Statement of Work Tug Service PONCE PR..doc
DOC document 55 KB Posted
- Attached to
- TUG SERVICES FOR CGC STRATTON
- Solicitation number
- 11703QR26000XXXX
About this file
This document is a Statement of Work for tug harbor assistance services for the US Coast Guard Cutter (CGC) STRATTON in Ponce, Puerto Rico. The US Coast Guard is seeking two tugboats, each with a minimum of 2,000 horsepower, to assist with maritime maneuvers during the vessel's arrival and departure on January 24, 2026. The solicitation is a small business set-aside with a size standard of 1,500 employees, and will be awarded as a firm-fixed price contract using simplified acquisition procedures. Specific requirements include the tugs taking commands from the STRATTON's pilot house on VHF channel 77, maintaining position in the channel until released, and assisting with mooring evolutions. The primary point of contact is Contracting Officer SKC Jenelle Lujan, and the service is being procured through the Department of Homeland Security US Coast Guard.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
TUG HARBOR ASSIST FOR CGC STRATTON
RFQ: 11703QR26000XXXX
In the performance of this contract, the contractor shall provide two (2) tugs meeting a minimum of 2,000 horsepower. Tugs will assist with manuevering inbound and outbound of PONCE, PR.
1. Point of Contacts
The point of contacts for this service request are:
Contracting Officer: SKC Jenelle Lujan, Jenelle.N.Lujan@uscg.mil, (571) 610-2319 Contract Specialist:
Assistant Navigator: LTJG Daniel Unangst, Daniel.H.Unangst@uscg.mil
2. Scope of Requirements The contractor shall provide all vessels, equipment, and labor for the performance of this requirement:
2.1 Contractor shall provide two (2) tugs with qualified captain meeting a minimum horsepower of 2,000.
2.2 Contractor shall take commands from STRATTON pilot house over VHF channel 77.
2.3 Contractor shall assist cutter in mooring evolutions for departure and arrival in PONCE, PR.
2.4 Contractor shall maintain position in vicinity of STRATTON for navigation of channel until released by STRATTON pilot house. .
3. Period of Performance Arrival: Date: 24 January 2026 Time: 0930 am E.S.T Location:
Destination: PONCE, PR.
Departure: Date: 24 January 2026 Time: 1:30 pm E.S.T Location:
Destination: Out to sea **Times are subject to change**
File details come from the government source that posted it. Updated .