Storage Container SOW In accordance with PR 2122402Y6172M92001
Overview: The CG Yard requires additional storage containers to house cutter crew items and material during CGC James Rankin’s maintenance availability. The contractor is required to provide (6) 20’ Storage Containers, all that are weather tight and lockable. Each container should have a unique identifiable number in the upper left/right or lower left/right corners.
POC: Ship Superintendent James Johnston 410-320-6058
Line Items: 1) 20’ Storage Container (Conex Box), weather tight, lockable, (6) Total
The contractor shall provide all line items to the CG Yard NLT than April 4th, 2022 unless otherwise instructed.
A) Contractor shall deliver line item/items to the Yard IAW DMR.
B) Contractor shall call POC to verify date, time and location of delivery. Yard may at its desertion change date of delivery.
C) Upon delivery, contractor/delivery person shall meet with POC or his or her alternate to ensure line items are delivered to proper location.
D) Contractor/delivery person shall have POC sign an invoice that references the PO and storage container serial numbers to acknowledge delivery.
E) POC shall call contractor when line items are no longer needed and ready to be picked up if prior to the end of period of performance.
F) Contractor shall pick up line items within 72 hours of pick up call.
G) Upon pick up, contractor/delivery person shall have POC sign an invoice that references the call order and storage container serial numbers to acknowledge pickup.
Period of Performance: 4/4/22-7/30/22
All containers are required to be delivered NLT 4/4/22, unless instructed otherwise by the POC.
Staggered delivery is acceptable as long as all containers can be delivered by COB 4/4/22.
The contractor is responsible for picking up all containers after the Period of Performance has ended. The contractor will only receive a call to pick up containers if needed to pick up before Period of Performance has ended.