Statement of Work (SOW) dated 26 May 2023.pdf

PDF 135 KB Posted

Attached to
FB2540i UV LED Flatbed Printer Federal contract opportunity
Solicitation number
FA860124Q0040
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This statement of work outlines requirements for a flatbed printer to be installed at the National Museum of the United States Air Force. The printer must be an AGFA Anapurna Model FB2540i LED True Flat Bed UV Printer or equal, with compatible software, color management, and registration pins. Installation and training services are also required, with delivery within 60 days of award. Commercial vehicles delivering the printer must undergo inspection at Gate 16A on Wright Patterson Air Force Base according to the procedures outlined. The related pre-solicitation notice seeks a replacement flatbed printer to print signs, banners, and displays for the museum's Presidential and Space Galleries. Responses are due no later than February 5, 2024 and shall be submitted to the National Museum of the United States Air Force at Wright Patterson Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to FB2540i UV LED Flatbed Printer, newest first.
File Type Posted
Sources Sought Instructions.pdf PDF
SS-0040 Flatbed Printer.pdf PDF
SS-0040 Sources Sought Instructions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

National Museum of the United States Air Force

Flat Bed Printer

26 May 2023

OBJECTIVE

The NMUSAF requires a flat bed printer capapble of significant production and the ability to print on numerous surfaces IAW this Statement of Work.

1.0 GENERAL

The contractor shall provide a printer BRAND NAME OR EQUAL to the following:

a. AGFA Anapurna Model FB2540i LED True Flat Bed UV Printer

b. Software equal to Smart Asanti Workflow software

c. Color Management better than or equal to the X-rite i1 Publish Pro.

d. Comptaible with Fiery software system

e. Rectractable registration pin

f. Minimum of 6 vacuum zones.

g. Warranty of at least of an additional 36 months beyond standard warranty

h. Full turn-key installation including all shipping and setup with 4 days of on-site workflow/color training immediately after installation

i. One additional day of follow-up training approximately 45 days after installation.

2.0 DELIVERY

a. Delivery FOB within 60 days of contract award.

b. The printer shall be delivered to:

Exact address to be determined

WPAFB, OH 45433

3.0 DELIVERY PROCEDURES COMMERCIAL VEHICLES

All vehicles larger than a large pick-up truck are required to be inspected by the Wright- Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation. Vehicles to be inspected include, but are not limited to, the following:

1. Step van/panel truck

2. Tractor/trailer, box, and flatbed containing cargo

3. Tanker trucks

4. Box Trucks

5. Tour buses

6. Garbage/recycled waste trucks

7. Concrete trucks/mixers, dump trucks

8. Cranes, recreational vehicles, petroleum tanker

This inspection will be conducted at Gate 16A located off State Route 444.

The following are exceptions to vehicles utilizing the CVDG:

1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.

2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.

3. Wright Patterson Integrated Defense Plan, paragraph 3.10.12.9.2. All irregular deliveries will be sent to the CVDG for inspection. All visitors, which include contractors and commercial vendors without proper background checks and contractor passes, will not be allowed on WPAFB unless escorted by the receiving agency. This will take place after the individual(s) are issued a pre-clearance form at the CVDG. After successful completion of the vehicle inspection, the receiving agency will escort the individual to and from their destination on WPAFB. An inspector at the CVDG will contact the receiving agency, informing them to send an escort to the CVDG. Escorts will remain with the vehicle at all times while it is on WPAFB.

4. Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM). Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.

Statement of Work (SOW)

File details come from the government source that posted it. Updated .