P/R 2123403Y6172M81003 GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to perform Exterior and Interior Preservations listed in Table 1 below. Work must be performed at USCG Yard 2401 Hawkins Point Road Baltimore Maryland 21226 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete all work iaw period of performance.

Work Scope Intent. This work scope describes the requirements for the Contractor to Blast, Remove/Dispose of Grit and Apply Protective Coatings to the areas listed below.

Coast Guard Drawings Coast Guard Drawing 70 CGB 0103-1, Rev 1, Outboard Profile and Deck Plans

Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

Table 1

TYPE OF STRUCTURE
Preservation

Method Standard Grit

Type Approximate Square Footage

U/W Hull Includes Spud Wells Freeboard Includes Spud Wells Construction Deck

Interior Areas

Fwd & Aft Rakes (Voids) Interior Areas Grit Blast

Grit Blast Grit Blast Power Tool Grit Blast

SSPC SP-10 MIL-A-

22262

SSPC SP-10 MIL-A-

22262

SSPC SP-10 MIL-A-

22262

SSPC SP-3 N/A

SSPC SP-10 MIL-A-

22262

2,000 sf 1,000 sf 2,250 sf

3,600 sf

1,650 sf

Frame 5
3 SF
Frame 6
1.5 SF
Frame 10
43 SF
Frame 10 at Longitude 5
3 SF
Frame 10-19
90 SF
Frame 22 at Longitude 4-5
8 SF
Frame 23
3.75 SF
Frame 23 Longitude 5 to 7
At needle buzz areas approx. 5 SF
Frame 23 Longitude 5
At (3) pad weld areas approx. 2.5 SF
Frame 23 Longitude 6
At (5) pad weld areas approx. 4.5 SF
Frame 23 Longitude 7
At (3) pad weld areas approx. 2.5 SF
K9S1- X-11 Pad weld (up to 3"x10") up to 2 areas of the bilge turn
(2) Pad weld areas of the bilge turn approx. 1 SF
Frame 10-26
At needle buzz areas approx. 10 SF
Frame 10-26
At (9) pad weld areas approx. 2.25 SF
Frame 26 at Longitude 6-7
24 SF
Frame 34 Area 1
160 SF
Frame 34 Area 2
96 SF
Frame 34 (Angle)
72 LF of 4 in. x3 in. x 5/16 in. angle
Frame 35
128 SF
Frame 35 between Longitude 3 and 4
3.75 SF
Frame 35 (angle)
72 LF of 4 in. x3 in. x 5/16 in. angle
Frame 35 to 55
Needle buzz areas at bilge turn approx. 20 SF
Frame 46
20 SF
Frame 46 at area of the bilge turn
15 SF
Frame 50-54
At needle buzz areas approx. 5 SF
Frame 50-54
At (2) pad weld areas approx. 1 SF
Frame 51
4.5 SF
1P1- X-11/13 Crop and renew a 2'x4'x5/16" area at L1 Longitude 1
8 SF
Transducer fairing and transducer mounting ring
Approx. 2 SF

K12P1-X11/13 Pad weld a 5"x10" area and grind smooth

At pad weld area approx. 0.5 SF

4P1- L3-L4
8 SF area of the roll plate
Fwd & Aft Rake compartments.
Approximately 1,650 sf
Port Outboard CL Frames 22-35
Overhead Weld Seam 70 SF
Centerline Frames 20-27
Overhead Weld Seam 25 SF
Starboard CL, FWD Frames 10-32
Overhead Weld Seam 111 SF
Starboard CL AFT Frames 34-35
Overhead Weld Seam 9 SF
Starboard Outboard, FWD Frames 20-32
Overhead Weld Seam 28 SF
Starboard Outboard, AFT Frames 34-35
Overhead Weld Seam 7 SF

All square foot calcalations are approximate and do not include t bars, stiffeners, foundations, brackets and etc.

U/W Hull Preservation Particulars:

Intent. This work item describes the requirements for the Contractor to preserve U/W body surfaces.

NOTES

1. The purpose of the preservation tasks covered by this item is to completely remove all existing coatings and recoat the U/W body surfaces with a new coating system.

2. U/W body surfaces are as defined in 4.1 (Definitions) and exclude areas covered by docking blocks, unless the vessel is fleeted for the express purpose of preserving blocked areas.

Pre-surface preparation wash. The Contractor shall accomplish low-pressure (less than 5,000 psi) fresh water wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Capture, contain, and dispose of wash water for proper disposal in accordance with all Federal, State and Local regulations.

Preservation requirements. The Contractor shall prepare and coat the U/W body, spud wells, and appendages as follows: Prepare and coat the U/W hull surfaces with the system specified for “Underwater (U/W) Body and Boot-Top (U/W Body and Boot-Top, Steel Hulls (Up to 7 Years), in Salt Water”, in SFLC STD SPEC 6310, Appendix A (Cutter and Boat Exterior Painting Systems). Ensure that the anticorrosive (AC) is tacky prior to applying the first antifouling (AF) top-coat. Ensure that the first AF coat is applied over the AC undercoating, while it is still tacky.

Protective measures. Inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

Perform solvent cleaning of all prepared surfaces, in accordance with SSPC-SP 1. Capture, contain, and dispose of all wastes from solvent cleaning, in accordance with all Federal, state and local regulations.

Draft mark painting. The Contractor must paint all draft marks with two coats of a “Polysiloxane” or “Silicone Alkyd Enamel” coating, at 2.0-3.0 mils DFT, white (17925).

In-process quality control. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces). Surfaces being preserved are considered “critical-coated surfaces”.

Grit Removal & Disposals. The Contractor will be required to remove and dispose of all spent grit and debris from the sandblasting process. The Contractor will have to select a disposal site that meets our Environmental Department, Federal, State and local requirements. No used blast media shall be disposed of on site. The Contractor shall endure all disposal costs of removals/disposals. The contractor must provide the Government a primary and secondary site for grit blast disposals.

Definitions:

U/W Body. The underwater body of the barge includes all exterior hull surfaces from the barge waterline, as shown on 70 CGB 0103-1, down, including spud wells, transducer hull rings, sea chest gratings, sea chests (including the sea chest inlet up to the final connection with the flange face at the sea chest isolation valve(s)), sea chest strainer plates, and grid/keel cooler recesses.

Freeboard Preservation Particulars.

Pre-surface preparation wash. The Contractor shall accomplish low-pressure (less than 5,000 psi) fresh water wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Capture, contain, and dispose of wash water for proper disposal in accordance with all Federal, state and local regulations.

Preservation requirements. Prepare and coat 100% of the freeboard surfaces as designated (Intent) with the system specified for “Freeboard/Superstructure/Mast (Freeboard/Superstructure)” in SFLC Std Spec 6310. Including draft markings. Select the following:

· Select “Option I” system, for the applicable metal substrate.

· Black (17038), as the top/finish coat color.

In-process quality control. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces). Surfaces being preserved are considered “critical-coated surfaces”.

Grit Removal & Disposals. The Contract will be required to remove and dispose of all spent grit and debris from the sandblasting process. The Contractor will have to select a disposal site that meets our Environmental Department, Federal, State and local requirements. No used blast media shall be disposed of on site. The Contractor shall endure all disposal costs of removals/disposals. The contractor shall provide the Government the primary and secondary site for grit blast disposals.

Definition:

Freeboard Surfaces. For the purposes of this item the freeboard is defined as exterior steel hull surfaces from the barge waterline, shown on Coast Guard Drawing 70 CGB 0103-1, up to the top of the Main Deck Level, including spud wells, and all lifeline stanchions.

Construction Deck Preservations:

Intent: This work item describes the requirements for the Contractor to preserve the Barge Buoy Deck (Construction Deck) surfaces, shown on Coast Guard Drawing 70 CGB 0103-1 (see Definitions).

Protective measures: The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). Specific areas/equipment/components to be protected include, but are not limited to:

Buoy crane.

Deck machinery.

Buoy handling equipment.

Deck fittings.

In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces). Surfaces being preserved are considered “critical-coated surfaces”.

Preservation requirements. The Contractor shall accomplish the following tasks:

Pre-surface preparation wash. Accomplish low-pressure (less than 5,000 psi) fresh water wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Capture, contain, and dispose of wash water for proper disposal in accordance with all Federal, state and local regulations.

Surface preparation. Prepare all designated deck surfaces (see 4.1 (Definition) by abrasive-blasting to SSPC-SP10/NACE No. 2, using grit conforming to MIL-A-22262 (1.5 to 2.5 mil anchor profile).

Surface coating. Coat all prepared surfaces with the coating system specified for “Weather Decks (Weather Deck, Buoy Tender Working Deck)”, in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems). Select a Gray (36231) inorganic zinc coating.

Grit Removal & Disposals. The Contract will be required to remove and dispose of all spent grit and debris from the sandblasting process. The Contractor will have to select a disposal site that meets our Environmental Department, Federal, State and local requirements. No used blast media shall be disposed of on site. The Contractor shall endure all disposal costs of removals/disposals. The contractor shall provide the Government the primary and secondary site for grit blast disposals.

Surface coating. Coat all prepared surfaces with the coating system specified for “Weather Decks (Weather Deck, Buoy Tender Working Deck)”, in SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems). Select a Gray (36231) inorganic zinc coating.

Painted markings as directed. Paint all remaining, non-decal visual identification markings, draft marks including hull numbers and vessel names in accordance with SFLC Std Spec 6310, as applicable.

Repair of un-intended damages. The Contractor shall repair all damages, including overspray, incurred to surfaces not covered by the scope of this work item, during surface preparation and paint application procedures.

Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

Definitions.

Barge Buoy Deck. The barge buoy deck is defined as horizontal deck surfaces from the fwd bulkhead of the barge shack forward, port and starboard (including buoy pen area), bitt and chock foundations, buttons, cleats, pad eyes, machinery rack guards and machinery foundations, hatches and hatch guards, cribbing post and stanchion sockets, cribbing posts, stanchions, vent pipes and goosenecks, angle coaming, crane pedestal, and approximately six inches up all adjacent vertical surfaces, as applicable.

Deck coaming. Coaming is defined as vertical raised sections of deck plating around an opening that provide a frame and/or deflect water, such as around a hatch or gooseneck.

Interior Preservation Particulars.

SCOPE

Intent. This work item describes the requirements for the Contractor to preserve various interior surfaces of the barge where structural repairs and renewals were performed. A combination of blasting and power tool preparations will be needed to achieve SFLC requirements. Areas Include various Bilge Spaces, Various Overhead Spaces and two Voids (Rakes). All areas will be shown during site visit.

Contractor must provide protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

General preservation requirements. The Contractor shall prepare and coat surfaces using the system specified for Interior Surfaces iaw Bulkheads and overheads, Uninsulated Steel-(Appearance not a factor, ie, Voids) and Insulated Steel.

Prepare Interior surfaces (excluding rakes) must meet SFLC Standard Spec. 6310 requirements for surface profile requirements. The use of SSPC SP-10, SSPC-11, and SSPC-3 options or a combination of those options maybe required to achieve preparations and profile standards.

Apply bilge coatings iaw SFLC Standard Spec. 6310 Appendix B using Option 1 of Bilges, Cofferdams and Forepeaks, Steel.

Apply coatings to side shells, bulkheads, overheads, hatches and disturbed areas iaw SFLC Standard Spec. 6310 Appendix B using Option 1 of Bulkheads, and Overheads, Uninsulated Steel.

Prepare and coat all interior void (Rake) surfaces (including internal surfaces of manhole cover(s), manhole cover hull ring(s) extending outward to the weld line that ties the hull ring into the tank plating on the tank exterior) using the system specified for " Tanks and Voids, General; Option I " in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). Select finish/top coat color to match existing.

Grit Removal & Disposals. The Contract will be required to remove and dispose of all spent grit and debris from the sandblasting process. The Contractor will have to select a disposal site that meets our Environmental Department, Federal, State and local requirements. No used blast media shall be disposed of on site. The Contractor shall endure all disposal costs of removals/disposals. The contractor shall provide the Government the primary and secondary site for grit blast disposals.

General preservation requirements. The Contractor shall prepare and coat surfaces using the system specified for Interior Surfaces iaw Bulkheads and overheads, Uninsulated Steel-(Appearance not a factor, ie, Voids) and Insulated Steel.

In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”). Surfaces being preserved are considered “critical-coated surfaces.”

NOTES

Definition of Interior Space: Various interior areas of the Interior Overhead, Bilges, Voids, and Rakes where structural repairs were performed.

REQUIREMENTS

Site Visit: A site visit will be required before submitting bid. This will ensure all bidding contractors know the layout of work areas and surfaces to be preserved.

Tech Rep. Contractor must have NACE Level II Paint Inspector at job site for entire schedule period to perform the following but not limited to: environmental readings, surface profile readings, surface cleanliness inspections, surface preparations and application of coatings. NACE inspector must complete all SSPC QP-1 forms and QA inspection forms (QA-1 thru QA-5) that are applicable.

Certifications: Contractor must have current SSPC QP-1 Certification.

In process quality control measures. The Contractor shall abide by all the safety and quality control requirements specified in SFLC Std Spec 0000.

SHAPE \* MERGEFORMAT

Containment: The Contractor shall maintain containment to capture 100% of dust and other solids during the performance of work. During the performance of work, if containment is breached in any manner it shall be reestablished immediately. If the containment cannot be fully reestablished immediately work shall be halted at no cost to the government, until the containment is reestablished. Inspection of the containment shall be conducted by the Contractor as an ongoing process before, during and after preparations phase to ensure its integrity. The Coast Guard Yard has a discharge permit from the State of Maryland that does not allow any dust, paint chips, overspray or other materials to be discharged to the waters of the State. In the event the Contractor creates an unsafe work environment and will cause yard work operations to cease, the Contractor will be held responsible and damages shall be assessed for the length of the work delay. If any material is found to be outside the containment area, the Ship Superintendent must be notified immediately. The Ship Superintendent shall then notify the Coast Guard Yard Facilities Management, Environmental Branch. The Contractor will be held solely liable for any fines imposed upon the Yard due to Contractor violations of the Yards National Pollution Discharge Elimination System (NPDES) discharge or other permits. A containment plan shall be provided to the Government with the proposal Inspection. After surface preparation the Contractor shall allow CG Yard to visually inspect all surfaces; including, but not limited to hull plating, bulkheads, decks and overhead plating, structural members, fasteners and gasket seating surfaces.

General Information

Place of Performance: The work to be performed will be at the US Coast Guard Yard, 2401 Hawkins Point Road Baltimore MD 21226 East Wall Pier.

Period of Performance: The on or about start date is May 24th 2023 and to be completed in 30 days.

Security Requirements: The U.S. Coast Guard Yard, Baltimore, MD is a controlled access area. All contractors and subcontractors performing work on this contract shall utilize the RAPIDGate program. RapidGate manages the non-Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard, Baltimore. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard yard and logical access to a DoD or DHS network or system.

All personnel shall receive visitor’s passes and clearance from USCG Coast Guard Yard Security located at the Main Gate. List of personnel needing access shall be provided to the COR twenty-four (24) hours prior to requiring access. Personnel will be required to provide full name, picture I.D. (valid driver’s license preferred), and date of birth. For non US citizen’s, a passport will be required. The following forms of IDS are authorized:

CAC

Foreign Passport containing appropriate visas

· TWIC

Green Cards

· Passport MOST state IDs The following state ID will not be accepted

· Maine

- Missouri*

· Minnesota

- Washington*

· Montana *- Enhanced Drives Licenses (EDL) from Missouri and Washington will be accepted.

Contractor employees shall not enter restricted areas in accordance with U.S. Coast Guard Yard security regulations or policies. Before Contractor employees can work at the U.S. Coast Guard Yard Facility, the Contractor shall complete a security investigation on all Contractor employees in connection to this contract. Any Contractor employee with a criminal background shall get prior authorization before they can gain access to U.S. Coast Guard Yard Facility. Contractor shall provide for each employee to the Contracting Officer, the full name and any alias, address, city and state, and date of birth Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use.

Reporting Requirements: Contractor personnel shall report to an appropriate authority (Contacting Officer, Ship Superintendent) any information or circumstances of which they are aware may pose a threat to the security of U.S. Coast Guard personnel, Contractor personnel, resources, and classified or unclassified defense information. The Contractor shall not substitute employee(s) without prior notification to the Contracting Officer and Ship Superintendent. Contractor employees shall receive a full safety briefing by their immediate supervisor upon initial on-base assignment of all known hazards in areas that work shall be performed.

Occupational Safety and Health Standards: The Contractor shall be required to follow 29 CFR 1915 (OSHA Shipyard Industry Standard), 16 CFR1303, 29 CFR 1910, 29 CFR 1915.1025, 29 CFR 1926.62, 15 U.S.C. 2601, while performing this work at the U.S. Coast Guard Yard. The Contractor shall provide all required personnel safety equipment for their employees, such as, but not limited to; safety helmet, safety glasses with side shields. All safety equipment shall meet OSHA standards. Failure of the Contractor employees to comply with the above requirements could result in a shutdown of operations.

Emergency Services The U.S. Coast Guard Yard has 24 hour first aid, spill response and fire protection available. If necessary, the Contractor may call 410-636-3993 from non-Yard phones and extension 3000 from Yard phones for emergency situations. The U.S. Coast Guard Yard will provide emergency first aid only. Injuries shall be reported immediately and followed up with a written report to the COR.

ISO Qualifications: Contractor shall comply with all the U.S. Coast Guard Yard International Organization for Standardization (ISO) 9001 Quality Management and ISO 14001 Environmental Management Systems certifications. The Contractor may be periodically audited to ensure conformity to these certifications and standards. In the event the Contractor creates an unsafe work environment and causes the U.S. Coast Guard Yard work operations to cease, the Contractor shall be held responsible and damages shall be assessed for the length of the work delay.

The Contractor shall provide a Supervisor who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the Supervisor is absent shall be designated in writing to the Contracting Officer. The Supervisor or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Supervisor or alternate shall be available between 7:00 a.m. to 4:30 p.m., Monday thru Friday except when the Government facility is closed for administrative reasons.

Supervisor and Alternate Supervisor: The Supervisor and Alternate Supervisor shall have at a minimum two (2) years of documented experience supervising the application of marine protective coatings , and two (2) years experience performing preparations of ships structures. The ability and experience of the above personnel shall be provided to the Government with the proposal in the form of a resume detailing qualifications such as experience and training.

Workers: Workers shall have a minimum two (2) years documented performing preparations and the applications of protective coating services. The ability and experience of the above personnel shall be provided to the Government with the proposal in the form of a resume detailing qualifications such as experience and training.

Coordination with Ship Superintendent: The Contractor shall coordinate all work requirements, stated herein, with the Ship Superintendent, the Ship Superintendent will communicate with the Supervisor to ensure adherence with the SOW. There may be occasions in which the U.S. Coast Guard Yard will request the Contractor to cease work or move to a different location on the vessel due to U.S. Coast Guard Yard production requirements.

Damage to Government Property: The Contractor shall be held liable for any damage to Government property caused by the Contractor. The Contractor shall provide protective coverings on all vulnerable equipment and surfaces. It shall be the responsibility of the Contractor to ensure that the covering is adequate. Any concerns as to the adequacy of the coverings shall be brought to the attention of the COR. The Contractor shall inspect the area before work commences and may request a technical inspection from the COR, however such an inspection does not relieve the Contractor from responsibility for damage.

Government Furnished Equipment:

The following is a list of property, equipment and services which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

Services: The Government shall provide material handling services to load and unload Contractor machinery and for the setup of equipment. The Coast Guard Yard shall endeavor to provide timely assistance as requested by the Contractor. The Contractor shall provide 24 hour notice to the Government of the need for material handling services. However, there may be occasions where Yard work must take precedence. These occurrences will be managed as they occur.

Utilities: The Government will provide water, compressed air, and electricity for the contractor as defined herein. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

Compressed Air: The Government shall provide a source of compressed air for contractor machinery. The contractor shall be responsible for ensuring that their compressed air hookup connections are compatible with the Yard’s compressed air sources. This compressed air is not safe for breathing apparatus’s.

Electricity: The Government shall provide up to 200 amps and up to 480 volts of electrical services for hookups. The contractor shall be responsible for ensuring that their electrical hookup connections are compatible with the Yard’s electrical sources and connections.

Equipment: The Government will provide staging and scaffolding in those areas that are determined not to be accessible by manlift. The contractor shall provide proof of manlift training for employees required to operate manlifts.

Materials: The Government will provide all blast grit and protective coatings.

Contractor Provided Equipment and Materials: The Contractor must provide the following but not limited to personal protective equipment, filters for breathing apparatus’s, blasting equipment, dust collectors, vacuums, manlifts, boomlifts, brushes, rollers, spray equipment, hoses, heating, coveralls, gloves, disposable suits, safety equipment and lighting.

General: The Contractor shall furnish all equipment and services required to perform work under this contract, other than those explicitly address in the SOW.

The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed task order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the time period and quantity specified.

Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning equipment and tools to complete assigned work. The following tools and equipment are required:

a. Tools and equipment including, but not limited to, all basic hand and power tools commonly used in the trade, for example, Pneumatic sanders, needle guns and scaling guns.

b. Equipment including, but not limited to hoses, blowers, dust collectors and hoses, vacuums, heaters and tarps.

c. Provide all standard Personal Protection Equipment (PPE) in accordance with Occupational Safety and Health Administration (OSHA) Standard, hard hats, safety glasses, face shields, steel-toed shoes, ear plugs, fall protection equipment, blasting hoods, flash lights, gloves and respirators including cartridges, and Tyvex suits.

DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is ENS Trang 857-338--6432. Inquiries concerning any phase of the specification before or after award shall be made to ENS Trang.

CONDITIONS AFFECTING THE WORK: The offeror must visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of the intended start date. The work shall be done in accordance with the specification.

ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modifies or otherwise affect the terms of this contract.

WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the unit’s regular hours, must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative to arrange for inspection/acceptance of work.

IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES:

All contractors and subcontractors performing work onboard the Coast Guard Yard shall utilize the RAPIDGate Program (www.rapidgate.com) if repeat access to the CG Yard is required for seven (7) or more days annually. RAPIDGate manages the non-Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard, Baltimore. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard Yard AND logical access to a DoD or DHS network or system.

Costs incurred for delays at the gate due to the contractor’s failure to comply with this requirement or to provide qualified, authorized personnel will not be reimbursed by the Government. Additionally, consideration may be negotiated for performance delays caused by the contractor’s failure to comply with RAPIDGate requirements, or for delays caused by the disqualification of contractor employees.

Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

SAFETY REQUIREMENTS:

a.

Responsibilities:

(1) All contractors working on CG Yard shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Office prior to starting work.

(2) Written notification must be provided to the YARD Safety Officer, in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

(3) Copies of the following must be provided to the YARD Safety Office prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit.

(4) Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor. A representative from CG YARD is required for all contractor Lock Out/Tag Out needs.

b. Rights:

1. Every employee working on the CG Yard has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on CG Yard shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist prior to starting work and must be in accordance with the Unit Environmental Guide.

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Derrick Josey 410-636-7070. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d All spent sand blast grit and debris must be disposed of at a landfill or disposal site that is certified by the State of Maryland for such disposals. Name and location must be approved by CG Yard Environmental Branch.

Photos:

Unacceptable Nightly Condition

· Left equipment hoses inside the enclosure

· Height of piles greater than 2 inches

· Exceeded the 5% daily allowable grit remaining

Required Final:

Unacceptable Final:

Unacceptable final condition (not broom swept condition), this is showing how the grit accumulates.

QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Standard specification 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (Frame References)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils

Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):

_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15

DATE
TEST LOCATIONS
CONDUCTIVITY

(micro siemens/cm)

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT
1
2
3
4
5

Overall Avg. DFT

ADJUSTMENTS

Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

SPOT
1
2
3
4
5

ADJUSTMENTS

Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

SPOT
1
2
3
4
5

ADJUSTMENTS

Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

Power Tool

Power Tool

Power Tool

SSPC SP-3

SSPC SP-3

SSPC SP-3

1,900

1,400

2,000

NOTE

Surfaces being preserved are considered “critical-coated surfaces”.