Station Ft. Pierce SOW.docx.pdf
PDF 243 KB Posted
- Solicitation number
- 70Z028-23-Q-0000001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Station Fort Pierce Lawn Maintenance Synopsis.docx.pdf | ||
| station map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
USCG Station Fort Pierce
900 Seaway Dr
Fort Pierce, FL, 34949
STATEMENT OF WORK FOR
Lawn Maintenance
AT
STATION FORT PIERCE
FORT PIERCE, FL
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01100 - GENERAL PARAGRAPHS
PART 1 GENERAL
1.01 INTENT: Provide lawn care maintenance for US Coast Guard Station Fort Pierce to begin on 1 NOVEMBER 2022 through 30 SEPTEMBER 2023.
1.02 OBJECTIVE: The Government’s objective maintain grounds around the station to include all within perimeter fence and up to sidewalk beyond fence.
1.03 SCOPE OF WORK: Contractor shall furnish all labor, tools, materials, transportation, equipment, supervision and personnel. Company shall complete weekly lawn care maintenance to include the following: grass cut, string trim, edging, and lawn debris removal edging will take place on hedges between parking lot and building. Attached are photos of the property line as stated above. No mulch or weed killing will be needed.
1.04 Contractor shall provide personnel who have the knowledge, qualifications and experience to perform the functions outlined in the Statement of Work.
1.05 CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facilities normal operations. Notify Station Engineering Petty
Officer 24 hours in advance of any shutdowns. Primary point of contact will be DC1
Dakota Sheppard (Dakota.J.Sheppard@uscg.mil), phone # (228) 731-1866. Perform all on-site work between the hours of 7:30 AM and 1430 PM, Monday through Friday
(Federal Holidays excluded), unless otherwise approved by the Contracting Officer or
Contracting officer’s Representative.
1.06 PERFORMANCE REQUIREMENTS: Contractor shall identify areas of need and leave station presentable to the public.
1.07 PERFORMANCE STANDARDS. Proper adherence to all safety procedures is required prior, during and after work being performed. The contractor shall furnish all personal protective equipment (PPE) as required.
The contractor shall safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities, and avoid interruptions of Government operations in the performance of services.
mailto:Dakota.J.Sheppard@uscg.mil
1.08 LIABILITY OF DAMAGES. The contractor shall be liable for all damages to
Government equipment and property when such damage is due to fault or negligence of the contractor. The contractor shall be responsible for all damages or injury to persons that occur as a result of the contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect the work the workers, the public, and the property of others.
END OF SECTION
station map.pdf
File details come from the government source that posted it. Updated .