This statement of work outlines requirements for a storage container rental contract to support maintenance of the US Coast Guard Cutter Hollyhock. The contractor must provide fourteen 20-foot storage containers delivered no later than July 28, 2023 to the Coast Guard Yard to house crew items and materials during maintenance availability. The containers must be weather tight, lockable, and uniquely identified. The performance period is from July 28, 2023 through September 28, 2024. The contractor is responsible for picking up containers if no longer needed before the end of the period of performance or after the period expires. The related federal contract opportunity is solicitation number 2123403Y61A2698-1001 for rental of contex boxes to support the USCGC Hollyhock through the Department of Homeland Security Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Smart Matrix Acquisition.GOV.pdf | ||
| Solicitation - 2123403Y61A2698-1001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Storage Container SOW In accordance with PR 2123403Y61A2698-1001
Overview: The CG Yard requires additional storage containers to house cutter crew items and material during CGC Hollyhock MMA maintenance availability. The contractor is required to provide (14) 20’ Storage Containers, all that are weather tight and lockable. Each container should have a unique identifiable number in the upper left/right or lower left/right corners.
POC: Ship Superintendent CWO John Whalen 410-636-3745
Line Items: 1) 20’ Storage Container (Conex Box), weather tight, lockable, (14) Total
The contractor shall provide all line items to the CG Yard NLT than July 28 2023 unless otherwise instructed.
A) Contractor shall deliver line item/items to the Yard IAW DMR.
B) Contractor shall call POC to verify date, time and location of delivery. Yard may at its desertion change date of delivery.
C) Upon delivery, contractor/delivery person shall meet with POC or his or her alternate to ensure line items are delivered to proper location.
D) Contractor/delivery person shall have POC sign an invoice that references the PO and storage container serial numbers to acknowledge delivery.
E) POC shall call contractor when line items are no longer needed and ready to be picked up if prior to the end of period of performance.
F) Contractor shall pick up line items within 72 hours of pick up call.
G) Upon pick up, contractor/delivery person shall have POC sign an invoice that references the call order and storage container serial numbers to acknowledge pickup.
Period of Performance: 7/28/23 – 9/28/24
All containers are required to be delivered NLT 7/28/23, unless instructed otherwise by the POC.
Staggered delivery is acceptable as long as all containers can be delivered by COB 7/28/23.
The contractor is responsible for picking up all containers after the Period of Performance has ended. The contractor will only receive a call to pick up containers if needed to pick up before Period of Performance has ended.