Chiller Replacement

Statement of Work (SOW) Project: Repair by replacing York Chiller

GENERAL INFORMATION

1.0 Scope of Work: Remove refrigerant and replace York chiller with a new chiller (Specs below), Leak check and charge to name plate on new Chiller.

2.0 Background: During a service call on the chiller, it was discovered that the multiple items on the York Chiller needed replacing as it is only running at half its capacity. The current chiller is costing us between $10,000 and $20,000 a year to keep running. With the upcoming hot weather, the chiller needs to be replaced or it will fail again. We currently have both a York and Trane Chiller on site that care of different sections of the building. Then new chiller will only replace the functions of the existing York Chiller.

CONTRACTOR REQUIREMENTS

3.0 Technical Requirements/Tasks:

a) Chiller

1) Remove Refrigerant from existing Chiller

2) Replace entire unit with a new chiller.

3) Replace Refrigerant to manufacturer recommended pressure.

4) Leak check circuit and charge to the name plate.

5) Remove old system from the NSL property

6) New system must be compatible with Siemens control systems for the building

b) Replacement Chiller Requirements:

Air-Cooled Scroll Chiller or equivalent 160 Nominal Tons Scroll With Variable Volume Ratio 460V/60Hz/3Phase Standard Noise UL listed to US & Canadian safety std Refrigerant Charge R-410A AHRI Certified ASHRAE 90.1/CSA Compliant (Max Qty 2) Circuit Breaker Standard Cooling (Above 40 Deg F) Brazed Plate Heat Exchanger Water Grooved Pipe Connection Flow Switch Set Point 60 Evaporator Only Insulation High Humidity Low Evap Temperature 1.25 Inch Wide Ambient Standard Aluminum Micro Channel EC Condenser Fan Motors Across-The-Line-Starter Single Point Unit Power Connection Terminal Block, no circuit breaker or disconnect Default Short Circuit Rating Convenience Outlet and Under/Overage Voltage protection BACnet Interface (MS/TP) Hard wired bundle - all Architectural Louvered Panels Elastomeric Isolators Shipped With Tarp Covering Full Unit We would like to have Year 1-5 parts and labor warranty on the whole unit

4.0 Government Furnished: No GFE provided. Access to building 1 may be required. On site Maintenance Employees will provide access when needed.

5.0 Deliverables / Schedule: No written deliverables

6.0 Travel: Contractor responsible for own travel and transport of equipment needed to perform the repair.

7.0 Contractor’s Key Personnel: Training in Trane’s Exclusive Service Procedure and technical expertise of an HVAC Equipment

8.0 Security Requirements: N/A

9.0 Data Rights: N/A

10.0 Section 508 – Electronic and Information Technology Standards: N/A

Attachment: None at this time.