Storage Container SOW CGC Neah BAY RS.docx

DOCX document 22 KB Posted

Attached to
Conex Boxes in Cleveland OH
Solicitation number
2123403Y61A2397001
Issued by

View the file

Other files

File Type Posted
Solicitation - 2123403Y61A2397001.docx DOCX document
Smart Matrix Acquisition.GOV.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Storage Container SOW In accordance with PR

Overview: CG Neah Bay Base requires additional storage containers to house cutter crew items and materials. The contractor is required to provide (2) 20’ Storage Containers, all that are weather tight and lockable. Each container should have a unique identifiable number in the upper left/right or lower left/right corners. Address for delivery is 1055 East 9th Street, Cleveland, OH 44114

POC: Ship Superintendent Chip Weiland 443-909-0825

Line Items: 1) 20’ Storage Container (Conex Box), weather tight, lockable, (2) Total

The contractor shall provide all line items NLT than August 21th, 2023 unless otherwise instructed.

A) Contractor shall deliver line item/items to the CG Base Sturgeon Bay IAW DMR.

B) Contractor shall call POC to verify date, time and location of delivery. Yard may at its desertion change date of delivery.

C) Upon delivery, contractor/delivery person shall meet with POC or his or her alternate to ensure line items are delivered to proper location.

D) Contractor/delivery person shall have POC sign an invoice that references the PO and storage container serial numbers to acknowledge delivery.

E) POC shall call contractor when line items are no longer needed and ready to be picked up if prior to the end of period of performance.

F) Contractor shall pick up line items within 72 hours of pick up call.

G) Upon pick up, contractor/delivery person shall have POC sign an invoice that references the call order and storage container serial numbers to acknowledge pickup.

Period of Performance: 5/21/23 through 10/13023

All containers are required to be picked up NLT 10/13/23, unless instructed otherwise by the POC.

Staggered delivery is acceptable as long as all containers can be delivered by COB 5/21/23.

The contractor is responsible for picking up all containers after the Period of Performance has ended.

File details come from the government source that posted it. Updated .