This document outlines specifications for a steam and condensate piping system project at the Federal Correctional Institution in Waseca, Minnesota. The awarded contractor must fabricate and deliver 497 linear feet of 6-inch schedule 40 carbon steel steam carrier pipe with 250 degree F service temperature and 15 PSIG pressure, along with related fittings and 497 feet of pre-insulated piping enclosed in 10-gauge galvanized steel conduit. The contractor must also furnish 463 linear feet of 2-inch schedule 80 carbon steel condensate pipe with matching temperature and pressure requirements, enclosed in 4.5-inch HDPE insulation. Required accessories include elbows, end seals, anchors and field joint kits. The project opportunity is identified in solicitation number 15B41523Q00000011 issued by the Department of Justice Bureau of Prisons for the FCI Waseca Steam Project. The contractor must deliver all equipment and meet specifications within 75 days of award.

View the file

Other files for this federal contract opportunity

Other files attached to FCI Waseca Steam Project, newest first.
File Type Posted
15B41523Q00000011 Steam Project RFQ.pdf PDF
15B41523Q00000011 Steam Project Cover Page.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Steam Delivery and Condensate System Requirements:

Awarded contractor shall obtain and deliver the following to the Institution Warehouse within

75 days of contract award. The equipment must also meet or exceed the following additional characteristics:

All service piping shall be designed and manufactured in accordance with ASME B31.1

Stress analysis of piping system to be completed by dimensions and design conditions provided. Contractor must provide proof the system will perform within limits set forth for allowable stresses in code, based on conditions provided.

Contractor must design system to accommodate for service pipe thermal expansion.

Steam piping to be fabricated to job dimensions.

Condensate piping to be shipped in single and double random lengths.

All fittings to be prefabricated with tangents.

PRE‐INSULATED PIPE shall be used where specified for steam, high temperature hot water, and condensate service. All straight sections, fittings, anchors, terminal caps, field kits, and other accessories shall be factory prefabricated to job dimensions and designed to allow for thermal expansion and minimize the number of field welds. The pipe sections shall be joined by welding. The system shall be in strict conformance with ANSI B 31.1

STEEL CARRIER PIPE shall be black steel per ASTM A53, Grade B (welded)(seamless) or ASTM A‐106

(seamless, Schedule 40 (standard weight) or Schedule 80 (extra heavy weight).

INSULATION wrapping the steam carrier pipe shall be a high‐performance silica aerogel insulation blanket with a thickness between 0.2in (5mm) and 0.4in (10mm) and rated for temperatures to

1200℉ conforming to ASTM C‐447. A polyurethane foam insulation shall be used for the condensate pipe and shall be a Closed Cell material, satisfactory for temperatures to 900℉ and conforming to

ASTM C‐522 and shall fully extend to and be encased in a 4” High Density Polyethylene jacket.

EXPANSION may be accommodated by means of prefabricated and pre‐insulated ASTM A‐36 oversize elbows to accommodate lateral movement of the piping. No area or part of the piping shall be uninsulated due to pipe growth. The space provided for lateral movement shall be 1.5 times greater than the indicated piping movement. Support guides shall be installed where required to facilitate proper movement of the carrier pipe. The length of the oversized conduit shall not be less than that required to produce carrier pipe flexibility within the stress limits indicated by the ANSI

B31.1 Code Pressure Piping. Carrier pipe shall be accurately centered inside the conduit at the factory and held in place with stays. Installer shall not remove stays before conduit is placed in its final location, backfill material is placed on both sides of the oval conduit, and carrier pipe joints are made in conduit sections.

WALL PENETRATION SLEEVES: Provide wall penetration sleeves where piping passes through masonry or concrete walls. Sleeves in outside walls below grade shall be Schedule 40 of standard weight black steel pipe or shall be as specified by the design Engineer. Space between piping or insulation casing, and the sleeve shall be sufficient to allow proper watertight sealing, but never less than a ½” Sleeves shall be sufficient in length to pass through entire thickness of walls or slabs.

FIELD JOINTS shall be made with a FRP sleeve, insulation half shells, and FRP wrap kits. The circumferential joint between the FRP sleeve and the outer FRP jacket shall be covered with layers of pre‐cut fiberglass reinforced polyester resin jacket. The FRP wrap material shall extend over the adjacent casing to form a homogenous airtight closure. The joint shall be air tested at 5 psi for a period of 2 hours after the cure is complete utilizing the factory installed air tube running through the entire system. Backfilling shall not be started until the joint has passed the air test. The complete joint shall be installed in accordance with the manufacturer’s requirements.

ACCESSORIES: The system manufacturer shall provide all required accessories to make the system watertight. This shall include all end terminations, end seals, and gland seals.

STEAM

1. 497 linear feet of 6” Schedule 40 ASTM A53, GR B, ERW carbon steel steam carrier service pipe.

Service Pressure: 15 PSIG Temperature: 250℉

2. Service pipe fittings shall be ASME B16.9 ASTM A234 WPB

3. No less than .394” (10mm) of silica aerogel high temperature insulation blanket reinforced with non‐woven glass fiber batting.

4. 500 linear feet of 10.75” 10‐gauge ASTM A139 spiral welded/A135 ERW Hot Dipped Galvanized steel conduit Exterior Coating: 150mil fiberglass reinforced polymer (FPR) over galvanized Interior Coating: Galvanized

5. 2 prefabricated ASTM A36 oversize elbows (45°) with 15’ tangents

6. 2 prefabricated ASTM A36 end seals.

7. 3 prefabricated ASTM A36 carbon steel anchors with field joint kits

8. Supports shall be all galvanized steel.

CONDENSATE

1. 463 linear feet of 2” Schedule 80 A53, GR B, ERW carbon steel condensate pipe straights

Service Pressure: 15 PSIG Temperature: 250℉

2. Service pipe fittings shall be ASME B16.11 ASTM A105

3. Polyurethan foam insulation surrounding condensate pipe shall have a minimum of 2.0lb/cu ft density with a minimum .92” thickness.

4. High Density Polyethylene (HDPE) Insulation jacket shall have an outer diameter of 4.5” with no less than .138” thickness of ASTM D3350, grade PE345444C or grade PE4710 high density polyethylene.

5. 2 prefabricated ASTM A36 2” elbows (45°) with 34’ tangents

6. 2 prefabricated wall/floor ASTM A36 end seals.

7. 3 prefabricated ASTM A36 anchors with field joint kits (total number required determined by manufacturer)

8. All components and materials to complete Low Pressure Duplex Condensate Return System