This document is a Statement of Work (SOW) for a project to replace the bowling lanes, approaches, and related components at Building 908 on Robins Air Force Base. The SOW details the scope of work, which includes removing and replacing the bowling lanes, pin decks, ball return tracks, cover boards, and capping. The contractor will be responsible for demolition, installation, and disposal of the removed materials. The period of performance is 21 days, and the work must be coordinated to allow the on-site cafe to remain in full operation during the project. The contractor must comply with security, safety, and site maintenance requirements. The related federal contract opportunity is Solicitation Number FA850124Q0024 for the "ROBINS AFB Bowling Alley Lane" project, issued by the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 April 2024

STATEMENT OF WORK

FOR

PROJECT #

REPLACE BOWLING LANES AND APPROACHES, BLDG 908

1. GENERAL: The contractor shall provide all labor, equipment, transportation, and supervision for the following:

2. PERIOD OF PERFORMANCE: (21 DAYS)

SCOPE OF WORK:

· To remove and replace Bowling Lanes, Approaches and Pin Decks.

· To remove and replace Underlane Ball Return Track.

· To remove and replace DuraBowl Cover Boards and Capping.

DEMOLITION

1. Remove existing Bowling Lanes, Bowling Pin Decks and Bowling Approaches.

2. Remove existing Radaray Foul Light Units.

3. Remove existing Under Lane Ball Return Tracks.

4. Remove Front Ball Return Units

5. Remove existing DuraBowl Cover Boards and Capping

INSTALLATION

1. Repair or replace any damage wood supports or frames.

2. Install new LSL Sub Panels and new SPL Lane Panels.

3. Install new Pin Decks along with new Flat Gutters and Transition Blocks.

4. Install new Underlane Ball Return Tracks.

5. Install new DuraBowl Coverboards.

6. Install new Capping with Center Punch Capping Light Kit.

7. Install new Approach Panels.

8. Install new Radaray Foul Light Units.

9. Install removed Front Ball Return Units and existing Scoring Consoles forward by 22 inches.

3. MEASUREMENTS: The contractor shall confirm all measurements to ensure all materials will fit. Contractor will ensure installation specification are 100 percent to meet Bowling Center USBC Lane Certification Inspection.

4. COORDINATION: The Contractor shall provide 30-day notification prior to the start of project construction.

5. CONTINUED OCCUPANCY: On Spot Cafe shall remain in full operation during the entire duration of the project. Bowling Operations will have limited capabilities and Bowling Lanes will be closed for the duration of installation.

6. SECURITY REQUIREMENTS

A. Contractor will provide a list of installers to Robins Bowling Center at least 2 weeks prior to installation so that base passes can be obtained.

B. The Contractor and contractor employees shall comply with all base traffic regulations.

C. Weapons, Firearms and Ammunition are prohibited from possessing on themselves or within their contracted orr privately owned vehicles while on base.

D. The Contractor shall be responsible for safeguarding all government property, and controlled forms provided for contractor use.

E. Work shall be done during normal hours of operation and at the end of each work period Contractor shall secure all Government equipment and materials.

7. SAFETY

A. The Contractor shall have a safety plan for their employees. The Contractor shall instruct each employee in the recognition and avoidance of unsafe conditions and regulations to his or her work environment to control or eliminate any hazards or other exposure to illness or injury. The Contractor shall provide their employees appropriate Personal Protective Equipment (PPE) and mandate proper wear.

B. Accident/Incident Reporting and Investigation. Contractor shall record and report to Bowling Center management all available facts relating to each instance of accidental damage to Government property or injury to either Contractor or Government personnel. The Contractor shall secure the accident scene and wreckage until released by the accident investigative authority through the Center POC. If the Government elects to investigate the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.

8. DISPOSAL OF REMOVED MATERIAL: The Contractor shall provide a dumpster for all removed materials. Its proper removal and disposal shall be the responsibility of the Contractor.

9. SITE MAINTENANCE, CLEAN UP, AND RESTORATION

A. Maintain the work site in a neat, orderly, and safe manner.

B. Remove scrap, waste, and excess materials promptly. Provide signs, barricades, and lights as required to protect base personnel.

C. Do not allow trash and debris to accumulate and become unsightly. Sweep up and collect in contractor-maintained disposal containers daily. Dispose of collected debris weekly as a minimum.

D. Restore the project site to its final condition as required by the contract as soon as possible.

10. GOVERNMENT FURNISHED PROPERTY: Will not be provided in this project.

11. OTHER REQUIREMENTS

A. Smoking is prohibited in all facilities. Smoking outside of facilities/buildings must be in approved areas.

B. Conform to current NFPA and RAFB Fire Protection Codes.

C. Conform to current NEC and Robins base facility standards.

12. GOVERNMENT REPRESENTATIVES:

A. The contractor shall not make any changes to or deviate from the requirements listed in the SOW unless approved by the Contracting Officer.

B. Contractor and Bowling Center Management will conduct a joint quality assurance inspection prior to equipment turn-over to validate operability.

C. The government Project Manager for the work is Dan Bueno at 478-926-2112.