Storm Debris Removal Zones.pdf
PDF 2 MB Posted
- Attached to
- Success Lake Storm Debris Removal
- Solicitation number
- W9123824Q0040
About this file
This document appears to be a PowerPoint presentation that provides details on the zoning and scope of a storm debris removal project for Success Lake. The presentation divides the project into 11 distinct cleanup zones along the shoreline, detailing the specific areas to be addressed within each zone.
The related federal contract opportunity is a solicitation (Solicitation Number W9123824Q0040) for the Success Lake Storm Debris Removal project, issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The solicitation includes key details such as the deadline for submitting questions (12 days prior to the quote due date of June 6, 2024 at 11:00 AM), and a site visit scheduled for May 30, 2024 at 9:00 AM. No additional details are provided about the pricing terms, set asides, incumbents, or other contractual information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Site Visit Sign-In Sheet.pdf | ||
| Questions.Answers.pdf | ||
| Solicitation W9123824Q0040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
All debris cleanup zones consist of the area from the current water level of lake all the way up to the high water mark.
Zone 1: Right Abutment to center of the Dam
Zone 2: Left abutment to center of the Dam
All debris cleanup zones consist of the area from the current water level of lake at the time of work
Zone 3: Left Abutment of Schafer Dam to Vista Point.
All debris cleanup zones consist of the area from the current water level of lake at the time of work all the way up to the high water mark.
Zone 4: Vista Point to the Highway 190 Bridge.
Zone 5: Shoreline of South Fork
All debris cleanup zones consist of the area from the current water level of lake at the time of work
Zone 7: West side of North Fork
Zone 6: East side of North Fork
All debris cleanup zones consist of the area from the current water level of lake at the time of work all the way up to the high water mark.
Zone 8: Gill Cove "Old Horn Cove"
All debris cleanup zones consist of the area from the current water level of lake at the time of work
Zone 9: Kincaid Cove "Common Thumb Cove"
All debris cleanup zones consist of the area from the current water level of lake at the time of work all the way up to the high water mark.
Zone 10: Rocky Hill Rock wall to Round about.
All debris cleanup zones consist of the area from the current water level of lake at the time of work all the way up to the high water mark.
Zone 11: Round about to right abutment of Schafer Dam.
All debris cleanup zones consist of the area from the current water level of lake at time of work all the way up to the high water mark.
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
File details come from the government source that posted it. Updated .