Statement of Work - RV Murrelet and RV Siliqua Repairs.pdf

PDF 1 MB Posted

Attached to
Hull Repairs to NOAA R/V Murrelet and NOAA R/V Siliqua
Solicitation number
1305M325Q0188
Issued by

About this file

This Statement of Work details hull repair specifications for two NOAA research vessels, R/V Murrelet (F4103) and R/V Siliqua (F4101), which are 41' ex-USCG Utility Boats requiring extensive corrosion repairs. The work must be performed in the Lower Columbia River Region within 200 miles of Astoria, Oregon, preferably at the NOAA facility in Hammond, Oregon, with completion required by September 1, 2025, and strongly preferred by August 1, 2025.

The scope of work includes removing and replacing hull plating sections, renewing struts with doubler plates, performing optical alignment inspections, conducting liquid-penetrant and pressure tests, restoring coating systems, and ensuring compliance with American Bureau of Shipping, American Welding Society, and U.S. Code of Federal Regulations standards. Specific repair requirements for each vessel include cropping out and renewing aluminum hull plating sections, replacing struts and bearings, and performing comprehensive welding and painting procedures. Prospective contractors are encouraged to inspect the vessels and must follow detailed specifications for welding, protective coverings, waste disposal, and painting.

View the file

Other files

File Type Posted
Sol_1305M325Q0188_Amd_0001.pdf PDF
Sol_1305M325Q0188.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work and Specifications for Hull Repairs to NOAA R/V

Murrelet (F4103) and R/V Siliqua (F4101) Requisition 143041-25-0005

Background:

The NOAA Fisheries Service in Hammond, Oregon operates NOAA R/V Murrelet (F4103) and NOAA R/V Siliqua (F4101). These are 41’ ex-USCG Utility Boats. The vessels have numerous deep pits in the interior and exterior hull and struts caused by corrosion. These areas and struts require replacement prior to the vessel going back into service March 01, 2026.

Prospective Contractors are strongly encouraged to inspect the vessel to understand the entirety of the work being requested. The vessels may be available for inspection in Hammond, Oregon. Access is by appointment only, please contact Brian Fite (503.994.5062) for arrangements.

Place and Period of Performance:

To accommodate regular inspections by NOAA personnel based in Astoria, Oregon and address vessel transportation logistics, the work must be performed in the Lower Columbia River Region, within 200 miles of Astoria, Oregon. The preferred worksite is the NOAA facility at 200 Lake Drive, Hammond, Oregon, though an alternate facility may be considered. Due to height restrictions, the vessel will be transported via waterway only, and the contractor will be responsible for any transportation required from the waterway to the alternate facility. Work is to be completed within the agreed timeline, and not later than 01 September 2025. Completion prior to 01 August 2025 is strongly preferred.

Delivery is contingent on safe weather conditions as determined by NOAA personnel.

200 Lake Drive Hammond, OR 97121

References:

All work must be performed in compliance with the following standards:

a. American Bureau of Shipping (ABS), Rules for Materials and Welding most recent addition – Aluminum and FRP.

b. American Bureau of Shipping (ABS), most recent addition, Guide for Nondestructive Inspection of Hull Welds.

c. American Welding Society (AWS), most recent addition, Guide for Aluminum Hull Welding

d. U. S. Code of Federal Regulations Subchapter T.

e. NOAA Small Boat Program Specifications and Guidelines (see contacts for information).

Work Items R/V Murrelet:

1. Remove any interferences and crop out sections of the box skeg as required to gain access to hull plating listed below. Note: The box skeg may have been internally flow-coated with a corrosion inhibitor. See Welding and Allied Processes for specific requirements for working in this area.

2. Crop out and renew approximately 60” X 144” section of 5/16” 5086 aluminum hull plating.

This section spans the keel and extends athwartships to the chine on each side, and fore-aft from 4” aft of FR 11 to the stern.

3. Remove, construct and install new Struts and ⅜” doubler plate ensuring proper alignment, including replacing stern tube bearings and strut bearings. Confirm strut alignment using Optical Scope Alignment or other industry standard procedure. The alignment inspections shall be witnessed by the NOAA personnel. Blueprints for struts provided by NOAA.

4. Renew cropped out section of skeg with .25” 5086 aluminum plate. Welding procedure shall be completed in accordance with references listed above for single sided welding.

5. Perform a liquid-penetrant inspection of the root pass and final pass of all welds and filler welds in watertight boundaries, including bulkheads, shell plate, and frames, at or below the main deck level. The inspections shall be witnessed by the NOAA personnel.

6. A pressure test of the skeg and strut shall be performed and witnessed by the selected contractor prior to any work. Pressure test skeg and strut upon completion of repairs via the existing test fitting. Skeg shall maintain 2 psig of air pressure for a minimum of 10 minutes. There shall be no pressure drop during that time period. Repair all deficiencies and retest until correct. The Contractor shall use a regulator and gauge to conduct the test which shall be calibrated to the proper scale and range to accurately measure the 2 psig air pressure. To prevent over pressurizing the skeg, the test rig shall incorporate a safety relief valve set at no more than 4 psig. The inspections shall be witnessed by the NOAA personnel.

7. Restore all existing coating systems which are affected during performance of work. See Painting for specific requirements.

8. Restore any interferences previously removed.

9. A final shaft alignment shall be performed by contractor within manufactures tolerance and witnessed by NOAA personnel to confirm no additional vibration from the above work.

Work Items R/V Siliqua:

1. Remove any interferences and crop out sections of the box skeg as required to gain access to hull plating listed below. Note: The box skeg may have been internally flow-coated with a corrosion inhibitor. See Welding and Allied Processes for specific requirements for working in this area.

2. Crop out and renew approximately 120” X 30” section of hull plating. This section spans the keel and extends athwartships to the second stringer, and fore-aft from 3” aft of fuel tank bulkhead to the stern. Replace 30”x10” section fuel tank hull plating and tie in existing stingers and associated structures. Lazarette plating is 5/16” 5086 aluminum, fuel tank is ¼” 5086 Aluminum.

3. Renew cropped out section of skeg with 1/4” 5086 aluminum plate. Welding procedure shall be completed in accordance with references listed above for single sided welding.

4. Perform a liquid-penetrant inspection of the root pass and final pass of all welds and filler welds in watertight boundaries, including bulkheads, shell plate, and frames, at or below the main deck level. The inspections shall be witnessed by the NOAA personnel.

5. A pressure test of the skeg shall be performed and witnessed by the selected contractor prior to any work. Pressure test skeg upon completion of repairs via the existing test fitting. Skeg shall maintain 2 psig of air pressure for a minimum of 10 minutes. There shall be no pressure drop during that time period. Repair all deficiencies and retest until correct. The Contractor shall use a regulator and gauge to conduct the test which shall be calibrated to the proper scale and range to accurately measure the 2 psig air pressure. To prevent over pressurizing the skeg and fuel tank, the test rig shall incorporate a safety relief valve set at no more than 4 psig. The inspections shall be witnessed by the NOAA personnel.

6. Restore any interferences previously removed.

7. Restore all existing coating systems which are affected during performance of work. See Painting for specific requirements.

8. A final shaft alignment shall be performed by contractor within manufactures tolerance and witnessed by NOAA personnel to confirm no additional vibration from the above work.

Specifications:

1. General Requirements.

a. Contractor Submittals. No less than five (5) business days prior to the start of work, the Contractor shall submit the following in writing to the COTR:

1) List of Subcontractors

2) List of Qualified Welders, including name, type of qualification, and date of last qualification test.

3) List of Key Personnel

4) List of Emergency Phone Numbers

5) Certificate of Insurance

b. Condition Found Reports (CFR). The COTR must be notified in writing of any conditions found which may impact the performance of the work or administration of the contract, including a detailed description of the condition and any proposed or requested solutions. No changes to the statement of work are authorized without written approval from NOAA.

c. Vessel Access. NOAA personnel shall be granted access to the vessel during working hours for the purposes of inspecting and evaluating the work tasks. The Contractor is responsible for securing the vessel cabin against unauthorized access outside of working hours

d. Government Furnished Material/Equipment/Services. The government will make the vessel available at the agreed place and time. The government shall not furnish any other materials, services, equipment, labor, to fulfill this contract, except as otherwise indicated.

e. Contractor Furnished Material/Equipment/Services. The Contractor shall provide all materials, services, equipment, labor, and facilities necessary to perform the work specified.

f. Smoking. Smoking aboard the vessel is prohibited.

g. Approval for Welding. Due to the presence of sensitive electronics onboard, WELDING SHALL NOT PROCEED until a NOAA field technician has made the equipment safe for welding and approval to proceed has been granted by the COTR or a designated NOAA representative.

h. Quality Control. Quality assurance is the sole responsibility of the Contractor. The COTR may delegate inspection responsibilities to designated NOAA personnel. The designated NOAA inspectors monitor the progress of work done by the Contractor. If, during the performance of work the NOAA Inspectors witness work that fails to meet the specifications, work that is otherwise unsatisfactory, or conditions which may lead to an unsatisfactory end product, the inspectors will alert the COTR who will advise the Contractor of the deficiency.

i. Interferences. The Contractor shall remove all interferences and obstructions necessary to complete the required work without regard to whether interferences are indicated under specification work items. This may include the removal of machinery, piping, ducts, wiring, insulation, structure and anything else which interferes with the proper accomplishment of a work item. While awaiting reinstallation and restoration, the Contractor shall maintain and protect interferences. Unless otherwise authorized by NOAA, upon completion of required work the Contractor shall reinstall/restore interferences to their original configuration and condition.

j. Damages. Any damages caused by the Contractor in performance of this contract shall be repaired at the Contractors expense.

k. Compliance. All work must be performed in strict compliance with Federal, State, and Local laws and regulations.

2. Welding and Allied Processes.

a. All welding, brazing, and allied processes shall be done in accordance with the requirements and recommendations of the Standard appropriate to the type of weld being placed. See References.

b. All welding is to be performed by a USCG, or American Bureau of Shipping (ABS), or American Welding Society (AWS) welder who is currently certified for the type of work to be performed.

Prior to performance of the contract the Contractor shall provide proof of certifications.

c. When welding on equipment the return ground cable to the welding machine shall be connected in the immediate vicinity (as close as practical) of the work to ensure that current does not flow to sensitive vessel equipment. Government will remove or disconnect from electrical circuits all equipment which is not to be put at risk.

d. The Contractor shall certify that a safe atmosphere exists in and about a compartment before starting any work which may produce the heat of ignition, sparks, or flames.

e. The Contractor is responsible for providing suitable and adequate fire extinguishing equipment readily accessible to the work area. The Contractor is responsible for maintaining a continuous fire watch during cutting and welding operations and the fire watch shall be maintained for at least 30 minutes after completion of welding or cutting operations to detect and extinguish possible smoldering fires.

f. Contractor shall take all necessary precautions against fire or other damage when cutting and welding in or adjacent to areas containing flammable liquids, coatings, or materials.

g. The box skeg may be internally flow-coated with a petroleum-based corrosion inhibitor which is flammable. Cutting on or within the box skeg shall be performed by mechanical means only, to reduce the risk of igniting the flow-coat. Prior to performing welding on or within the box skeg the flow-coat shall be removed by high pressure hot water spray in all accessible heat affected areas, and the skeg drained of all waste water generated. The waste water from this process may contain hazardous materials or pollutants. The Contractor is solely responsible for the proper containment, management, and disposal of all waste water and/or hazardous materials.

h. The Contractor is responsible for providing and installing any tarps, coverings, enclosures, or other shelter which may be necessary for proper performance of the work.

3. Structural Access Openings.

a. The Contractor may, with prior approval, cut access openings in boat structure if required to perform work. Such openings shall be limited to those which are essential or already open for access to otherwise inaccessible areas or which greatly improve accessibility for removals, installations, or repairs.

b. Prior to making any additional access opening in the vessel structure, the Contractor must consult with the NOAA representative to discuss the proposed opening and show the location and dimensions of the proposed access cut on a rough sketch. Sketch shall include adjacent framing members, nearby penetrations, and scantlings of the structure. Radius corners shall be used at all corners to facilitate reinstallation. A description of the proposed restoration configuration, with material and welding details, and a narrative justification for cutting the opening shall be provided. The Contractor shall proceed with the access cut only after NOAA approval.

4. Protective Coverings.

a. Prior to starting work on interior spaces, protect the decks and deck coverings of spaces in which contract work is to be performed and spaces through which workers will traverse by covering the decks and deck coverings with temporarily fitted heavy plastic, cardboard, plywood or particle board.

b. Protect all compartments, machinery, equipment, furnishings, vent terminals, insulation, glass, cables, piping systems, coatings, structures, and other boat components from damage and from entry of dust, dirt, grit, sand, and other foreign particles. Methods of protection include, but are not limited to fire-retardant blankets (if required due to sparks or slag), canvas, or plastic coverings.

c. Any protective coverings which are damaged during the course of work shall be immediately repaired or renewed by the Contractor.

d. Any damage or contamination resulting from failure to provide adequate protection shall be corrected at the Contractor’s expense.

e. After completion of all other work, remove and dispose of all protective coverings and waste materials.

5. Clean-up, Control and Disposal of Wastes

a. Upon completion of work the Contractor shall clean-up and remove from the vessel all dust, dirt, debris, scrap, and other materials incidental to the work performed.

b. All non-hazardous wastes and demolished materials become the Contractor’s property and shall be removed from the job site at the Contractors expense.

c. All hazardous wastes generated by work under this contract are considered to be generated by the Contractor. As the generator the Contractor is solely responsible for containment, management, clean-up, transportation, and proper disposal of said hazardous waste at the Contractors expense.

Likewise, the Contractor is solely responsible for any spill response, containment, cleanup and disposal resulting from contract related spills.

6. Onboard Storage. The vessels cabin and forepeak compartments may be used for storage by the Contractor for tools and non-hazardous materials. Contractor may not store paint, primer, solvents, or any other flammable or hazardous materials aboard the vessel.

7. Painting.

a. Contractor shall restore all existing coating systems which are affected during performance of work. All burned or scarred areas, new structure, or plating resulting from any work performed by the Contractor shall be cleaned and repainted in accordance with this specification. The NOAA Inspector will inspect surface preparation prior to painting to assure conformance with specifications. Re-preparation due to oxidation bloom shall be the responsibility of the Contractor at no charge to the Government.

b. All aluminum installed under this contract shall, prior to installation, be free of corrosion.

c. All preparation, cleaning, and painting is to be conducted in strict compliance with the coating manufacturer’s specifications, especially pertaining to recoat and cure times, surface preparation, and environmental conditions of application. The coating manufacturer’s specifications are hereby incorporated by reference.

d. Bottom paint shall be Pettit Hydrocoat ECO (Black) antifouling. Primer shall be Amercoat 235.

e. Bare metal: Blast or abrade to coating manufacturers specifications. Clean and immediately apply the first coat of primer. Primer shall be three coats, alternating color-grey-black-grey.

Apply Pettit Hydrocoat eco, two coats. Primer and bottom paint shall be applied as per manufacturer's specifications.

f. Existing bottom paint: Feather to blend edges with bare areas and expose existing good primer.

Apply one primer tie-coat over exposed existing primer, 2-3 mil DFT. DO NOT apply primer over any bottom paint. Apply two Pettit Hydrocoat eco, overlapping existing good bottom paint.

g. The Contractor is responsible for providing and installing any coverings, enclosures, or shelter which may be necessary to protect the work from the weather and provide and maintain suitable environmental conditions for painting. These conditions shall be maintained until the paint has fully cured.

Contract Technical Representative:

Brian Fite Mechanic NOAA Fisheries Point Adams Research Station PO Box 155 Hammond, OR 97146 Email: Brian.Fite@noaa.gov Phone: 503-994-5062

NOAA Small Boat Program Contact:

Darel McCormick NOAA Small Boat Program Inspection Coordinator 7600 Sand Point Way NE, Building 3 Seattle, WA 98115 Email: darel.s.mccormick@noaa.gov Phone: 206-304-7470

R/V Murrelet mailto:darel.s.mccormick@noaa.gov

R/V Siliqua