Statement of Work (SOW).pdf

PDF 92 KB Posted

Attached to
Evaluation, Calibration, and Repair of USM-708 CRAFT Test Sets
Solicitation number
70Z03824QE0000085
Issued by

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity issued by the United States Coast Guard (USCG) Aviation Logistics Center (ALC).

The SOW outlines the requirements for the evaluation, calibration, and repair of four USM-708 CRAFT Test Sets with specific serial numbers. The Contractor is required to perform calibration, minor/major repairs, and return the items to ready-for-issue (RFI) condition in accordance with Original Equipment Manufacturer (OEM) specifications. The Contractor must have access to the necessary technical data to perform the work. The USCG will provide disposition instructions for items determined to be beyond economical repair. The purchase order will be awarded on a sole-source basis to Tel-Instrument Electronics Corp as the only known source. Offers are due by 4 September 2024, and the anticipated award date is 5 September 2024. Pricing is on a firm-fixed price basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMBINED SYNOPSIS/SOLICITATION 70Z03824QE0000085

STATEMENT OF WORK (SOW)

CONTRACTOR REQUIREMENTS

1. The United States Coast Guard (USCG), Aviation Logistics Center (ALC) will furnish the items listed in the Schedule for evaluation, major/minor repairs & calibration.

2. The items under this order are tracked in the USCG’s Asset Computerized Maintenance System

(ACMS). ACMS is the internal management information system used by the USCG to record maintenance and repair actions on aircraft and related systems and components.

3. Items under this order will be shipped to the Contractor with a Significant Component History

Report (SCHR) and a Component Repair Record (CRR). The SCHR records the maintenance history of serial number tracked items. The CRR remains with its corresponding part until the part is determined to be Beyond Economical Repair (BER) and scrapped. (NOTE: written approval from the Contracting

Officer is required prior to scrapping a serial number tracked item.) The Contractor is required to ensure that the SCHR remains with and is returned with the correct part. The Contractor shall retain a copy of the SCHR for 90 calendar days.

4. In the event that items under this order require repairs which are subsequently reviewed and approved by the Contracting Officer, the Contractor shall complete and provide a CRR for the repaired item(s). The

CRR records the maintenance and repairs performed on a serial number tracked item. The CRR shall include the NSN, PN, SN, nomenclature, date of repair, purchase order number, line item number, a description of all maintenance/repair actions, a listing of any parts repaired, a listing of any parts replaced, and any service bulletins or modifications that were incorporated. The Contractor’s in-house work order may be used to satisfy this requirement if it includes all of the required information.

5. The Contractor shall distribute the CRR (or its equivalent) as follows:

• Pack the original, completed CRR with the repaired component;

• Email one (1) copy of the completed CRR to the Purchasing Agent at Geneva.K.James@uscg.mil no later than five (5) business days following completion of the repair effort; and

• Retain a copy of each CRR for 90 calendar days.

6. The items under this order require calibration. Calibration shall be performed after each recertification cycle and shall include adjustment and correction so that the item performs at an acceptable level.

Calibration shall also encompass identifying and determining the cause(s) of errors and performing corrective action(s) when applicable. Calibration shall consist of a comparison of the device under test with a calibration standard of known accuracy. The calibration standard shall be traceable to a national or international standard.

7. The Contractor shall provide the following:

a. A certificate of calibration for each unit to include a certificate number, name or initials of person performing the calibration, calibration date, unit type, unit manufacturer, unit model number, unit serial number, adjustment or service performed, calibration results, a description of calibration, type of calibration procedure performed. The certificate of calibration shall be emailed to the Purchasing Agent at Geneva.K.James@uscg.mil and attached to the packing slip when returning the RFI item.

b. A decal on the unit to indicate current calibration. The decal shall include the calibration date, name or initials of person performing the calibration, month and year when next calibration is due, unit serial number, and the name of the company performing calibration.

• Decals shall be applied in such a manner that will not cause damage to the equipment or at a later date when the decal is removed.

• Decals shall not be applied as to hinder the reading of any display.

8. Items shall be repaired and returned to ready-for-issue (RFI) condition in accordance with (IAW) the

Original Equipment Manufacturer (OEM) minimum functional performance specifications. The

Contractor shall correct all deficiencies found in the evaluation. This shall include the replacement of missing or broken parts and the removal of any foreign matter or corrosion.

9. Work under this purchase order shall be performed at the Contractor’s facility. The Contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and repair the items listed in this purchase order at the firm-fixed prices listed in the schedule (or modification).

The Contractor shall perform all repairs IAW applicable OEM’s Component Maintenance Manuals

(CMMs), other repair specifications in lieu of an applicable CMM, and/or applicable test/acceptance criteria. Any deviations must be approved by the USCG.

10. The Contractor must have access to required CMMs, repair specifications, test/acceptance criteria and/or any other required data to ensure that all items are tested and repaired IAW the OEM’s current specifications and procedures. Original design or functional capabilities of the end item and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.

11. The Contractor must have access to all applicable documents and obtain current editions of all applicable documents. The USCG does not own nor can it provide the technical documents specified herein. The closing date for receipt of offers, order award, and/or delivery date will not be delayed pending receipt of these documents for any Contractor.

12. Parts of an item found to be in a serviceable condition as a result of functional testing shall be reused.

Missing parts and parts found to be defective or that require replacement by OEM instructions shall be replaced with parts meeting the OEM’s specifications and drawings or as otherwise authorized in writing by the Contracting Officer. Replacement parts shall be new and accompanied by traceability to the OEM. The cost for parts that are replaced systematically during repair shall be included in the price listed in the schedule for these operations.

13. If after visual and functional inspections, an item is determined to require minor or major repair, the

Contract shall submit a repair quotation for the repair to the Contracting Officer. The quotation shall be valid for thirty (30) days and shall include major repair price, a description of each discrepancy found, and the estimated turnaround time (TAT).

• Minor Repair: Includes calibration and minor repair accessories (such as direct connect cable replacement), as well as SBC repairs.

• Major Repair: Includes calibration and major repairs such as repairing the GPIO and TACAN boards.

14. The Contractor must receive a written modification signed by the Contracting Officer that authorizes repair prior to the commencement of work. Once the repair quotations are received, the Contracting

Officer will respond via a written modification within thirty (30) days as to whether the quotes are approved or declined. If approved, the Contractor will be given the quoted TAT (calculated from the date the modification is issued) to complete the repairs and return the items to the USCG. If a quote is declined, the contractor will be provide instructions regarding whether the items should be returned as -is or scrapped at the Contractor’s facility.

15. The USCG will provide disposition instructions (either to scrap the item at the Contractor’s facility or to return the item to ALC) for all items that are determined BER. The Contractor shall not dispose of an item until they have been notified by a written modification to the order. When returning the item to

ALC, the items shall be clearly marked as “BER” with the supporting evidence.

16. The USCG shall not be liable for any amount expended by the Contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the

Contracting Officer.

17. ALC considers items RFI upon acceptance. Items determined to be non-RFI upon installation or operation may be returned to the Contractor for correction at Contractor’s expense. Deficiencies will be described in a Product Quality Deficiency Report (PQDR) and sent to the Contractor prior to the return of any item.

File details come from the government source that posted it. Updated .