STP-5503(609).pdf
PDF 339 KB Posted
- Attached to
- Spoede Road Bridge Replacement
- Solicitation number
- STP-5503(609)
- Issued by
- St. Louis County, Missouri
About this file
This is a project description and scope of work document for the Missouri Department of Transportation (MoDOT) for the Spoede Road Bridge Replacement project (STP-5503(609)). The project involves the removal and replacement of the Spoede Road Bridge over Deer Creek and encompasses clearing and grubbing, grading, excavation, bridge construction, asphalt pavement installation, pedestrian decorative fencing, guardrail installation, rock blanket placement, pavement markings, concrete sidewalk construction, seeding and mulching, erosion control measures, and associated miscellaneous work. The project is funded through the Surface Transportation Program (STP) and represents a comprehensive bridge replacement initiative requiring coordination of multiple construction disciplines and site restoration activities.
The project is structured as a state transportation improvement program (STIP) funded undertaking with MoDOT as the administering agency. The scope requires contractors to manage all aspects of bridge removal, new bridge construction, and site restoration in accordance with Missouri Department of Transportation standards and specifications. Contractors should expect standard MoDOT contract terms and conditions applicable to state-funded transportation projects, with pricing developed on a bid basis responsive to the detailed specifications and construction requirements outlined in the project documents.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .