Statement of Work SOW Electrical Hydroponic Containers.pdf

PDF 3 MB Posted

Attached to
Electrical Power for (2) Hydroponic Containers Federal contract opportunity
Solicitation number
12405B23Q0525
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

About this file

This statement of work outlines electrical requirements for connecting power to two hydroponic containers located at Picos Farm in Fort Pierce, Florida for the US Department of Agriculture Agricultural Research Service. The scope of work includes assessing electrical load requirements, installing approximately 500 feet of underground cable from the electrical room to the container locations, providing self-supporting weatherproof disconnect switches and grounding rods for each container, and completing all work in accordance with the National Electric Code. The related federal contract opportunity solicitation seeks electrical power installation services for the two hydroponic containers located at Picos Farm in support of Agricultural Research Service field research.

View the file

Other files for this federal contract opportunity

Other files attached to Electrical Power for (2) Hydroponic Containers, newest first.
File Type Posted
SF30 AMENDMENT 0002 SOLICITATION 12405B23Q0525.pdf PDF
SF30 AMENDMENT 0001 SOLICITATION 12405B23Q0525.pdf PDF
Wage Grade Determination SCA 2015-4563 St Lucie County Florida Solicitation 12405B23Q0525.pdf PDF
SOLICITATION 12405B23Q0525.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

ELECTRICAL HYDROPONIC CONTAINERS

The US Department of Agriculture (USDA), Agricultural Research Service (ARS), US Horticultural Research Laboratory (USHRL) needs a single Contractor who can provide supplies, services, supervision, transportation, labor, work plan, schedule, and assure effective performance to connect power to (2) hydroponic containers side by side located at Picos Farm, 10,000 Picos Road, Ft Pierce, FL 34945. Each hydroponic container measured 40ft long x 8ft wide x 9ft-6 inches high.

1. SCOPE OF WORK

The general statement of work shall serve as general information only and shall not limit the Contractor’s responsibility or obligations to conform to all local, state, and federal labor laws necessary to furnish and install (2) complete hydroponic containers including but not limited to the following:

A. Electrical:

Assess electrical load requirements. Power source coming from the mechanic’s shop electrical room. Per manufacturer recommendation, each hydroponic container required a 125Amp service panel with 220/120VAC 4 wire service. All electrical installation must be in accordance with the current version of the National Electric Code (NEC).

B1. Install cables utilizing the shortest route possible with no splices preferred. Estimated cable run from the electrical switch gear room to the propose location including turns is approximately 500 ft.

B2. All below grade cables must be properly protected and warning tape installed above the cable run. Bottom of the trench must be compacted-graded smooth, and no sharp-edged materials are encountered.

B3. Provide polyethylene plastic warning tape in the backfill above all underground cables and conduits. The tape shall be minimum of 3 inches wide to identify buried utility lines.

Red – Electric

B4. A self-supporting weatherproof disconnect switch must be provided to each container.

B5. Containers must be properly grounded. Grounding cables must be exothermically welded into copper solid grounding rod 3/4 inches x 10 ft in length. Resistance not to exceed 25 ohms.

2. PROPOSE LOCATION:

A. Picos Farm Aerial View

B. Hydroponic Containers Propose Location

C. SAMPLE PHOTOS OF HYDROPONIC CONTAINERs (ARS South Carolina)

Chiller