Statement of Work RFI Tents 2 July 24.docx

DOCX document 20 KB Posted

Attached to
RFI Shielded Tents
Solicitation number
FA440724Q4000
Issued by

About this file

This document is a Statement of Work (SOW) for an RFI (Request for Information) for 18 portable, lightweight RF shielded tents. The tents are required to house and protect communication media emissions of multi-domain (NIPR/SIPR/JWICS) equipment to support the Air Mobility Command's deployable communications solution, Joint Expeditionary Forward Flyaway-Kits (JEFF-K).

The tents must meet specific requirements, including: black, high metal content RF/EMI fabric; 7'L x 6'W x 6'H dimensions with a heavy-duty, easy pop-up style portable external steel frame; Velcro/zipper closure system; grounded power supply with ventilation; door and power/fans on specific sides; >85dB attenuation range from 400MHz-11GHz; set up in under 20 minutes; and transport cases weighing no more than 170 pounds total per tent. The contractor must provide warranties, documentation, and testing to ensure the tents meet all requirements. The related federal contract opportunity is Solicitation Number FA440724Q4000 issued by the Department of the Air Force Air Mobility Command for these RFI Shielded Tents.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work HQ Air Mobility Command RFI Shielded Tents

1. Purpose

The requirement is for (18) portable, lightweight RF shielded tents. They shall be capable of housing and protection communication media emissions of multi-domain (NIPR/SIPR/JWICS) equipment. The tents will support AMC ISR Force Elements (FE) and house the Air Mobility Commands’ deployable communications solution, Joint Expeditionary Forward Flyaway-Kits (JEFF-K). These (18) tents will allow for easy setup and breakdown when rapid response of a deployment is needed in various environments. Tents and corresponding deliverables shall be delivered to Scott AFB, IL.

2. Scope of Work

The RF Shielded Tent is the main component of the deployable kit. The enclosure must meet the mission requirements to provide an extremely portable and high-performing alternative to hardwall and/or metal building structures. Tent enclosure will be customized to meet Intelligence, Surveillance, and Reconnaissance (ISR) centered missions of providing vital, modern, context-relevant capabilities.

3. Requirements

This requirement is for 18 RF/EMI Shielded Tents. All contractor provided equipment shall be new not refurbished. The contractor shall provide Operator/Customer training. The contractor shall provide user guide with common fix action/troubleshooting, accurate wiring diagrams, block diagrams, and/or schematics for all newly installed equipment and corresponding hardware to show actual configuration and connectivity. Cables shall be physically labeled at interface points in accordance with the configuration baseline provided in the documentation. In addition, contractor will use standard installation practices for all cable runs and cable management.

Each tent must fulfill the following requirements:

a) Tents will be black, high metal content RF/EMI fabric. Tents fully assembled will be 7'L(length) x 6'W(width) x 6'H (height), with a heavy-duty frame made from easy pop-up style portable external steel frames. Tents assembled will consists of no more than 10 steel poles.

b) Closure system will consist of a Velcro/zipper closure system.

c) Enclosure must have grounded power supply that supports the plug in of power strips and ventilation. (power strip not included)

d) Facing the tent, the door will be on the left-hand side, power and fans will be on the right-hand side of the tent's front.

e) Ventilation door is a radio frequency screen that allows for airflow via a small size fan contained in the screen.

f) Facing the tent, the power and fans will be located on the right-hand side of the tent's door. Attenuation range must be >85dB from 400MHz-11GHz, connections must be, high performance 15A double stage power filter box consisting of (4) Cat6 RJ-45 connectors and (2) FC/FC Fiber couplers.

g) Deploying each tent will take no more than 20 minutes.

h) Tent transport and frame transport cases required for storage and transport (2 cases/tent). Transport cases must be heavy duty pelican style with rollers for easy conveyance. Total weight will be no more than 170 pounds per tent/frame in cases (48"x18"x18" - 110lbs & 63"x9"x5" - 60lbs).

i) Lead time not to exceed 13 weeks for production and delivery.

j) Construction and soundness of tent structure will be tested utilizing numerous methods and equipment. Tents will be visually inspected for tears, rips, and overall condition of equipment. All tents will be inventoried upon arrival. Each tent will be tested for acceptable standards individually utilizing Yorkie Pro Hand-Held Scanner inside the tent to detect, cellular, Wi-Fi, Bluetooth and BLE (Bluetooth Low Energy) channels using a high-speed receiver engine in conjunction with a Wi-Fi/BT/BLE demodulator. The PocketHound will be used to scan for RF signatures emitting from within the RF shielded tent. Tents will be tested by any additional requirements set forth by the Department of Defense, USAF, and its affiliates.

4. Warranties

The contractor shall submit Original Equipment Manufacturer (OEM) warranties of the equipment manufacturers and identify the government as benefactor. The contractor shall guarantee their design and workmanship for a minimum of one year -- to include system functionality, cable connections, and general workmanship -- from final acceptance by the government. Equipment documentation shall be provided to the government and include interface block diagrams, cable block diagrams, room and control rack layout drawings, operations and maintenance manuals, and a serialized listing of all equipment items.

5. Deliverables

a) Installation/User Guide.

b) Diagram/Design sheet with measurements and specifications.

c) Care/Cleaning instructions.