Statement of Work (SOW) MK75 RECUPERATOR MCA.doc

DOC document 74 KB Posted

Attached to
MK75 RECUPERATOR MCA Federal contract opportunity
Solicitation number
70Z04022QPESDD001
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to MK75 RECUPERATOR MCA, newest first.
File Type Posted
FAR CLAUSES SERVICES.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #:

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

MK75 RECUPERATOR MCA

Product Service Code: 1015 – Guns, 75mm through 125mm NAICS Code: 332994 – Small Arms, Ordnance, and Ordnance Accessories Manufacturing

1.0 GENERAL

1.1 Background

1.2 Scope

1.3 OBJECTIVE

1.4 APPLICABLE DOCUMENTS

1.4.1 Compliance Documents

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:

NAVSEA OD 51246

2.0 SPECIFIC REQUIREMENTS/TASKS

2.1 TASK ONE.

United States Coast Guard, Surface Forces Logistics Center (SFLC) Engineering Services Division is seeking eligible Sources to furnish effort including labor, materiel, and facilities as may be required to inspect, repair, replace, rebuild, and test as necessary to return materiel to a serviceable-ready for issue (RFI)-condition for the following:

NSN: 1015-01-045-1427, Recuperator Assembly (6 Each)

Performance test data shall be accomplished per Ordnance Data 76-mm 62-Caliber Gun Mount MARK 75 MOD 0 Quality Assurance Provisions, NAVSEA OD 51246.

RFI is defined as a condition which allows items to perform properly and reliably in a manner they were intended to operate. The contractor must perform all repairs/testing at their facility, and Quality Assurance Provisions must comply with NAVSEA OD 51246.

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.

3.2 CONTINUITY OF SUPPORT

The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.

3.3 PROJECT MANAGER

The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be a single point of contact for the Contracting Officer and the COR. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates shall be able to read, write, speak and understand English. Additionally, the Contractor shall not replace the Project Manager without prior approval from the Contracting Officer.

3.4.1 The Project Manager shall be available to the COR via telephone between the hours of 0800 and 1600 EST, Monday through Friday, and shall respond to a request for discussion or resolution of technical problems within 24 hours of notification.

4.0 OTHER APPLICABLE CONDITIONS

4.2 Period of Performance

The period of performance for this contract shall not exceed 180 calendar days from the date of award.

4.3 PLACE OF PERFORMANCE

The primary place of performance will be a combination of the Contractor’s facilities.

4.11 GENERAL REPORT REQUIREMENTS

The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows XP and Microsoft Office Applications).

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.