Statement of Work Station Cape Disappointment Rain Gutter Repair.pdf

PDF 171 KB Posted

Attached to
Gutter repair system USCG Station Cape Disappointment
Solicitation number
70Z03325QSEAT0008
Issued by

About this file

This Statement of Work (SOW) details a gutter repair project for the U.S. Coast Guard Station Cape Disappointment located in Ilwaco, Washington. The contractor is required to remove the existing cast iron gutter system on the Station School House building and install a new gutter system consisting of approximately 750 linear feet of gutters, downspouts, hangers, and fixtures. The work must meet current USCG facility standards and local building codes, and includes inspecting and repairing any damaged fascia boards or soffits.

Key project requirements include performing the work in a workmanship-like manner following OSHA safety standards, ensuring all new parts meet ASTM durability and corrosion resistance standards, directing downspouts away from the building foundation, thoroughly testing the system for proper water flow, and providing a minimum one-year warranty on parts and workmanship. The contractor must mobilize personnel and equipment, remove damaged sections, replace with industry-standard materials, clean and dispose of debris properly, and restore the work area. Work is to be performed Monday through Friday between 8:00 am and 4:00 pm, with the contractor responsible for all safety compliance and potential interferences during the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

USCG Station Cape Disappointment Rain Gutter Repair

PART 1 - GENERAL

1 - Scope Of Work

The intent of this Statement of Work (SOW) is to have the contractor repair the gutter system on the Station School House building at USCG Station Cape Disappointment. The contractor will provide all labor, materials, services, equipment, and supervision necessary to complete the repair of the gutter system to ensure proper water flow and prevent any potential damage to the building.

2 - Place of Performance

USCG Station Cape Disappointment 322 Coast Guard Rd.

Ilwaco, WA 98624

Contractor Personnel

Contract Manager

• The contractor must provide a contract manager who must be responsible for the performance of the work.

• The contract manager or alternate(s) must have full authority to act for the contractor on all contract matters relating to daily operation of this contract

• The contact manager and alternate or alternates must be able to read, write, speak, and understand the English language.

Contractor employees

• The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

• Contactor personnel must present a neat appearance and be easily recognized as contractor employees.

• The contractor must not employ any person who is an employee of the U. S.

Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U. S. Coast

Guard unless such person seeks and receives approval according to U. S. Coast Guard regulations.

Security requirements

Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, while onboard a Coast Guard facility, shall have proper valid identification. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition.

Hours of Operation – Projected Date of Completion

• The contractor must perform the tasks as required by the SOW under this contract during the following hours:

• Monday through Friday between 08:00 am and 16:00 pm unless other time is specified.

• Holidays: If applicable.

• Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required above, the contractor must request the same in writing. Submit written request to the Contracting Point of Contact (POC) a minimum of 24 hours before the requested adjusted work schedule.

If the desired schedule change is to be effective on a Monday, the request must be submitted to the (POC) prior to 9:00am on the Friday prior to commencement of work.

Invoicing

In conjunction with the subject award, proper invoices will be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. IPP is a secure web-based electronic invoicing system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis (FRSTL). IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.

Actions to take:

If you are already enrolled in IPP:

If your company is already registered to use IPP, you will not be required to re-register and you do not need to contact IPP.

If you are NOT already enrolled in IPP:

The point of contact you provided in your SAM.gov registration will receive two emails from ipp.noreply@mail.eroc.twai.gov. Please note that emails from this email address may filter into your spam or junk folder:

1. The first email will have the IPP Logon ID and a link to the IPP application.

2. A second email, which will be sent within 24 hours of the first email, contains a temporary password.

Once your contact receives these emails, please ensure they log into IPP and complete the registration process.

Once registered to use IPP, your company may submit invoices electronically, receive e-mail notifications when requests are paid, view payment history, and access remittance downloads.

The e-mail notification of payment is sent when a payment is distributed to your bank account and may include the following payment information: Date of payment, dollar amount, invoice number, paying agency, payee name, and ACH trace number.

Vendor training materials, including a first time login tutorial, are available on the https://www.ipp.gov/ website. Once you have logged in to the IPP application, you will have access to user guides that provide step-by-step instructions for all IPP capabilities, ranging from creating and submitting an invoice to setting up email notifications. Live webinars are held monthly and provide a great opportunity to learn the basic of the system and to call in and ask the IPP team questions about the IPP application.

IPP Customer Support is available to assist users of the system and can answer your questions related to accessing IPP or completing the registration process.

• Toll-free number: 866-973-3131

• Email address: IPPCustomerSupport@fiscal.treasury.gov

• Hours of operation: Monday through Friday (excluding bank holidays) from 8:00 am - 6:00 pm ET

PART 2 - DEFINITIONS

General Definitions

When the Statement of Work (SOW), solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulations (FAR), the word or term has the same meaning as the definition as contained in section 2.101 of the FAR. The FAR index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix.

Defective Service: A service or commodity output that does not meet the standard of performance requirement specified in the contract for that service or commodity.

Quality Assurance: A planned and systematic pattern of all government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government assurance functions for a contracted service.

Quality Control: Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements.

Technical Definitions: Not applicable to contract.

PART 3 - GOVERNMENT FURNISHED PROPERTY AND SERVICES

General Information

The Government must provide the facilities, equipment, materials, and services listed here:

Government Furnished Equipment:

The following utilities are available for use at no cost by the contractor:

• 120v power supply

• Water supply

Government Furnished Material: None.

PART 4 - CONTRACTOR FURNISHED ITEMS AND SERVICES

Except for those items, services, or commodities specifically stated in part 3 above as government furnished, the contractor must furnish everything needed to perform this contract according to all its terms.

PART 5 - SPECIFIC TASKS

The contractor shall remove the existing gutter system on the Station School House building at USCG Station Cape Disappointment, 322 Coast Guard Rd., Ilwaco, WA 98624. The contractor shall install a new gutter system, including approximately 750 linear feet of gutters, downspouts, and all necessary hangers and fixtures to ensure proper drainage. The installation must meet current USCG facility standards and local building codes. The contractor shall also inspect and repair any damaged fascia boards or soffits associated with the gutter system to ensure structural integrity and proper function.

DETAILED TASKS

1. The contractor shall mobilize all necessary equipment and personnel to the Station School House building site in preparation for the repair of the gutter system.

2. Inspect the entire gutter piping system to assess the condition and identify sections that are damaged or corroded.

3. Crop out and remove all identified damaged or corroded sections of the gutter piping system.

4. Replace the removed sections with industry-standard piping, ensuring compatibility with the existing system.

5. Perform thorough checks for leaks across the entire gutter piping system, including newly installed sections, to ensure system integrity.

6. Properly dispose of all debris, including removed damaged/corroded piping and other construction waste, in accordance with local, state, and federal regulations.

7. Conduct site clean-up and restoration activities to return the area to its pre-repair condition.

8. Demobilize all equipment and personnel from the site upon completion of the repair tasks.

OTHER

9. All work shall be performed in a workmanship-like manner following OSHA Safety and Health Standards.

10. Verify all existing sections of the gutter system to identify areas requiring repair or replacement.

11. Existing gutter system is cast iron piping. Replacement should be industry standard material.

12. Ensure all gutter sections, connectors, and downspouts are securely fastened and free of leaks.

13. Any replacement parts must meet or exceed ASTM standards for durability and corrosion resistance.

14. Remove all debris and clean the gutter system thoroughly before installation.

15. All downspouts shall be directed away from the building foundation to prevent water infiltration.

16. Test the entire gutter system for proper water flow and drainage after repairs are completed.

17. Provide a warranty of at least one year on all parts and workmanship.

18. Ensure all work areas are clean and free of hazards upon completion of the project.

Interferences:

The contractor shall be responsible for any/all interferences that may be encountered while completing this SOW.

Safety:

All work shall be conducted in a safe manner and shall comply with all applicable Federal, State, and local safety standards and requirements. The US Coast Guard reserves the right to inspect for compliance with safety standards and requirements. The Contractor shall comply with all Federal, State, and local laws, including OSHA.

Operations and Storage Facilities:

The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the on-site representative with the concurrence of the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.

PART 6 - TESTING AND ACCEPTANCE

Testing

The contractor shall document and certify operational functionality test.

Acceptance

Acceptance on behalf of the government will be made by the POC as attested to / witnessed by signatures on the contractor generated document / form per section 6 "Testing" above.

PART 7 - APPLICABLE PUBLICATIONS AND FORMS

Publications and forms that apply to the (SOW) are listed below. The publications and forms have been designated as either mandatory or informational. The contractor is obligated to follow those publications and use those forms designated as mandatory to the extent specified in other sections of this (SOW). The contractor must be guided by those publications or use those forms designated as informational to the extent necessary to accomplish requirement in this (SOW).

Publications

OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction

END