This is a Statement of Work for a limestone delivery and road maintenance project at Sam D. Hamilton Noxubee National Wildlife Refuge in Mississippi. The contractor must deliver and spread approximately 2,875 tons of #610 crushed limestone (Crush N Run) on Section Line Road, located approximately 12 miles south of Starkville, MS. The material must be delivered at a minimum rate of 10 to 12 truck-loads per day and tail-gate spread to an approximate depth of 4 inches across the designated road section. The U.S. Fish and Wildlife Service will provide on-site project management and equipment to assist with finishing the material spreading operations. All materials must be delivered by October 30, 2026, to the Sam D. Hamilton Noxubee National Wildlife Refuge at 13723 Bluff Lake Road, Brooksville, MS 39739.

The solicitation number is 140FS326Q0100, issued by the Department of the Interior Fish and Wildlife Service. This is a standard procurement solicitation for commercial limestone supply and delivery services with specific performance requirements regarding delivery schedule and material application specifications.

View the file

Other files for this federal contract opportunity

Other files attached to MS-NOXUBEE NWR-CRUSH-IN-RUN LIMESTONE, newest first.
File Type Posted
Sol_140FS326Q0100.pdf PDF
Past_Performance_Survey.docx DOCX document
Section_Line_Road_Map.jpg JPG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work:

Contractor will provide approximately 2,875 tons of #610 crushed limestone (Crush N Run) delivered to Section Line Road on the Sam D. Hamilton Noxubee National Wildlife Refuge which is located approximately 12 miles south of Starkville, MS. The Contractor must provide a minimum of 10 to 12 truck-loads of limestone per day and the material will be tail-gate spread to an approximately depth of 4 inches on Section Line Road (see map). The Service will have a project manager on site and equipment to finish spreading the material. Materials will need to be delivered by 10/30/2026.

Sam D. Hamilton Noxubee NWR 13723 Bluff Lake Road Brooksville, MS 39739