Statement of Work - Temporary Big Top Existing Opening Enclosure 2026 RIDLEY.doc

DOC document 2 MB Posted

Attached to
Shrink Wrapping Services for 87' Coast Guard Patrol Boat
Solicitation number
70Z04026Q60005
Issued by

About this file

This is a Statement of Work for containment and shrink wrap services related to a temporary Big Top enclosure at the U.S. Coast Guard Yard, Baltimore, Maryland. The contractor must provide all personnel, equipment, tools, and supervision necessary to construct and install a fireproof shrink wrap containment system to seal a damaged 30' x 30' equipment access door opening on an existing Big Top structure. The work must commence within three calendar days of award with a target start date of September 14, 2026, and must be completed within seven calendar days. The containment structure must sustain winds up to 60 mph, prevent water intrusion, and contain grit blasting media and paint overspray during ship maintenance operations inside the enclosure.

The contractor is responsible for furnishing all labor, materials, and equipment for installation and must provide weekly safety inspections and maintenance/repairs at no additional cost, with 8-hour on-site response time for any needed repairs. The government will furnish crane services, utilities (water, compressed air, electricity up to 200 amps at 480 volts), and material handling services with 24-hour notice. All work must comply with OSHA Shipyard standards (29 CFR 1915), safety requirements including hard hats and safety harnesses, and Coast Guard Yard security protocols requiring RAPIDGate or TWIC card access. Upon completion, the contractor must remove all equipment and debris, and weekly options are available for extending the containment enclosure for additional weeks. Contract award is anticipated as a Firm Fixed Price Purchase Order under FAR 12 for commercial items, with evaluation based on technical compliance, deadline achievement, and price.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

CONTAINMENT

CGC Ridley

PR 2126406Y6176K89008

Performance Work Statement Shrink Wrap Big Top Shell Work Item #1: General Requirements

1. GENERAL REQUIREMENTS: The contractor shall provide all personnel, equipment, tools, supervision, and other items necessary to perform Containment Services, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this order. If there are no specified standards, then standards will be set at the commercial standard.

Contractor shall comply with OSHA Shipyard standards contained in 29 CFR 1915 in the erection, modification, repair, transportation, and disassembly of all scaffolds, ladders and working surfaces while performing at the USCG Yard.

2. MAINTENANCE AND REPAIR: The contractor must be able to provide maintenance/repairs if needed to the structure at no additional cost to the Government. If maintenance or repairs are needed the contractor must be able to be on site within 8 hours to handle the maintenance or repairs.

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

Services: The Government will provide crane service if requested by contractor. The Coast Guard Yard will give an effort in providing timely assistance as requested by the Contractor. The Contractor shall provide 24-hour notice to the Government when there is a need for material handling services.

If Contractor requires services (i.e. additional crane services, manlifts, etc) from Government, these shall be detailed in bid submission.

Utilities: The Government will provide water, compressed air, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work. The Government shall advise the Contractor of all planned air or power outages, for planning purposes, but in the event of unplanned outages during the Period of Performance, the Contractor is required to provide as required to maintain schedule.

Electricity: The Government shall provide up to 200 amps and up to 480 volts of electrical services.

Smoking Area: The Government will designate a smoking area if requested by contractor. Smoking is not permitted in the ship handling area, onboard any vessels, in any buildings, or outside of any designated smoking area.

4. CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:

General: The Contractor shall furnish all equipment and services required to perform work under this Performance Work Statement, other than those explicitly addressed in government furnished services.

Services: Unless specifically requested in bid submission and accepted by Government, the Contractor shall provide material handling services to load and unload Contractor machinery and for the setup of equipment (forklift, manlift, etc).

Period of Performance: The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. All work must be completed within the Period of Performance (POP). If weather or other delays require more time, the contractor is required to notify Contracting Officer or Contracting Officer Representative via e-mail the same day that work could not be performed. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the time period and quantity specified.

Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning equipment and tools to complete assigned work.

5. Safety Equipment

Safety: The area where this work taking place requires hard hats, safety harnesses and safety glasses always. The Contractor is to follow all applicable OSHA guidelines and regulations. It is also required that all COVID safety practices are followed.

Equipment Standards: Contractor’s trucks and equipment shall be maintained in an operable condition that meets all Federal, State of Maryland, and local safety requirements.

6. Security Requirements: The U.S. Coast Guard Yard, Baltimore, MD is a controlled access area. All contractors and subcontractors performing work on this contract are recommended to use RAPIDGate or TWIC card access. RAPIDGate manages the non-Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard, Baltimore. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard yard and logical access to a DoD or DHS network or system.

a. Contractor employees shall not enter restricted areas in accordance with Yard security regulations or policies. Before contractor employees can work at the Coast Guard Yard Facility, the contractor shall complete a security investigation on all contractor employees in connection to this contract. Any contractor employee with a criminal background must get prior authorization before they can gain access to Coast Guard Yard Facility. Contractor shall provide for each employee to the Contracting Officer, the full name and any alias, address, city and state, and date of birth.

Work Item #2 Provision & Set Up of Containment

1. COMMENCEMENT OF WORK: Upon award of contract; the Contractor shall provide Containment Services in three calendar days with a start date on or around 9/14/26.

2. SCOPE OF WORK:

Intention: To build and shrink wrap containment wall to seal opening in Big Top enclosure.

Existing Structure: Existing Big Top enclosure will be moved into place prior to building the containment wall to cover existing opening. Once both halves of Big Top are in place, commencement of work on existing opening may begin.

Particulars: Shrink wrap material must be fireproof. The Contractor is to supply all labor and materials shrinkwrap Big Top door opening. The purpose of the containment system is to maintain a constant environment, contain blast media, dust, and paint overspray and to keep out rain, snow, animals, and other foreign objects. The structure shall be sufficiently constructed to prevent moisture or precipitation intrusion into the structure from surrounding environment.

Contractor is to provide structure and shrinkwrap services (labor and installation) to seal damaged equipment access door on existing/undamaged “Big Top” structure end. Affixing additional supports to existing structure to facilitate installation is authorized. Structure must sustain up to 60 mph sustained wind speed and shall not allow water intrusion into the enclosure. Photos below depict examples of existing equipment access door that must be sealed. Approximate dimensions of opening to be sealed are 30’ X 30’, however a site visit is recommended to ensure measurements are accurate.

Photo: Example equipment door (exterior)

Photo: Actual equipment door that must be sealed (interior view). Existing door has been removed.

Photo: Existing structure framing in vicinity of equipment door.

Structure Survivability: Grit blasting will occur inside the enclosure; grit shall remain dry for timely vacuum removal. Painting will also be occurring inside the enclosure, therefore paint overspray will occur. The structure shall be designed to sustain and contain the byproducts of these processes without repair or modification.

The government reserves the right to modify the shrink wrap enclosure to run temporary service ducting such as dust collection hoses, air conditioning hoses, water, sewage, power, etc.

Structure Inspection: The Contractor and Government shall jointly inspect shrink wrap upon completion; designated Government representative(s) will provide formal acceptance of completion on behalf of the Government. The Contractor shall provide weekly safety inspection and repair of the enclosure, at no additional cost to the government.

Site Visit: A site visit can be held when required by contractor.

Period of Performance: The start date is September 14, 2026, and must be completed in Seven calendar days.

Build Plan: The Government will continue to have access to the ship during building and removal of the structure unless requested by the contractor 72 hours in advance.

Work Item #3: Removal of Containment

1. COMPLETION OF WORK: The Contractor shall remove Shrink Wrap Services and equipment door structure iaw POP.

2. SCOPE OF WORK:

Disassembly: The contractor will be held liable for any damages caused during disassembly.

Disposal and Removal: The Contractor is responsible for removal of all equipment and debris generated under this contract.

Work Item #4: Optional Extension

1. SCOPE OF WORK:

Weekly options shall be priced for keeping containment up for additional weeks.

File details come from the government source that posted it. Updated .