Statement of Work Template.doc
DOC document 80 KB Posted
- Attached to
- Freezer Repair Federal contract opportunity
- Solicitation number
- 12405B23Q0588
About this file
This document is a statement of work template for replacing a refrigeration unit in a walk-in freezer. The scope of work involves replacing the refrigeration unit on the freezer side of a walk-in cooler with a split system unit rated for -10 degrees Fahrenheit and 12416 BTU/H capacity. The contractor must provide all documentation associated with the new refrigeration unit, complete the work during standard business hours from Monday through Friday, and be responsible for transporting personnel, equipment, and removing the old unit. The contractor's personnel must be licensed and bonded for refrigeration work. This statement of work is related to solicitation number 12405B23Q0588 from the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery for freezer repair services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Clauses and Provisions.docx | DOCX document | |
| Beta Sam Solicitation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair by Replacing Refrigeration unit in Walkin Cooler (Freezer)
Statement of Work (SOW) Project: Repair by Replacing Refrigeration unit in Walkin Cooler (Freezer)
GENERAL INFORMATION
1.0 Scope of Work: Replace Refrigeration Unit for freezer side of the walkin cooler.
Split System Basedon NoofSystems : 1 Room Temp:-10F° Evap TD: 9.7 LineLoss: 2 Balanced Capacity: 12416.0BTU/H Run Time: 18.12Hours Refrigerant Type: R448A
CULK SCRL4.5HP 208-230/3/60LOW
Ambient Temp: 100 F° Suction Temp: -21.7 F° Voltage :208-230/3/60 AWEF Value : 3.15
ELECTRIC DEFROSTTIMER U C L L P EL 3 F 2 3 0 1 P H M I N T N 6
Evap. Temp: -21.7 F° Voltage: 208-230/1/60 CoolerAWEF > 32: 9 FreezerAWEF=< 32: 4 Leak testing and cooling testing 4.0 Government Furnished: Work will be complete during work hours Monday – Friday 8am – 430pm. Facility closed Saturday, Sunday and Federal Holidays.
5.0 Deliverables / Schedule: All documents associated with the new refrigeration unit.
6.0 Travel: Contractor responsible for transportation of installation personnel, replacement equipment, tools needed to accomplish task and the back haul of old equipment.
7.0 Contractor’s Key Personnel: Personnel licensed in refrigeration and bonded.
8.0 Security Requirements: N/A 9.0 Data Rights: N/A 10.0 Section 508 – Electronic and Information Technology Standards: N/A Attachment: N/A