This is a Request for Qualifications (RFQ) issued by the Town of Sterling, Connecticut for engineering and construction oversight services related to a Drinking Water infrastructure project. The Town of Sterling seeks qualified firms to provide design and construction oversight for a new oxidation and filtration treatment system to remove iron and manganese from groundwater sources at the existing well site located at 304 Sterling Road. The project serves approximately 350 residents and the Sterling Community School. The scope of work encompasses design phase activities including initial workshops with the Board of Selectmen, survey work, collaborative design reviews, and detailed engineering design; administrative support including 2CFR Part 200 compliance assistance, permitting support, and funding applications; and construction support including preconstruction conferences, full-time field inspections, commissioning and operator training coordination, and regular construction meetings. Key deliverables include preliminary design reports, 60% and 90% design submittals, final design drawings and specifications, Opinion of Probable Construction Costs, bid documents, permitting assistance, and an Operations and Maintenance manual. The revised project schedule indicates field investigation from October 2026 through January 2027, design from December 2026 through June 2027, construction bids from July 2027 through September 2027, and construction from October 2027 through October 2028. The RFQ was released on September 1, 2026, with a deadline for questions on September 10, 2026, and a submission deadline of September 18, 2026, with selection and notification on September 25, 2026.

Evaluation criteria include experience with DWSRF-funded projects, experience with similar treatment projects, understanding of project scope and approach, technical expertise and qualifications, capacity and key personnel, avoidance of conflicts of interest, and schedule adherence and cost competitiveness. The project will be funded through the Connecticut Drinking Water Emerging Contaminants in Small or Disadvantaged Communities (EC SDC) program and/or the State of Connecticut Drinking Water State Revolving Fund (DW SRF), and any awarded contract will be subject to requirements of Subsections (h), (i), and (o) of Section 22a-482-4 of the RCSA. Bidders unable to meet the desired timeline are encouraged to contact Judy Stumpo at 860-373-6428 to discuss alternative timelines that ensure completion of all project milestones and substantial construction completion. The State of Connecticut will not be a party to this request or any resulting contract.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sterling_CT_Revised Filtration_Scope of Work 09-01-2026 Final

Town of Sterling Water Treatment Project - Revised

-- REQUEST FOR QUALIFICATIONS --

Contact Information: Judith Stumpo, jstumpo@sterlingct.us

Jack Joslyn, jjoslyn@sterlingct.gov

Town of Sterling 1183 Plainfield Pike P.O. Box 157 Oneco, CT 06373

Scope of Work

1. Project Overview

The Town of Sterling, Connecticut, is looking for qualified engineering and construction oversight firms to provide services for a Drinking Water infrastructure project. This project will be funded through the Connecticut Drinking Water Emerging Contaminants in Small or

Disadvantaged Communities (EC SDC) and/or the State of Connecticut Drinking Water State

Revolving Fund (DW SRF). The objective is to identify qualified firms for design and construction oversight for a new oxidation and filtration treatment system to remove iron and manganese from groundwater sources at the existing well site (304 Sterling Road).

Any contract awarded under this request for proposal is expected to be funded through EC-

SDC and DW SRF and will be subject to requirements of Subsections (h), (i) and (o) of

Section 22a-482-4 of the RCSA. The State of Connecticut will not be a party to this request or any resulting contract.

A Preliminary Engineering Report (PER) stamped September 2025 addresses issues with discolored water, due to elevated iron and manganese levels. A 100gpm oxidation & filtration treatment system was identified as the best alternative weighing in several factors. The population served by the Sterling Water System is approximately 350 residents and the Sterling Community School. Incorporated within the PER is a Proposed Project

Schedule, however, due to delays, please see the separate Revised Proposed Project

Schedule.

mailto:jstumpo@sterlingct.us mailto:jjoslyn@sterlingct.gov

2. Scope of Work This scope of work provides some details for firms to identify qualifications. This does not give all detail that will be part of the contracting process:

Design Phase:

• Meet with Sterling Board of Selectmen in an initial workshop meeting.

• Conduct Survey work to prepare base maps for the project.

• Collaborate with Sterling Board of Selectmen on review and revisions to the design.

• Detailed engineering design for oxidation and filtration system

Administrative:

• Examples of prior experience assisting small or disadvantaged systems with 2CFR Part

200 compliance

• Permitting support (CT DPH Public Water System Construction Permit, NDDB review, chemical feed system application)

• Assist with applying for additional funding, if necessary

• Bid phase assistance, construction administration, and construction observation services

Construction and Support:

• Hold a Preconstruction Conference

• Satisfy all requirements of federal and state funding agencies.

• Process change orders and contract documents as required.

• Full time field inspections during all construction activities

• Assistance with and coordination of, commissioning, startup, and operator training.

• Hold regular construction meetings with the Selectmen, WPCA and Contractor.

3. Deliverables – desired timeline included revised from PER

• All applicable certifications and deliverables for DWSRF cross-cutter requirements.

• Preliminary design report

• 60% and 90% design submittals

• Final design drawings and specifications

• Opinion of Probable Construction Costs

• Bid documents

• Permitting assistance, including development of the technical portions of permit applications and coordinating with permitting agencies to resolve comments.

• O&M manual

4. Evaluation Criteria

• Sterling will utilize an evaluation structure to assess proposals by balancing cost, technical/managerial capacity and experiential factors.

o Experience with DWSRF-funded projects

• Experience with similar treatment projects

• Understanding of project scope and approach

• Technical expertise and qualifications

• Capacity, project team and key personnel

• Avoidance of personal and organizational conflicts of interest

• Schedule adherence and cost competitiveness – see revised schedule

5. Schedule – Revised * Design: December 2026 – June 2027

Field investigation: October 2026 – January 2027

Construction bids: July 2027 - September 2027

Construction: October 2027- October 2028

*If you are interested in providing qualifications, but can’t meet the desired timeline, please provide an alternative timeline that ensure completion of all milestones and substantial construction completion. Please contact Judy Stumpo, 860-373-6428 to discuss potential options.

RFQ Release Date: July 23, 2026

Revised RFQ Release Date: September 1, 2026

Deadline for Questions: September 10, 2026

Submission Deadline: September 18, 2026

Selection and Notification: September 25, 2026