Statement of Work (WG-300-2J ED-302-2J TPG Bridge 2023 w App A).pdf
PDF 2 MB Posted
- Attached to
- IDIQ Bridge Repair
- Solicitation number
- W9124M23S0001
About this file
This statement of work outlines requirements for an indefinite delivery/indefinite quantity contract to maintain and repair bridges on Fort Stewart and Hunter Army Airfield in Georgia. Key work includes demolishing existing bridges as needed, constructing new timber bridges or repairing components, installing storm piping, and performing miscellaneous repairs. The contract will be awarded by the Department of the Army Materiel Command Mission and Installation Contracting Command. Work must comply with environmental, cultural resource, and stormwater requirements and utilize best practices for erosion control, borrow pits, pest management, and other areas. Treated wood products must meet standards for preservative retention levels and branding. Concrete work must follow specifications for mix design, placement, finishing, and curing.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL PROVISIONS
GENERAL
Maintain and Repair Bridges (IDIQ)
IJO Nos. WG-300-2J/ED-302-2J
FS-4217/H-2127
1. DESCRIPTION OF WORK:
1.1 Work to be Done: The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with Maintain and Repair Bridges (IDIQ) complete in strict accordance with specifications and drawings. The work includes, but is not necessarily restricted to, the following items.
1.1.1 SCOPE OF WORK:
The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with Constructing and Miscellaneous Repairs to Timber and Concrete Bridges, Ft Stewart and Hunter AAF and shall be complete in strict accordance with specifications and drawings. The work includes, but is not necessarily restricted to, the following items.
1.1.2 After receipt of contract award and upon notification by the Contracting
Officer, the Contractor shall meet Government personnel for the purpose of verifying existing site conditions of each bridge. The contractor and Government will visit each bridge for the purpose of scoping the work to be done. Performance time will be cited on each delivery order in accordance with contract provision entitled, “Delivery Order Performance Time”.
1.1.3 Contractor shall demolish as issued by the delivery order existing bridge(s) which may include bulkheads, wingwalls, stringers, piles, caps, decking, and miscellaneous items.
1.1.4 Contractor shall remove all debris and demolished material to the appropriate sites. No landfills are available to use on Ft. Stewart or Hunter AAF.
1.1.5 Contractor shall construct new timber bridges or repair by component replacement as issued by the delivery order to include bulkheads, wingwalls, stringers, decking, piles, caps, signs, miscellaneous bolts and fasteners, etc., as directed in the scope of work to the details shown on the drawings and as described in the specifications. The work also includes clearing brush, excavation, backfilling, compacting, and grading as required in each individual delivery order.
1.1.6 Contractor shall install storm piping in location directed. This work includes excavation, backfilling, compacting, and grading as necessary as required in each individual delivery order.
1.2 Additives
N / A
1.3 Government Furnished – Government Installed (GF-GI) Furniture and
Equipment:
N / A
1.4 Government Furnished – Contractor Installed (GF-CI) Furniture and
Equipment:
N / A
1.5 Contractor Furnished – Contractor Installed (CF-CI) Furniture and
Equipment:
N / A
1.6 WORK BY OTHERS: The Contractor shall afford the Government and separate contractors reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall connect and coordinate his work with theirs as required by the Contract Documents.
1.7 DRAWINGS AND SITE VISITS
1.7.1 The drawings provide details for the maintenance and repair of bridges on
Fort Stewart and Hunter Army Airfield. It is strongly recommended that the Contractor visit the site to determine the complexity of the work and the amount of material required to perform this project. Field measurements may be necessary to determine the size and quantity of materials. Conditions which are obvious/visible or which should be reasonably anticipated by the Contractor on inspection will not be considered under the Differing Site Conditions provision of the contract.
1.8 ENVIRONMENTAL REQUIREMENTS
1.8.1 Contractor shall comply with “Attachment A - Environmental
Requirements” for the following items:
• Recycling, Salvage and Disposal of Materials Fort Stewart and Hunter Army Airfield
• Toxic Substances Control Act (TSCA) Requirements
• Stormwater / Erosion and Sedimentation Control (E & S) Requirements
• Painting Operations
• Cultural Resource Management (CRM)
2. CONSTRUCTION CONSTRAINTS
2.1 Time of Performance
2.1.1 Access to Buildings – N / A
2.1.2 Work Requiring Outages – N / A
2.2 Outages – N / A
2.3 Continuity – N / A
2.4 Road and/or Railroad Closures
2.4.1 Contractor shall request closure of the road, railroad or bridges by written request to the Contracting Officer’s Representative at least 15 working days prior to the desired closing date for any road, railroad or bridge, or portion thereof, to traffic. The request shall also include a schedule of work for each phase of work for each bridge to be replaced or repaired. A sketch shall be provided showing locations of closure area and placement of barricades and signs for traffic control.
2.4.2 Before closing or removing a road or bridge, contractor shall furnish and erect approved barricades, warning lights, signals and signs to protect the public as approved by the Contracting Officer Representative. Contractor will be responsible for maintaining traffic control devices during construction at each bridge location.
2.4.3 During minor repairs and deck cleaning on bridge the contractor shall maintain one-way traffic on bridges where applicable.
2.5. Entry – Entry to all areas, except the cantonment area, shall be coordinated with the Contracting Officer’s Representative and Range Control, Building 8302, 2405 Georgia Highway 144 East (intersection of Highway 144 and Fort Stewart Road 47) and the Provost Marshal’s Office.
The contractor shall notify the Contracting Officer’s Representative 30 working days in advance to coordinate the contract performance with the Range Control office.
2.6. Fire Zone – The contractor is required to provide 72-hour notice to the
Contracting Officer prior to the final programming of the fire zone information at the main fire station.
2.7. Foreign Object Debris (FOD) – The Contractor shall take special precautions to contain Foreign Object Debris (FOD) in and around any runways, taxiways and aprons.
2.8 Operational Safety on the Airfield During Construction
2.8.1 N / A
3. CONSTRUCTION ACTIVITIES:
3.1 Contractor shall submit a Safety Plan and Construction Schedule to the
Contracting Officer’s Representative (COR) 10 days in advance of any construction activities to arrange specific schedule for performing work as required by this Contract.
3.2 The contractor shall provide and maintain an effective quality control program that complies with the contract clause entitled "Inspection of Construction" (FAR 52.246-12), the below stated quality control requirements and the quality control requirements stated in the respective section of the specifications.
3.2.1 The contractor shall establish a quality control system to perform sufficient inspection and testing of all items of work, including that of his subcontractors. The quality control system shall ensure conformance with applicable specifications and drawings with respect to materials, workmanship, construction, finish, functional performance, and identification. The quality control system shall be established for all construction except where the technical provisions of the contract provide for specific Government control by inspections, tests, or other means. The contractor's control system shall specifically include the surveillance and tests required in the technical provisions of the contract specifications.
Quality control personnel shall also be charged with the responsibility of policing Contractor's Safety Program. This duty shall be clearly set forth in the quality control program.
3.2.2 Before construction operations are commenced, the Contractor shall meet with the Contracting Officer and discuss his quality control plan. The meeting shall develop mutual understanding relative to details of the system, including the forms to be used for recording the quality control operations, inspections, administration of the system, and the interrelationship of Contractor and Government Inspection.
3.2.3 Safety and Health; All work shall be in compliance with U.S. Army Corps of Engineers USACE Engineering Manual 385-1-1.
4. FACTORS AFFECTING PERFORMANCE UNDER THIS CONTRACT:
4.1 The Contractor shall coordinate use of work sites for access, staging, and parking with the COR.
4.2 Contractor shall be responsible for limiting access of its employees and subcontractors to the area of work defined in the Contract.
4.3 Contractor shall maintain haul routes to and from the job sites and the borrow pits, to include the borrow pit. In addition, it is the contractor’s responsibility to meet all Local, State and Federal regulations for the operation of a borrow pit. Contractor shall control runoff and erosion on all excavation and backfilling operations.
4.4 Electric power will not be available for use at job site. It shall be the contractor’s responsibility to furnish all necessary electrical power, temporary wiring and safety devices necessary to comply with the applicable codes/safety requirements.
4.5 Maintenance work on bridges shall be limited to 10 bridges at one time unless approved by the COR. Total bridge replacement shall be limited to two bridges at one time unless approved by the COR.
4.6 Excavation Permits: Permits shall be issued by using the Georgia 811, Utilities Protection Center, Inc. Phone number is 1-800-282-7411.
Excavation of any type is prohibited after normal working hours without prior approval of the Contracting Officer.
4.7 Contractor office trailers and storage yard will be in accordance with “US
Army Garrison, Ft. Stewart and Hunter AAF Policy memorandum #16 - Design and Maintenance of Contractor Storage” dated 25 January 2013.
4.8 Electrical power for temporary construction office during contract will be accomplished through coordination and paid to Canoochee EMC.
5. AS-BUILT RECORD DRAWINGS:
N / A
6. SECURITY REQUIREMENTS.
6.1 All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or the Contracting officer (if a COR has not been designated) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
https://jkodirect.jten.mil/
The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award. The Contractor and all associated sub-contractor employees shall comply with applicable Installation, facility, and area Commander’s local access and security policies and procedures. If required by this contract, the contractor shall also provide all information for background checks to meet Installation access requirements to be accomplished by Installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or Installation change, the Government may require changes in contractor security matters or processes.
https://jkodirect.jten.mil/
RECORD OF ENVIRONMENTAL CONSIDERATION (REC)
This REC was prepared in accordance with the National Environmental Policy Act (NEPA), 32 Code of Federal Regulations (CFR) 651, and Army Regulation (AR) 200-1. The analysis documented in Section 4 is based on the description of the proposed action in Section 2 and any deviation from this description will require re-evaluation by the Installation Environmental Office prior to this action’s implementation.
1. PROJECT TITLE: Indefinite Delivery Indefinite Quantity (IDIQ) Bridge Contract on Fort Stewart (FSGA) and
Hunter Army Airfield (HAAF), Georgia (GA), IJO#s WG 00300-2J and ED 00302-2J (Tab 1).
2. DESCRIPTION OF THE PROPOSED ACTION: The U.S. Army proposes to implement an IDIQ contract by which it will ensure timely maintenance and repairs of the bridges on the installation for the next calendar year (CY) (2023). The purpose of this action is to maintain bridges in accordance with current military standards. If bridges are not maintained in this manner, damage may ultimately result in bridge closure, impacting implementation of the mission on FSGA/HAAF. Bridges have been inspected and deficiencies identified, although no site-specific scope of work (SOW) per bridge was available at the time of this review and REC.
Once the IDIQ contract is awarded, the FSGA/HAAF Design Branch will develop a SOW for each bridge and will issue an individual delivery order for each site (via the FSGA/HAAF IJO process). At that time, the FSGA/HAAF Environmental Office will review each SOW and identify what additional site-specific requirements apply for that bridge, to include Clean Water Act (CWA) permitting, coordination/consultation for National Historic Preservation Act (NHPA) compliance, and others, as required (see comments at Section
4.0 of this REC). If supplemental NEPA is required, it will be completed at that time.
3. ANTICIPATED DATE OF ACTION: CY 2023
4. CONSIDERATIONS OF THE PROPOSED ACTION: The enclosure (Tab 2, Attachment A) contains standard environmental compliance measures for work implemented on Installation lands. Those sections specifically applicable to this action are identified and discussed below.
a. Wetlands: A review of the SOW for each individual bridge will occur as it is developed, and this will be used to determine if a CWA permit (nationwide or individual) is required. The Project POC is responsible for ensuring for this coordination occurs. The Wetlands program POC is Kevin Montano at (912) 767-2010 or (912) 767-4937.
b. Cultural Resources Management (CRM): A review of the individual SOW for each bridge will as it is developed, and this will determine if there are Section 106 NHPA consultation requirements, and consultation will occur at that time. The Project POC is responsible for ensuring this coordination occurs. There are no CRM concerns with the Contract, as written. The CRM POC is Brian Greer,
(912) 767 2010 or (912) 767-0992.
c. Stormwater/Erosion and Sedimentation (E&S): These projects typically involve land disturbing activity of less than 0.75 acres and a Notice of Intent (NOI) is not required; however, NOI requirements will be confirmed as each individual SOW is reviewed and any project that falls outside of existing right of ways must be reviewed by the Stormwater POC prior to any work being performed.
Erosion & Sedimentation Control Best Management Practices (BMPs) must be incorporated and utilized for any land disturbance. Contact the Stormwater POC for recommendations regarding implementation of BMPs, and temporary and/or permanent stabilization controls.
Per the Georgia Erosion and Sedimentation Act of 1975, an individual certified at Erosion & Sedimentation Level 1A, or greater, must be on the site during ANY land disturbing activity within 200 feet of Waters of the State. This requirement applies to all of these actions.
Any waste material and/or debris must be disposed of properly as required by law, and these actions must not discharge into streams, ditches, or other stormwater conveyance systems. The projects will create less than 5,000 square feet (sf) of new impervious surface and will disturb less than 5,000 sf of soil; therefore, the Coastal Stormwater Supplement and Energy Independence Security Act requirements do not apply to this project.
PROJECT TITLE: Indefinite Delivery Indefinite Quantity Bridge Contract on Fort Stewart and Hunter Army Airfield, Georgia, IJO#s WG 00300-2J and ED 00302-2J.
The projects on FSGA are located outside of the 100-year floodplain; however, the work proposed at Bridges 1, 8650, and 8701 are located within the 100-year floodplain and BMPs specific to protecting and minimizing adverse impacts to this sensitive resource will be identified as part of the site-specific scope of work for those locations (Maps, Tab 3). The contractor performing the work shall adhere to all guidance provided in Section 10.0 of Attachment A (Tab 2). The Stormwater and Floodplains program POC is Christian Montano at (912) 767-2010 or (912) 320-0762.
d. Pest Management: Any work recommending/requiring/utilizing pesticides to control vegetation must be conducted in accordance with Department of Defense Instruction 4150.07, Pest Management. This will include performance of work/scope development, contract coordination, pest management certification, applicator certification, pesticide approval, pesticide recording and reporting procedures, etc. The contractor performing the work shall adhere to all guidance provided in Section 17.0 of Attachment A (attached). The Pest Management POC is Craig Crumbley at
(912) 767-2584 or (912) 767-2561.
e. Fill Dirt: Sources of fill are available if necessary. Borrow pits are acquired on a first come, first serve basis, and the determination of soil suitability and quantity is the responsibility of project engineer/manager. Due to locations being nearby/adjacent to wetlands and/or high groundwater levels, dewatering/pumping of borrow pits must be expected. Work must follow the guidelines within the Georgia’s BMPs Guidance to prevent silts and sediments from leaving the borrow pit area and entering the waters of the State of Georgia. Any construction projects or training activities utilizing/impacting an area within a borrow pit must submit an NOI and pay necessary fees. The NOI submittal and processing will take approximately 2-3 weeks. A Borrow Pit Excavation Application must be completed and approved prior to receiving a Borrow Pit Permit. The contractor performing the work shall adhere to all guidance provided in Section 11.0 of Attachment A (Tab 2). The Fill Dirt POC is Kevin Montano, (912) 767-2010 or (912) 767-4937.
f. Forestry: There are no known Forestry concerns with this project provided that merchantable timber will not be damaged or removed. If merchantable sized timber removal will be required, the proponent must contact the Forestry POC to evaluate the site for a possible timber harvest or biomass chipping operation. The Forestry POC is Paul Crowley, (912) 435-8030 or (912) 435- 8016.
g. Fish and Wildlife Branch (FWB): No impacts to protected species are anticipated as a result of these SOWs. The FWB POC is David Lavender, (912) 767-2584 or (912) 767-6765.
h. Recycling/Waste Management: The contractor performing work shall adhere to requirements identified in Section 3.0 of Attachment A (Tab 2) and on the FSGA website at https://home.army.mil/stewart/index.php/about/Garrison/DPW/environmental/prevention-and-compliance/recycling). The Recycling/Waste Management POC is Nolan Fields, (912) 767-2010 or (912) 767-8880.
i. Sustainability Management: The Installation's SMS is in place to ensure proper management of those areas where insufficient effort to adhere to regulations would cause significant negative impacts to the environment. Army Regulation 200-1, Environmental Protection and Enhancement, requires Contractors, lessees, Army Active, National Guard, and Reserve personnel, garrison organizations tenants, and agencies performing functions on real property under jurisdiction of the Department of the Army to adhere to and support the Installation's SMS. All persons working for / on the Installation must strive to conserve water and energy, reduce solid waste disposal (mostly through recycling), and properly manage threatened and endangered species. The work is expected to conform to all operational controls identified in the FSGA SMS necessary for the Government to address environmental performance relative to the goals of the Environmental Management Systems. The Sustainability Management POC is Veronica Frazier, (912) 767-2010 or (912) 767-2400.
5. JUSTIFICATION FOR USING A REC: The proposed action is categorically excluded under the provisions of Categorical Exclusions, Appendix B, of the 32 Code of Federal Regulations Part 651, “Environmental Analysis of Army Actions, Final Rule”, dated 29 March 2002 and meets all the screening criteria as defined in Part 651.29.
https://home.army.mil/stewart/index.php/about/Garrison/DPW/environmental/prevention-and-compliance/recycling https://home.army.mil/stewart/index.php/about/Garrison/DPW/environmental/prevention-and-compliance/recycling
PROJECT TITLE: Indefinite Delivery Indefinite Quantity Bridge Contract on Fort Stewart and Hunter Army Airfield, Georgia, IJO#s WG 00300-2J and ED 00302-2J.
(c) Construction and demolition: (1) Construction of an addition to an existing structure or new construction on a previously undisturbed site if the area to be disturbed has no more than 5.0 cumulative acres of new surface disturbance. This does not include construction of facilities for the transportation, distribution, use, storage, treatment, and disposal of solid waste, medical waste, and hazardous waste (REC required).
(c) Construction and demolition: (2) Demolition of non-historic buildings, structures, or other improvements and disposal of debris therefrom, or removal of a part thereof for disposal, in accordance with applicable regulations, including those regulations applying to removal of asbestos, polychlorinated biphenyls (PCBs), lead-based paint, and other special hazard items (REC required).
(c) Construction and demolition: (3) Road or trail construction and repair on existing rights-of-ways or on previously disturbed areas.
(d) Cultural and natural resource management activities: 2: Routine maintenance of streams and ditches or other rainwater conveyance structures (in accordance with USACE permit authority under Section 404 of the Clean Water Act and applicable state and local permits), and erosion control and stormwater control structures (REC required).
(g) Repair and maintenance activities: (1): Routine repair and maintenance of buildings, airfields, grounds, equipment, and other facilities. Examples include but are not limited to: Removal and disposal of asbestos-containing material (for example, roof material and floor tile) or lead-based paint in accordance with applicable regulations; removal of dead, diseased, or damaged trees; and repair of roofs, doors, windows, or fixtures (REC required for removal and disposal of asbestos-containing material and lead-based paint or work on historic structures).
(g) Repair and maintenance activities: (2): Routine repairs and maintenance of roads, trails, and firebreaks.
Examples include but are not limited to: grading and clearing the roadside of brush with or without the use of herbicides; resurfacing a road to its original conditions; pruning vegetation, removal of dead, diseased, or damaged trees and cleaning culverts; and minor soil stabilization activities.
6. POINT OF CONTACT: The point of contact for this REC can be reached at (912) 767-2010.
SIGNED CONCUR
David DeLoach Thomas C. Fry Chief, Operations and Chief, Environmental Division Maintenance Division Directorate of Public Works
Directorate of Public Works
Date: __________________________________ Date:___________________________
TAB 1
IJOs
TAB 2
Attachment A
ATTACHMENT A
ENVIRONMENTAL REQUIREMENTS - REQUIRED
The following standard Environmental Requirements apply to IDIQ Bridges Contract on Fort Stewart and Hunter Army Airfield, Georgia. The measures identified below will be inserted into the contract/agreement, as applicable, for performing this work.
1.0 SUSTAINABILITY MANAGEMENT SYSTEMS (SMS). Army Regulation 200-1, Environmental Protection and Enhancement, requires Army Active, National Guard, and Reserve personnel, garrison organizations and agencies, and tenants, contractors, and lessees performing functions on real property under jurisdiction of the Department of the Army to adhere to and support the Installation's SMS. The operational controls identified in Fort Stewart/Hunter Army Airfield’s (FSGA/HAAF’s) Environmental Management System include requirements that these entities are knowledgeable of and adhere to the Installation’s Sustainability Policy (R.O.C.K. = Resources, Optimize, Compliance, Keep Improving) and support the Installation’s Sustainability Management System (SMS). All persons working for / on the Installation must strive to conserve water and energy, reduce solid waste disposal (mostly through recycling), and properly manage threatened and endangered species. This system is in place to ensure proper management of those areas where insufficient efforts of adherence to regulations would cause significant negative impacts to the environment.
FSGA/HAAF SMS Point of Contact (POC): Ronald King / ronald.w.king20.civ@army.mil / (912) 767-2010.
1.1 SMS Conformance. Work shall conform to all FSGA/HAAF SMS operational controls to include monitoring and measuring practices established as necessary for the Government to determine environmental performance relative to the goals of the SMS.
As required by Federal Acquisition Regulation (FAR) Subpart 23.9 (Contractor Compliance with Environmental Management Systems), all contracts shall include Contract Clause 52.223-19, Compliance with Environmental Management Systems, as incorporated herein: “The Contractor’s work under this contract shall conform with all operational controls identified in the applicable agency or facility Environmental Management Systems and provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the Environmental Management Systems.”
1.2 Operational Controls. Online SMS General Awareness Training must be completed within 30 days of initiating the action and annually thereafter throughout the performance of the work. If online access is not available, contact the SMS POC to coordinate an alternate group training session.
The online SMS General Awareness Training is available as follows:
a) On the FSGA/HAAF Intranet:
https://home.army.mil/stewart/index.php/about/Garrison/DPW/environmental/prevention-and-compliance/sms. Scroll to bottom of page and click on SMS Awareness Video;
b) On the internet: https://vimeo.com/461049260;
c) If (a) nor (b) is not available, contact the SMS POC via email (ronald.w.king20.civ@army.mil) for additional assistance.
d) The SMS video in (a) and (b) above DO NOT have an exam nor SMS certificate link associated.
Training Coordinators will maintain a Training Sign-In Roster with individual’s name, the date of training, and individual’s signature to document completing SMS Awareness Training.
1.3 REQUIRED SUBMITTTAL ITEM: Documentation confirming completion of the training (e.g., training sign in sheet) shall be submitted (via email) to the project FSGA/HAAF SMS POC, in mailto:ronald.w.king20.civ@army.mil https://home.army.mil/stewart/index.php/about/Garrison/DPW/environmental/prevention-and-compliance/sms https://home.army.mil/stewart/index.php/about/Garrison/DPW/environmental/prevention-and-compliance/sms https://vimeo.com/461049260 mailto:ronald.w.king20.civ@army.mil addition to the Contract Officer’s Representative (COR) or Directorate of Public Works (DPW) Engineering POC, as applicable.
2.0 GREEN / SUSTAINABLE PROCUREMENT. The Contractor (or other Activity performing the specified work on FSGA/HAAF when not performed by contract) shall meet federal Green Procurement and Sustainable Procurement requirements and source reduction strategies in accordance with Army Regulation (AR) 70-1. The purchase of goods and services shall use sustainable environmental practices (e.g., acquisition of bio-based, environmentally preferable, energy-efficient, water-efficient, and recycled-content products) and have a minimum packing and packaging materials for items shipped. Additionally, printer paper should be of at least a 30 percent post-consumer fiber content. It is the Contractor’s responsibility (or other Activity performing the specified work on FSGA/HAAF when not performed by contract) to obtain the most recent copy of AR 70-1 and the U.S. Environmental Protection Agency’s (USEPA’s) Comprehensive Procurement Guidance on their website (currently at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program).
FSGA/HAAF Green/Sustainable Procurement POC: Ronald King / ronald.w.king20.civ@armymil /
(912) 767-2010.
3.0 WASTE MANAGEMENT and RECYCLING
FSGA/HAAF Waste Management & Recycling POC: Johnny Davis / johnny.n.davis.civ@army.mil
/ (912) 767-2010, 767-8880 or 210-6804.
3.1 Waste Management. Government policy is to apply sound environmental principles in the design, construction, and use of facilities. As part of the implementation of that policy, Army Active, National Guard, and Reserve personnel, garrison organizations and agencies, and tenants, contractors/subcontractors, and lessees performing functions on FSGA/HAAF shall (a) practice efficient waste management when sizing, cutting, and installing products and materials, and (b) use all reasonable means to divert construction and demolition (C&D) waste from landfills and incinerators and facilitate their recycling or reuse.
3.1.1 Diversion. A minimum of 60 percent by weight of total project solid waste must be diverted from landfills.
3.1.2 Waste Management Plan. Contractors/subcontractors working on FSGA/HAAF (or other Activity performing the specified work on FSGA/HAAF when not performed by contract) are required to develop and implement a C&D Waste Management Plan. C&D waste includes products of demolition or removal, excess or unusable construction materials, packaging materials for construction products, and other materials generated during the construction process but not incorporated into the work. Source reduction to reduce the initial input into the solid waste stream is required. Consideration shall be given to the availability of viable markets, the condition of the material, the ability to provide the material in suitable condition and in a quantity acceptable to available markets, and time constraints imposed by internal project completion mandates. The Contractor (or other Activity performing the specified work when not performed by contract) is responsible for implementation of any special programs involving rebates or similar incentives related to recycling of waste. Revenues or other savings obtained for salvage or recycling accrue to the Contractor (or other Activity performing the specified work when not performed by contract).
The Contractor (or other Activity performing the specified work when not performed by contract) shall provide on-site instruction of appropriate separation, handling, recycling, salvage, reuse, and return methods to be used by all parties at the appropriate stages of the project. See attached Recycling Clause, "52.000-4061 Recycling, Salvage and Disposal of Materials Fort Stewart and Hunter Army Airfield."
Contractor (or other Activity performing the specified work when not performed by contract) shall submit a Waste Management Plan within 15 days after notice to proceed and not less than 10 days https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program) https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program) mailto:ronald.w.king20.civ@armymil mailto:johnny.n.davis.civ@mail.mil before the preconstruction meeting. The plan demonstrates how to meet the project waste diversion goal and, at a minimum, shall include:
a) Name of individuals on the Contractor's staff (or staff of other Activity performing the specified work when not performed by contract) responsible for waste prevention and management.
b) Actions that will be taken to reduce solid waste generation (to include source reduction), including coordination with others (to include subcontractors) to ensure awareness and participation.
c) Description of the regular meetings to be held to address waste management.
d) Description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas on site and equipment to be used for processing, sorting, and temporary storage of wastes.
e) Characterization, including estimated types and quantities of materials generated to include: (1) waste to be disposed, (2) materials salvaged for reuse on the current project, (3) materials salvaged for resale, and (4) materials recycled. For those items that are disposed, provide an explanation justifying disposal rather than reuse or recycling those materials. Unless otherwise specified, the government retails all salvage rights.
f) Name of landfill, incinerator, or salvage facilities to be used and the estimated costs for use.
g) Description of the means by which any salvage or recyclables identified in item (e) above will be protected from contamination.
h) Description of the means of transportation of the recyclable materials (whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler and removed from the site).
Revise and resubmit Plan as required by the Contracting Officer or other DPW Engineering POC, as applicable. Approval of Contractor's Plan (or the Plan developed by the Activity performing the specified work when not performed by contract) will not relieve the Contractor (or other non-contracted Activity) of responsibility for compliance with applicable environmental regulations or meeting project cumulative waste diversion requirement. Distribute copies of the Waste Management Plan to each Activity (to include subcontractor) involved with the work, the Quality Control Manager, and the COR or DPW Engineering POC, as applicable.
3.1.3 Records. Maintain records to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration. Quantities shall be measured by weight. List each type of waste separately noting the disposal or diversion date. Make the records available to the FSGA/HAAF Waste Management & Recycling POC, and the COR or DPW Engineering POC, as applicable, during construction, and deliver a copy of the records to the COR or DPW Engineering POC, as applicable, upon completion of the construction.
3.1.4 Reports. Provide quarterly reports by the 10th of January, April, July, and October and a final report within 10 calendar days of project completion. Include project name, information for waste generated during the previous quarter, and cumulative totals for the project in quarterly and final reports. Each report shall have supporting documentation as described in 3.1.3 to include solid waste disposal and diversion documentation (to include timber harvest and demolition information), manifests, weight tickets, receipts, and invoices specifically identifying the project and waste material. At each quarterly and final report submittal, furnish electronic copy of each report via email with all supporting documents directly to the FSGA/HAAF Waste Management & Recycling POC in addition to the COR or DPW Engineering POC, as applicable.
3.2 Recycling
3.2.1 Contractors, grantees, lessees, Army Active, National Guard, and Reserve personnel, garrison organizations, tenants, and agencies shall coordinate with the FSGA/HAAF Waste Management & Recycling POC to arrange for turn-in of recyclable/salvageable materials. Identified recyclable and salvageable products shall be separated, stored, protected, and handled at the site in a manner that maximizes recyclability and salvagability. The FSGA/HAAF Waste Management & Recycling POC is available to provide guidance, as needed.
Waste materials not suitable for reuse, but having value as a recyclable material, shall be recycled.
All fluorescent lamps, HID lamps, and mercury-containing thermostats removed from the site shall be recycled. Arrange for timely pickups from the site or deliveries to recycling facilities in order to prevent contamination of recyclable materials at intervals approved by the COR or DPW Engineering POC, as applicable, and the FSGA/HAAF Waste Management & Recycling POC.
Equipment that is/are not reusable but have value as recyclable materials (e.g., Chillers, Pumps, Heating, Ventilation, and Air Conditioning (HVAC) units that have had any and all Freon certified as removed from the system, as applicable) shall be logged on an applicable inventory/certification document prior to turn-in to the FSGA Metal Yard or HAAF Recycling Center (on DD Form 1348).
The form will be used to track the removal of units from facilities, refrigerant removal certification (if applicable), and a chain of custody from removal technician thru supply manager to recycling technician. The serial number and facility number shall be listed on each form and one form may contain more than one like item. Recycling personnel will verify items turned in match the document delivered, sign the document, and retain a file copy. The Contractor/Subcontractor, unit, activity, etc., shall submit this form to the COR or DPW Engineering POC and the FSGA/HAAF Waste Management & Recycling POC.
3.2.2 Containers. Collection containers, bins and storage areas shall be furnished and be clearly and appropriately identified to facilitate effective waste management during the duration of the project or activity. Recyclable material storage areas shall have barriers and enclosures installed around the storage areas which are nonhazardous, and recyclable or reusable. Containers shall be conveniently located for staff that is out of the way of construction traffic and that has adequate space for servicing pick-up and delivery. Recycling and waste bin areas are to be kept neat and clean, and recyclable materials shall be handled to prevent contamination of materials from incompatible products and materials. To the maximum extent practical, clean contaminated materials prior to placing in collection containers. Use cleaning materials that are nonhazardous and biodegradable. Handle hazardous waste and hazardous materials in accordance with applicable regulations.
3.2.3 Separate materials by one of the following methods:
a) Source Separated Method. Waste products and materials that are recyclable shall be separated from trash and sorted as described below into appropriately marked separate containers and then transported to the respective recycling facility for further processing.
b) Co-Mingled Method. Waste products and recyclable materials shall be placed into a single container and then transported to a recycling facility where the recyclable materials are sorted and processed.
c) Other Methods. Other proposed methods may be used when approved by the COR or DPW Engineering POC, as applicable, and the FSGA/HAAF Waste Management & Recycling POC.
3.2.4 Disposal. Control accumulation of waste materials and trash. Materials with no practical use or economic benefit shall be disposed at an off-post landfill or incinerator in compliance with all applicable Waste Management regulations for transportation and disposal and at intervals approved by the COR or DPW Engineering POC, as applicable, and the FSGA/HAAF Waste Management & Recycling POC.
3.2.5 Reuse. Prior to disposal, materials shall first be considered to salvage for reuse since little or no re-processing is necessary for this method, and less pollution is created when items are reused in their original form. Coordinate reuse with the COR or DPW Engineering POC and the FSGA/HAAF Waste Management & Recycling POC.
3.2.6 Return. Materials that are misdelivered and substandard shall not be disposed. They shall be set aside, protected, and returned to supplier for credit.
3.3 REQUIRED SUBMITTAL ITEM: Contractor, agency, lessee, or other Activity performing the work shall submit via electronic mail to the FSGA/HAAF Waste Management & Recycling POC and the COR or DPW Engineering POC, as applicable, (a) a C&D Waste Management Plan as specified above15 days after notice to proceed and not less than 10 days before the preconstruction meeting, and (b) quarterly reports and a final report by the 10th as specified above with all disposal weight/landfill scale tickets as described in the attached Recycling Clause, "52.000-4061 Recycling, Salvage and Disposal of Materials Fort Stewart and Hunter Army Airfield," for any off-post disposal or approved Contractor/Other Activity-retained salvage items. The Contractors, grantees, lessees, Army Active, National Guard, and Reserve personnel, garrison organizations, tenants, and agencies shall turn in all recyclables generated throughout the entire term of the Contract or agreement to perform work (unless otherwise approved for off-site disposal/salvage).
Sections 4.0-9.0 are not required at this time unless project modifications are subsequently added
(Coordinate such modifications with the DPW NEPA Integrator, Ms. Melissa Kendrick, at (912) 767- 2010).
4.0 TOXIC SUBSTANCES CONTROL ACT (TSCA) REQUIREMENTS
5.0 INSTALLING STORAGE TANKS on FSGA/HAAF
6.0 REMOVING UNDERGROUND STORAGE TANKS (USTs) on FSGA/HAAF
7.0 REMOVING ABOVEGROUND STORAGE TANKS (ASTs) on FSGA/HAAF
8.0 WORKING ON or CONNECTING TO DRINKING WATER SYSTEMS
9.0 WORKING ON or CONNECTING TO WASTEWATER SYSTEMS
10.0 STORMWATER/EROSION & SEDIMENTATION CONTROL (E&S) REQUIREMENTS
FSGA/HAAF Stormwater POC: Christian Montano / christian.k.montano.ctr@army.mil / (912) 767- 2010, 767-2171, or 320-0762.
10.1 Requirements for all Sites with Soil Disturbance
10.1.1 The Site Operator (i.e., contractor, unit, tenant, agency, municipality, lessee, etc.) shall utilize and implement Best Management Practices (BMPs) in accordance with the most current edition of the “Green Book” (Manual for Erosion & Sedimentation Control for the State of Georgia).
10.1.2 The Site Operator shall continuously maintain all BMPs through the duration of site disturbing activities to prevent silts and sediments from leaving the construction site. The site shall meet stabilization parameters as required by the State of Georgia prior to project acceptance by the Army as agreed upon by the COR/DPW Engineering POC, NRCS, and the DPW Stormwater POC.
10.1.3 At a minimum, a Level 1A E&S Control Certified individual must be on the site during any land disturbance activity in the State of Georgia.
10.1.4 Site dewatering requires prior coordination with the FSGA/HAAF Stormwater POC and COR or DPW Engineering POC, as applicable, and approval from the Installation Environmental Office.
mailto:christian.k.montano.ctr@mail.mil
10.1.5 Cross drainage facilities that transport stormwater runoff under roadways must meet the 25- to 100-year design storm event, or be in accordance with Georgia Department of Transportation requirements, whichever is more stringent. The design must ensure that the structure(s) will not impact any facilities upstream or downstream during heavy rain events. Culverts, bridges, and/or roadway drainage structures require bank stabilization to prevent erosion during rain events.
10.1.6 Ensure all washouts of trucks and equipment is controlled and discharged with adequate E&S control BMPs. Concrete washout and all other waste material and/or debris must be properly contained and disposed (not into streams, ditches, or stormwater conveyance systems). The Site Operator shall adhere to the U.S. Environmental Protection Agency (USEPA) Stormwater Best Management Practice Washout guidance document available on the USEPA website. It is the Site Operator’s responsibility to obtain the latest version of the guidance.
10.1.7 Ensure proper drip pans and secondary containment are utilized for staging, storing, loading, fueling, maintenance, repairs, etc.
10.1.8 Place all fuel storage tanks (to include portable generator systems with self-contained fueling compartments) within plastic lined earthen berms, drive-on, or drive-over containment. The containment area must have a minimum capacity of 110% of the fuel storage tanks capacity for spill prevention, and to capture incidental spills. All fuel storage tanks should be labeled IAW all applicable local, state, federal laws, or industry standard. At a minimum, the tank should display an appropriate hazard warning, material identification, and storage capacity. Coordinate with the FSGA/HAAF Stormwater POC for guidance, as needed.
10.1.9 Weather forecasts shall be tracked to ensure application work (paint, tar, coatings, etc.) that can wash away during rain events is not performed during or prior to forecasted rain events. All product application must have enough time to dry/cure before the next forecasted rain event.
Sections 10.2-10.4 are not required at this time unless project modifications are subsequently added
2010).
10.2 Requirements for development and redevelopment projects undertaken by the Army that exceeds 5,000 square feet (sf, approximately 0.115 acres).
10.3 Requirements for projects undertaken by the Army that creates or adds 5,000 square feet
(sf) (or approximately 0.115 acres) or greater of NEW IMPERVIOUS SURFACE.
10.4 Requirements for Sites with Soil Disturbance of 0.75 Acres or Greater of Land Disturbance.
Land disturbance is inclusive of project entrances / exits, material lay down areas, equipment storage areas, soil stockpile, fill, and muck out areas.
11.0 BORROW PITS & USE OF FILL MATERIALS (ON- & OFF-POST SOURCES)
FSGA/HAAF does not have any on-post borrow or fill dirt material for use on any HAAF project or any project located in FSGA’s cantonment area (also designated as “non-operational” area). Such material must be brought on-post from off-post sources for all HAAF projects and for all FSGA cantonment area projects. Borrow material / fill dirt is available at one of the FSGA on-post borrow pits for use on projects located in FSGA’s operational areas (i.e., non-cantonment area). It is the Contractor’s responsibility (or other Activity performing the specified work when not performed by contract) to ensure the suitability of fill material for the intended purpose. The following requirements apply in addition to those provided elsewhere. Any conflict between requirements specified here with design and specifications shall be brought to the attention of the FSGA/HAAF Borrow Pit POC and the COR or DPW Engineering POC, as applicable.
FSGA/HAAF Borrow Pit POC: Kevin Montano / kevin.m.montano.ctr@army.mil / (912) 767-2010, 767-4937, or 228-7179.
mailto:kevin.m.montano.ctr@army.mil
11.1 Off-Post Soil Testing. The Contractor (or other Activity performing the specified work when not performed by contract) shall test all soils brought onto FSGA/HAAF for Total Petroleum Hydrocarbons (TPH); Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX), a full Toxicity Characteristic Leaching Procedure (TCLP), and hazardous characteristic analysis for ignitability, corrosivity and reactivity. Backfill shall contain no more than 100 parts per million (ppm) of TPH and no more than 10 ppm of BTEX (the sum of Benzene, Toluene, Ethyl Benzene, and Xylene), and shall pass the TCLP test.
11.1.1 The Contractor (or other Activity performing the specified work when not performed by contract) shall collect at least one composite sample of the material obtained from each off-post borrow site will be collected and analyzed using the most current U.S. Environmental Protection Agency (EPA) test methods to validate suitability of soils. It is the Contractor’s responsibility (or other Activity performing the specified work when not performed by contract) to verify these standards are the most current:
a) TPH: EPA 600/4-79/020 Method 418.1
b) BTEX: EPA SW-846.3-3 Method 5030/8020
c) TCLP: EPA SW-846.3-3 Method 1311
d) Ignitability: EPA SW-846 Method 1030
e) Corrosivity: EPA SW-846 Method 9045D
f) Reactivity: No specified test method
11.1.2 REQUIRED SUBMITTAL ITEM: The Contractor (or other Activity performing the specified work when not performed by contract) shall submit to the FSGA/HAAF Borrow Pit POC and COR or DPW Engineering POC, as applicable, two copies of the full set of analytical results for soil testing specified above to include calibration curves and results of calibration tests before any off-site material is brought on-post.
11.2 On-Post Borrow Material. Sources of On-Post fill material may be available following coordination between the DPW Project Manager and the FSGA/HAAF Borrow Pit POC. Use of On-Post borrow pits are accommodated on a first come, first serve basis, so coordination early in the project development phase is encouraged. Soil suitability is the Contractor’s requirement to verify (or other Activity performing the specified work when not performed by contract). The determination of quantity required for an individual project is the responsibility of the DPW Project Manager. It shall be noted that, due to the abundance of wetlands on FSGA and the high groundwater table on portions of the Installation, dewatering and/or pumping at borrow pits shall be anticipated as a part of the overall project. All work at FSGA borrow pits must follow the guidelines within the State of Georgia's Best Management Practices to prevent silts and sediments from leaving the borrow pit area and entering Waters of the State of Georgia.
11.2.1 The Contractor (or other Activity performing the specified work when not performed by contract) shall submit a Borrow Pit Excavation Application to the FSGA/HAAF Borrow Pit POC to receiving an approved Borrow Pit Permit which must be received prior to use. A Borrow Pit Permit will NOT be issued for work for projects with 0.75 acres or greater of land disturbance (as described in Paragraph 10.0, “Stormwater/Erosion & Sedimentation Control (E&S) Requirements”) without verification that a Notice of Intent (NOI) to Discharge Stormwater and all associated Erosion…