software, and workstations/terminals, with emphasis on the Soldier’s tasks associated with operating the STS systems/variants. As part of the report, the contractor shall describe all HSI activities, HSI design inputs, HSI accomplishments and indicate status and risk of all HSI issues. The report shall include the progress of HSI issues and associated corrective actions and mitigation plans.

Note: HFE activities shall include events, i.e… usability studies, Soldier’s User Juries, Focus Groups, interviews, etc…with direct input and feedback from the prescribed system operator/maintainer Military Occupational Specialty (MOS) category/type (system’s user).

The Contractor shall submit a draft CDRL twenty (20) business days after conclusion of the Logistics Demonstration. The Government requires twenty (20) business days for review and comment. Submit final report twenty (20) business days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
6
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

ILSS

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS SATCOM

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

B001-101
Training Materials
Documentation/Materials/Presentation/ Training Tools – STS SATCOM
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-ILSS-80872
PWS 3.5.2.6.1
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 10-13:

Contractor shall prepare and submit training materials for 30%, 70%, 100% in accordance with the approved IMS. Delivery of training material submissions shall be five (5) business days prior to associated training conferences. Government will provide comments at the conferences and will review with the contractor. The final submission of training materials is due ten (10) business days after the conduct of the training verification event.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU. In addition, to the distribution requirements identified in block 14 relative to review and approval of the training materials the contractor shall deliver one hard copy of the training and one electronic copy of the training per STS SATCOM for each fielding event conducted under the contract per the reference PWS sections in block 5.

The Contractor shall provide additional revisions as new/revised system baseline changes occur that impact the training.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
7
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

ILSS

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS LOS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

B001-201
Training Materials
Documentation/Materials/Presentation/ Training Tools – STS LOS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-ILSS-80872
PWS 3.5.2.6.1
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 10-13:

Contractor shall prepare and submit training materials for 30%, 70%, 100% in accordance with the approved IMS. Delivery of training material submissions shall be five (5) business days prior to associated training conferences. Government will provide comments at the conferences and will review with the contractor. The final submission of training materials is due ten (10) business days after the conduct of the training verification event.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU. In addition, to the distribution requirements identified in block 14 relative to review and approval of the training materials the contractor shall deliver one hard copy of the training and one electronic copy of the training per STS LOS for each fielding event conducted under the contract per the reference PWS sections in block 5.

The Contractor shall provide additional revisions as new/revised system baseline changes occur that impact the training.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
8
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

ILSS

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS WI-FI

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

B001-301
Training Materials
Documentation/Materials/Presentation/ Training Tools – STS WI-FI
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-ILSS-80872
PWS 3.5.2.6.1
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 10-13:

Contractor shall prepare and submit training materials for 30%, 70%, 100% in accordance with the approved IMS. Delivery of training material submissions shall be five (5) business days prior to associated training conferences. Government will provide comments at the conferences and will review with the contractor. The final submission of training materials is due ten (10) business days after the conduct of the training verification event.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU. In addition, to the distribution requirements identified in block 14 relative to review and approval of the training materials the contractor shall deliver one hard copy of the training and one electronic copy of the training per STS Wi-Fi for each fielding event conducted under the contract per the reference PWS sections in block 5.

The Contractor shall provide additional revisions as new/revised system baseline changes occur that impact the training.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
9
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

ILSS

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

B002
Government Property (GP) Inventory Report
Government Property (GP) Inventory Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MGMT-80441D
PWS 3.2
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13:

Contractor shall prepare and submit the Government Property (GP) Inventory sixty (60) calendar days after contract award. The contractor shall furnish a report, at the Government’s request thereafter.

BLOCK 14-15:

Submit an electronic copy of the inventory to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
10
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

MGMT

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

C001-101
Integrated Master Schedule (IMS)
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MGMT-81650
PWS 3.5.1.2
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 4: Reference paragraph B of DI-MGMT-81650. Earned Value Management (EVM) is not applicable to this contract effort.

BLOCK 10-13: First submittal shall be NLT ten (10) business days after contract award. The Contractor shall submit subsequent revisions monthly in conjunction with the monthly in-process working group meetings. The Contractor shall maintain and submit the IMS throughout the period of performance of the contract.

BLOCK 14-15:

Submit one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
11
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

MISC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

D001-101
Technical Report – Study/Services
Disposal Plan – STS SATCOM
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80508B
PWS 3.5.2.4
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall submit the draft report sixty (60) business days after contract award. The Government requires twenty (20) business days for review and comment of the report. Submit final report twenty (20) business days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
12
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

MISC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

D001-201
Technical Report – Study/Services
Disposal Plan – STS LOS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80508B
PWS 3.5.2.4
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall submit the draft report sixty (60) business days after contract award. The Government requires twenty (20) business days for review and comment of the report. Submit final report twenty (20) business days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ Lindsay Keel

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
13
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

MISC

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

D001-301
Technical Report – Study/Services
Disposal Plan – STS WIFI
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80508B
PWS 3.5.2.4
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS. Submittal in digital file format is acceptable.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: The Contractor shall submit the draft report sixty (60) business days after contract award. The Government requires twenty (20) business days for review and comment of the report. Submit final report twenty (20) business days after receipt of Government comments.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ LINDSAY KEEL

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
14
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

SESS

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

E001-101
Logistics Product Data Summaries
System Support Package Component Listing – STS SATCOM
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-SESS-81759A
PWS 1.1
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use. Other requests for this document shall be referred to Commander, U.S. Army Communications-Electronics Command, ATTN: AMSEL-LCL-ECM, 6001 Combat Drive, Aberdeen Proving Ground, MD 21005-1846.

BLOCK 10-13: Delivery of initial SSPCL shall be five (5) business days after draft MAC approval, (Reference CDRL H004). Government requires twenty (20) business days to review and provide comments. Delivery of the final SSPCL shall be twenty (20) business days after final MAC approval. The Government will make acceptance determination twenty (20) business days after receipt of acceptable SSPCL. Subsequent submissions are required based on Government approved design changes. Submit DD250 when the Government provides acceptance notification.

BLOCK 14-15:

Submit one (1) draft and one (1) final to SFAE-CCC-TNU.

G. PREPARED BY

MAJ LINDSAY KEEL

APM, STS

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
15
of
65
Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0008
A
TDP

TM

OTHER

SESS

D. SYSTEM|ITEM
E. CONTRACT PR NO.
F. CONTRACTOR

STS

TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

E001-201
Logistics Product Data Summaries
System Support Package Component Listing – STS LOS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-SESS-81759A
PWS 1.1
SFAE-CCC-TNU
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

DD

SEE BLOCK 16
SEE BLOCK 16

b. COPIES

8. APP CODE
SEE BLOCK 16
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
15. Total
SEE BLOCK 16

PREPARATION INSTRUCTIONS: Prepare and deliver in contractor format with content described in the DID and PWS.

DISTRIBUTION STATEMENT C - Distribution authorized to U.S. Government agencies and their contractors for administrative or operational use.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .