This Statement of Work outlines installation services required at Luke Air Force Base for one RF Line and grounding protection system for a customer-provided tactical radio, with work to be completed by March 7, 2025. The installation includes LMR400 transmission line with jumpers/flex cable, polyphasers in the COMM Room, antenna mounting to conduit, and tactical radio mounting with power/ground connections. The vendor must provide all installation parts and equipment except for the radio and antenna.

The related pre-solicitation notice indicates that Luke AFB (Air Education and Training Command) will issue a formal RFQ within 3 business days, with responses due January 27, 2025 at 3pm MST. Questions are due by January 24, 2025. Key vendor responsibilities include equipment testing, safety procedures, debris disposal, and manufacturer-compliant installation. Luke AFB will provide site access, escorts, electrical power, space for installation, ground bar for Polyphaser connection, and ensure radio equipment is pre-programmed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

To

LUKE AFB, AZ

Jan 16, 2025

Statement of Work (SOW) for Installation Services:

Request quote to Luke AFB for the installation of (1) RF Line and grounding protection to the customer provided tactical radio. The paragraphs below provide General Responsibilities for vendor and Luke AFB.

OVERVIEW

1. Installation of LMR400 transmission line (including jumper or flex cable) and polyphasers inside the COMM Room through customer provided pathway thru customer provided roof penetration/building exit point to the supplied antenna

1. Mount the antenna to the conduit (weather head mount), secure connections and line, ground antenna/line as needed

1. Mount tactical radio onto the desired customer location and provide power, ground, and antenna line connections

1. Connectors, surge suppressor, line, and miscellaneous parts/equipment will be provided by the vendor and is included in the pricing

1. (Vendor) Supply all parts need for the installation; government only provides the radio and antenna for contractor installation as stipulated above

Vendor’s Responsibilities:

1. Perform testing and optimization of equipment

2. Administer safe work procedures

3. Ensure the proper disposal of all debris generated from activities

4. Perform the installation being purchased under this quotation

5. Perform all work and tasks required according to manufacturers’ recommendations during Installation

Luke AFB Responsibilities:

1. Provide all authorizations to perform the installation services

2. Obtain and provide all approvals, permits, and agreements as required at all sites and locations

3. Provide site access and escort as required, in a timely manner during normal work hours

4. Provide adequate space for equipment to be installed, garage space will need to be provided

5. Provide primary electrical power at site(s)

6. Provide connectivity and connections at the equipment location(s)

7. Provide and program the tactical radio

8. Provide a ground bar for Polyphaser connection

9. Provide Point of Contact to monitor and answer questions related to project

10. Proved that all of newly purchased radio equipment is programmed prior to the installation of the new equipment.

11. Sign “Installation Completion Form” upon satisfactory completion of project

Work completed no later than: 7 March, 2025