Stehekin_NOCA 10(7)_emergency reroutes_controlsheet.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
WA NPS NOCA 10(7) Stehekin Valley Road Emergency Reroute
Solicitation number
69056721B000021
Issued by

About this file

This document contains a survey control point list and related federal contract opportunity. The survey control point list provides state plane and geo coordinates, elevations, descriptions and other data for 29 survey control points along the Stehekin Valley Road in Washington state. It will be used as part of an emergency rerouting project by the National Park Service North Cascades Office under solicitation number 69056721B000021. The federal contract opportunity seeks emergency rerouting services along the Stehekin Valley Road, to be awarded by the Department of Transportation Federal Highway Administration. Key details include the project location, required survey and design work, and involvement of the National Park Service and Federal Highway Administration in managing the contract.

View the file

Other files

File Type Posted
BidSum-WA NPS NOCA 10(7).pdf PDF
BidOpen Sign-in WA NPS NOCA 10(7).pdf PDF
A001.pdf PDF
WA NPS NOCA 10(7)_SB.pdf PDF
noca01007_CulvertXS.pdf PDF
noca01007_ML_Staking_XYZCoor.pdf PDF
noca01007_DW_EW_VOL.pdf PDF
GR 12-21 WA NPS NOCA 10(7) FINAL Geotech Recommendations Report.pdf PDF
noca01007_Plan.pdf PDF
noca01007_ML_VT_ALI.pdf PDF
noca01007_DW_HZ_ALI.pdf PDF
noca01007_ML_EW_VOL.pdf PDF
noca01007_DW_VT_ALI.pdf PDF
Zipped xml files.zip ZIP file
noca01007_XS.pdf PDF
noca01007_DWCC_EW_VOL.pdf PDF
FLH Bridge oversized_overweight permit load request form.pdf PDF
noca01007_ML_SUP.pdf PDF
WA NPS NOCA 10(7)_SB.pdf PDF
noca01007_ML_HZ_ALI.pdf PDF
Final Signed SWPPP.pdf PDF
noca01007_ClearingLimits.pdf PDF
noca01007_DW_Staking_XYZCoor.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information

Information
1.This file transfers the Survey Control point list (in Excel format) to an Excel plan sheet. Open the point list files in Excel. Select the tab at the bottom of the worksheet and drag it to this spreadsheet. It will become a new tab. Place the name of this tab in the "Data Location" block below. The Survey Control point list will appear.
2.If extra sheets are needed, copy the original plan sheet by holding the left mouse button on the worksheet's tab (below) and hold the <CTRL>key. A mini sheet with a plus sign should appear. Drag this and drop it to the desired location.
Common Sheet Information
Insert the following values. They will appear on every sheet.
State:WANote: If there is more than one project number, use <ALT><ENTER> to insert page break for additional lines.
Project:NPS NOCA 10(7)
NPS PMIS /

Drawing No:

Designed by:WFLHD Survey
Date:1/1904
Checked by:WFLHD Survey
Date:1/1904
First sheet #:D.101.0
Title block text:SURVEY CONTROL
Show Totals?TRUE
Data location:Page 1Worksheet found
Data begins in col:A
Min. rows/table53.0
Base sheet name:Sheet15rows w/dataOK - no spaces in data
Max. row/table4015data rowsWarnings:
40rows/table
PROJECT : Stehekin Valley Road Emergency Reroute

DATE OF FIELD WORK : 10/2020

DATE OF FINAL ADJUSTMENT : ???

PROJECT UNITS : US Survey foot COORDINATE SYSTEM : Washington North SPCS NAD83

EPOCH DATE : 91

VERTICAL DATUM : NAVD88

GPK FILE DATED JAN 24, 2007

Sheet Names
Input the names of the worksheets in the order you would like the sheets numbered.
Worksheet NameSheetHeader rowSheet NumberNotes
SheetD.10310OK
Sheet (2)UndefinedFALSE10
Sheet (3)UndefinedFALSE10
Sheet (4)UndefinedFALSE10
Sheet (5)UndefinedFALSE10
Sheet (6)UndefinedFALSE10
Sheet (7)UndefinedFALSE10
Sheet (8)UndefinedFALSE10
Sheet (9)UndefinedFALSE10
Sheet (10)UndefinedFALSE10
Sheet (11)UndefinedFALSE10
Sheet (12)UndefinedFALSE10
Sheet (13)UndefinedFALSE10
Sheet (14)UndefinedFALSE10
Sheet (15)UndefinedFALSE10
Sheet (16)UndefinedFALSE10
Sheet (17)UndefinedFALSE10
Sheet (18)UndefinedFALSE10
Sheet (19)UndefinedFALSE10
Sheet (20)UndefinedFALSE10
Total Sheets:10sheets missing

Revised: 15 June 2015

Sheet

Sheet Information
Sheet num:D.10Filename0
Sheet name:Sheetc:\pw-work\dms08896\[Stehekin_NOCA 10(7)_emergency reroutes_controlsheet.xlsx]Sheet
Reference:Time
17-Dec-2020 8:31 AM
Begin Column:ABCDEFGHI

PROJECT : Stehekin Valley Road Emergency Reroute

DATE OF FIELD WORK : 10/2020

DATE OF FINAL ADJUSTMENT : ??? PROJECT UNITS : US Survey foot COORDINATE SYSTEM : Washington North SPCS NAD83

EPOCH DATE : 91

VERTICAL DATUM : NAVD88

GPK FILE DATED JAN 24, 2007

STATE PLANE COORDINATESGEO COORDINATES
3.0POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTIONNOTE:
20101495651.4781665957.5091249.04348°21'31.468221"N120°43'41.802597"WN/A0.99989141395/8" IR W/FHWA ALUM CAP1.To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
20102495914.2031665717.7111253.97248°21'34.064101"N120°43'45.348154"WN/A0.99989123155/8" IR W/FHWA ALUM CAP
20103496070.9461665549.1201246.22548°21'35.613139"N120°43'47.841488"WN/A0.99989163315/8" IR W/FHWA ALUM CAP
20104496160.4081665536.6821251.45248°21'36.496147"N120°43'48.023890"WN/A0.99989140165/8" rebar no cap
20105496230.0461665396.7071255.39948°21'37.185209"N120°43'50.095254"WN/A0.99989122725/8" rebar no cap
20106496222.0461665278.5511251.69148°21'37.107816"N120°43'51.845065"WN/A0.99989140275/8" rebar no cap
20107496319.1531665207.5671264.49048°21'38.067031"N120°43'52.894290"WN/A0.9998908115/8" rebar no cap
20108496418.1901665051.4671275.74748°21'39.046399"N120°43'55.203898"WN/A0.99989029355/8" rebar no cap
20109496492.4371664878.7971278.90248°21'39.781330"N120°43'57.759383"WN/A0.99989015795/8" rebar no cap
20110496418.4331664727.7111276.26148°21'39.052976"N120°43'59.998119"WN/A0.99989026915/8" rebar no cap
20111496413.3991664610.1491272.73548°21'39.004802"N120°44'01.739091"WN/A0.99989043655/8" rebar no cap
23123496419.7971664443.4881263.47748°21'39.070060"N120°44'04.206909"WN/A0.999890881/2" IR W/YPC
23124496905.7521663765.3011277.42848°21'43.874109"N120°44'14.240621"WN/A0.99989031271/2" IR W/YPC
29101497180.5991663753.9011298.67048°21'46.586536"N120°44'14.404361"WN/A0.99988935425/8" IR W/ ALUMINUM CAP
29102497368.9671663671.0251308.55248°21'48.446436"N120°44'15.628184"WN/A0.99988892085/8" IR W/ ALUMINUM CAP
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000

PROJECT : Stehekin Valley Road Emergency Reroute

DATE OF FIELD WORK : 10/2020

DATE OF FINAL ADJUSTMENT : ???

PROJECT UNITS : US Survey foot COORDINATE SYSTEM : Washington North SPCS NAD83

EPOCH DATE : 91

VERTICAL DATUM : NAVD88

GPK FILE DATED JAN 24, 2007

STATE PLANE COORDINATESGEO COORDINATES
POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTION
20101495651.4781665957.5091249.04348°21'31.468221"N120°43'41.802597"WN/A0.999891415/8" IR W/FHWA ALUM CAP
20102495914.2031665717.7111253.97248°21'34.064101"N120°43'45.348154"WN/A0.999891235/8" IR W/FHWA ALUM CAP
20103496070.9461665549.1201246.22548°21'35.613139"N120°43'47.841488"WN/A0.999891635/8" IR W/FHWA ALUM CAP
20104496160.4081665536.6821251.45248°21'36.496147"N120°43'48.023890"WN/A0.999891405/8" rebar no cap
20105496230.0461665396.7071255.39948°21'37.185209"N120°43'50.095254"WN/A0.999891235/8" rebar no cap
20106496222.0461665278.5511251.69148°21'37.107816"N120°43'51.845065"WN/A0.999891405/8" rebar no cap
20107496319.1531665207.5671264.49048°21'38.067031"N120°43'52.894290"WN/A0.999890815/8" rebar no cap
20108496418.1901665051.4671275.74748°21'39.046399"N120°43'55.203898"WN/A0.999890295/8" rebar no cap
20109496492.4371664878.7971278.90248°21'39.781330"N120°43'57.759383"WN/A0.999890165/8" rebar no cap
20110496418.4331664727.7111276.26148°21'39.052976"N120°43'59.998119"WN/A0.999890275/8" rebar no cap
20111496413.3991664610.1491272.73548°21'39.004802"N120°44'01.739091"WN/A0.999890445/8" rebar no cap
23123496419.7971664443.4881263.47748°21'39.070060"N120°44'04.206909"WN/A0.999890881/2" IR W/YPC
23124496905.7521663765.3011277.42848°21'43.874109"N120°44'14.240621"WN/A0.999890311/2" IR W/YPC
29101497180.5991663753.9011298.67048°21'46.586536"N120°44'14.404361"WN/A0.999889355/8" IR W/ ALUMINUM CAP
29102497368.9671663671.0251308.55248°21'48.446436"N120°44'15.628184"WN/A0.999888925/8" IR W/ ALUMINUM CAP

File details come from the government source that posted it. Updated .