Station Fort Pierce Roof SOW (2) (Autosaved).docx
DOCX document 28 KB Posted
- Attached to
- Roof repair Coast Guard Station Fort Pierce, FL.
- Solicitation number
- 70Z02822QMIAM0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 52.212-1.docx | DOCX document | |
| Construction Clauses.docx | DOCX document | |
| SAM.gov Wage Determination.pdf | ||
| 52.212-3.docx | DOCX document | |
| 52.212-5.docx | DOCX document | |
| 52.212-4.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
USCG Station Fort Pierce 900 Seaway Dr Fort Pierce, FL, 34949
STATEMENT OF WORK FOR THE
MULTIPURPORSE ROOF REPAIR
AT
STATION FORT PIERCE
FORT PIERCE, FL
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01100 - GENERAL PARAGRAPHS
PART 1 GENERAL
1.01 INTENT: Identify and repair all air and water intrusion in the multipurpose building roof at US Coast Guard Station Fort Pierce.
1.02 OBJECTIVE: The Government’s objective is identify and eliminate all water and air gaps on the multipurpose building roof repaired.
1.03 SCOPE OF WORK: Contractor shall furnish all labor, tools, materials, transportation, equipment, supervision and personnel. Company shall remove all existing coping and replace with a coping cap or equivalent to eliminate water intrusion. Company shall remove all surface mounted coping and caulking as needed and replace to ensure watertight seal. Company shall remove all conduit, install coping, and reattach with adhesive or mounting brackets. No repairs outside of the scope of work criteria are authorized.
1.04 Contractor shall provide personnel who have the knowledge, qualifications and experience to perform the functions outlined in the Statement of Work.
1.05 CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facilities normal operations. Notify Station Engineering Petty Officer 24 hours in advance of any shutdowns. Perform all on-site work between the hours of 7:30 AM and 3:00 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved by the Contracting Officer or Contracting officer’s Representative.
1.06 PERFORMANCE REQUIREMENTS: Contractor shall identify all air and water leaks. Company shall replace existing coping with membrane or aluminum cap and secure conduit to new coping or where feasible.
1.07 PERFORMANCE STANDARDS. Proper adherence to all safety procedures is required prior, during and after work being performed. The contractor shall furnish all personal protective equipment (PPE) as required.
The contractor shall safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities, and avoid interruptions of Government operations in the performance of services.
1.08 LIABILITY OF DAMAGES. The contractor shall be liable for all damages to Government equipment and property when such damage is due to fault or negligence of the contractor. The contractor shall be responsible for all damages or injury to persons that occur as a result of the contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect the work the workers, the public, and the property of others.
END OF SECTION