STATEMENT OF WORK_SHRIKE_FIRE SUPPRESSION.docx
DOCX document 29 KB Posted
- Solicitation number
- 52000QR240002299
About this file
This solicitation seeks proposals for inspection and certification of fixed fire suppression systems and hydrostatic testing of CO2 bottles aboard the USCGC Shrike. The contractor shall perform inspections in accordance with maintenance procedure cards N10047.0 and N33005.D from 12-23 February 2024 at the cutter's homeport in St. Petersburg, Florida. The government reserves the right to witness repairs and requires notification upon completion for testing. Proposals are due by 7 February 2023 and shall include pricing, payment terms, and company registration information. Award will be made based on best value considering specification conformity, price, and past performance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
USCGC SHRIKE (WPB 87342)
Semiannual Fixed Fire Suppression Systems, Hydrostatic Test CO2 Cylinders Inspection/Certification
1.0 INTRODUCTION
The USCGC SHRIKE requires contractors to conduct semi-annual Inspection and Certification of CO2 Fixed Fire Suppression Systems & Hydrostatic test CO2 bottles.
2.0 REFERENCES
Coast Guard Publications Naval Ships Technical Manual 555, Volume 1, Surface Fire Fighting Technical Publication 4571-555-A, CO2 Fire Suppression System (Engine Room) Technical Publication 4599A, Cutter Information Book Other References Maintenance Procedure Card (MPC) N10047.0 Maintenance Procedure Card (MPC) N33005.D
3.0 SCOPE OF WORK- The work is to be accomplished through the following task.
3.1. Contractor shall perform inspection and certification of the CO2 Fixed Fire suppression systems in accordance with (IAW) the following Maintenance Procedure Cards (MPC) N10047.0 and N33005.D
4.0 PERIOD OF PERFORMANCE
4.1. The Contractor shall coordinate services with cutter’s Point of Contact (POC). Period of Performance (POP) shall be 12-23 FEB 2024 and conclude by close of business (COB) on 23FEB2024
5.0 Place of Perfomance
USCGC SHRIKE
600 8TH AVE SE
ST. Petersburg, FL 33701 POC: MKC Kyle Brewer, EPO 813-327-2206
5.1. The Unit shall schedule a service date and be available to receive contracted services.
6.0 ACCEPTANCE CRITERIA
6.1. The government reserves the right to witness the contract repairs. The service provider shall keep the units EPO, fully informed of servicing plans so that he may arrange to be present when work is being performed.
6.2. When the work is complete, the vendor shall notify the unit’s EPO for a final operational test.
7.0 QUALITY ASSURANCE
7.1. The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure that services are performed in accordance with the terms of this Statement of Work (SOW), and in accordance with manufacturer’s guidance and procedures. The QCP is the means which the vendor assures all work complies with the terms of awarded contract. It identifies, prevents, and ensures non-occurrence of defective services.
8.0 NOTES
8.1. All associated HAZMAT shall be handled safely and disposed of properly IAW state and federal law.
File details come from the government source that posted it. Updated .