This is a Statement of Work (SOW) for fuel oily wastewater removal services at Langley Air Force Base. The contractor shall provide equipment, personnel, and all necessary resources to remove, transport, and dispose of fuel oily wastewater from three 1,000-gallon Convault tanks (Tank #s 707.9, 707.10, and 707.11) located in the Fuel Storage yard. The combined maximum capacity to be removed is 3,000 gallons. Operations must comply with DAFI 23-201 Chapter 8.2 Fuels Environmental and Safety Responsibilities. The contractor shall accomplish removal tasks within 24 hours of service request, operating during normal base hours (0730-1630, Monday through Friday). The contractor must provide an operator and a vehicle equipped with a vacuum or suction pump and hoses; removal occurs through a 4-inch diameter hatch on top of the tanks, requiring a minimum of 20 feet of hose for normal parking configuration.
The place of performance is the main fuels storage yard located behind building 708 at 51 Ward Road, Hampton, VA 23665. The contractor is required to call the Fuels Service Center (757-764-4105) 30 minutes prior to arrival and must have a Fuel Management Flight member escort at all times while in the Fuel Storage yard. The contractor bears full responsibility for reporting and cleaning all spills consistent with current environmental regulations and must reimburse the government for any cleanup costs resulting from contractor-caused spills. Security compliance is mandatory per DAFFARS 5352.242-9000, Contractor Access to Air Force Installations, with all required documentation submitted prior to performance. The contractor will receive a briefing on Joint Base Langley-Eustis spill response procedures at a pre-performance conference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice - Wastewater Disposal.pdf | ||
| Sources Sought Notice - Wastewater Disposal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for Fuel Oily Wastewater Removal
1.0. Scope The contractor shall, except as outlined in this Statement of Work, provide any equipment and personnel necessary in the removal, transportation, and disposal of fuel oily wastewater from the Defense Logistics Agency capitalized fuel tanks attached to the main fuel storage tanks at Langley Air Force Base.
All operations will meet requirements IAW DAFI 23-201 Chapter 8.2 Fuels Environmental and Safety Responsibilities.
2.0. Objectives. The contractor shall remove fuel oily waste from three 1,000-gallon Convault tanks located in the Fuel Storage yard within 24 hours of service request time.
3.0. Tasks. The contractor shall provide an operator and vehicle equipped with a vacuum or suction pump and hoses to remove a combined max capacity of 3,000 gallons of fuel oily wastewater from 3 separate tanks (Tank #s 707.9, 707.10, and 707.11). The oily water waste must be removed through a 4-inch diameter hatch located on top of the tanks. Normal parking configuration for fuel oily water removal requires no less than 20 feet of hose.
4.0. Spill Response. The contractor will be briefed on Joint Base Langley-Eustis spill response procedures at the pre-performance conference. The contractor is responsible for reporting and promptly cleanup all spills in a manner consistent with current environmental regulations, in the event that it is necessary to utilize government material, equipment or personnel to clean up a contractor caused spill, the contractor shall be required to reimburse the government for all associated costs.
5.0. Security Requirements. The contractor shall comply with all requirements and procedures IAW DAFFARS 5352.242-9000, Contractor Access to Air Force Installations. All documentation shall be submitted prior to the performance.
6.0. Place of Performance. Place of work performance will be the main fuels storage yard located behind building 708; 51 Ward Rd, Hampton. VA 23665.
7.0. General Information: The contractor shall perform the services required under this contract during the normal base operating hours (0730-1630 Monday through Friday). The contractor shall be able to accomplish the tasks outline in this Statement of Work within 24 hours service request and must call the Fuels Service Center (757-764-4105) 30 minutes prior to arrival. The contractor shall always have a Fuel Management Flight member escort while performing any services within the Fuel Storage yard.