Statement of Work Ref 2.pdf

PDF 295 KB Posted

Attached to
Potable Water System Repair - Ferdinand Hassler
Solicitation number
NM-AN2120-23-01003
Issued by

View the file

Other files

File Type Posted
FAC 23-02 Provisions and Clauses.docx DOCX document
Statement of Work.pdf PDF
Statement of Work Ref 1.pdf PDF
Combined Synopsis Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OWNER’S MANUAL

Pressurized Water Tanks

© 2008 CH20463 (Rev. 3/9/10)

293 Wright Street, Delavan, WI 53115

PSC Series

Installation/Operation/Parts

For further operating, installation, or maintenance assistance:

Call 1-262-728-9181Tested and Certified by the WQA to NSF/ANSI Std. 61 Section 8

READ AND FOLLOW

SAFETY INSTRUCTIONS!

This is the safety alert symbol. When you see this symbol on your pump or in this manual, look for one of the following signal words and be alert to the potential for personal injury:

warns about hazards that will cause serious personal injury, death or major property damage if ignored.

warns about hazards that can cause serious personal injury, death or major property damage if ignored.

warns about hazards that will or can cause minor personal injury or property damage if ignored.

The label NOTICE indicates special instructions which are important but not related to hazards.

Carefully read and follow all safety instructions in this manual and on pump.

Keep safety labels in good condition.

Replace missing or damaged safety labels.

RULES FOR SAFE

INSTALLATION AND OPERATION

NOTE: Installation must comply with all applicable state, provincial, and local statutes, codes and ordinances. Non-compliant installation may result in product failure, property damage, and/or personal injury.

1. Read the Owner’s Manual and Rules for Safe Operation and Installation Instructions carefully. Failure to follow these Rules and Instructions could cause serious bodily injury and/or property damage.

2. Always test water from well for purity before using. Check your local health department for testing procedure.

3. Before installing or servicing your tank, BE SURE pump electric power source is disconnected.

4. Release all pressure before working on tank or system.

Make sure all air pressure has been released before remov-ing tank flanges.

5. BE SURE your pump electrical circuit is properly grounded.

6. Remove bleeder orifices, air volume controls or other air charging devices in existing system.

Safety 2

Install in compliance with all applicable laws, codes and ordinances. Non-com-pliance may cause product failure, prop-erty damage, and/or personal injury.

Install this tank in vertical position only.

If your installation requires a horizontal tank, contact your dealer for available steel tanks.

LIMITED WARRANTY

PENTAIR WATER warrants to the original consumer purchaser (“Purchaser” or “You”) of the products listed below, that they will be free from defects in material and workmanship for the Warranty Period shown below.

Product Warranty Period

Water Systems Products – whichever occurs first:

jet pumps, small centrifugal pumps, 12 months from date of original installation, or submersible pumps and 18 months from date of manufacture related accessories PENTEK INTELLIDRIVE 12 months from date of original installation, or

18 months from date of manufacture Pro-Source™ Composite Tanks 5 years from date of original installation Pro-Source™ Steel Pressure Tanks 5 years from date of original installation Pro-Source™ Epoxy-Line Tanks 3 years from date of original installation Sump/Sewage/Effluent Products 12 months from date of original installation, or

18 months from date of manufacture Our warranty will not apply to any product that, in our sole judgement, has been subject to negligence, misapplication, improper installation, or improper maintenance. Without limiting the foregoing, operating a three phase motor with single phase power through a phase converter will void the warranty. Note also that three phase motors must be protected by three-leg, ambient compensated, extra-quick trip overload relays of the recommended size or the warranty is void.

Your only remedy, and PENTAIR WATER’s only duty, is that PENTAIR WATER repair or replace defective products (at PENTAIR WATER’s choice). You must pay all labor and shipping charges associated with this warranty and must request warranty service through the installing dealer as soon as a problem is discovered. No request for service will be accepted if received after the Warranty Period has expired. This warranty is not transferable.

PENTAIR WATER SHALL NOT BE LIABLE FOR ANY CONSEQUENTIAL, INCIDENTAL, OR CONTINGENT DAMAGES WHATSOEVER.

THE FOREGOING WARRANTIES ARE EXCLUSIVE AND IN LIEU OF ALL OTHER EXPRESS AND IMPLIED WARRANTIES, INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. THE FOREGOING WARRANTIES SHALL NOT EXTEND BEYOND THE DURATION EXPRESSLY PROVIDED HEREIN.

Some states do not allow the exclusion or limitation of incidental or consequential damages or limitations on the duration of an implied warranty, so the above limitations or exclusions may not apply to You. This warranty gives You specific legal rights and You may also have other rights which vary from state to state.

This warranty supersedes and replaces all previous warranty publications.

PENTAIR WATER, 293 Wright St., Delavan, WI 53115

Safety 3

To prevent possible serious or fatal injury and/or damage to equipment, system pressure must be less than 125 pounds per square inch gauge (psig) under any circumstances. Failure to follow this instruction can result in tank explosion. If system discharge pressure can exceed 125 psig, install a relief valve capable of pass-ing the full pump volume at 125 psig. Install relief valve in pump supply line to tank, as close to tank as possible.

Hazardous pressure. Read owner’s manual before attempting to install, operate, or service this tank.

To avoid possible equipment failure, severe injury, and property damage, do not allow pump, tank, or piping sys-tem to freeze.

GENERAL SAFETY

All tanks are factory pre-charged with air. When installing tank, adjust pre-charge to 2 psig below pump cut-in pressure setting. To do this, bleed air from or add air to the valve on top of the tank.

NOTICE: Always set pre-charge with NO WATER in tank.

Check pressure frequently with an accurate tire pressure gauge until correct pressure has been reached. For correct pre-charge pressure settings, see Chart 1, below.

CHART I

NOTICE: Replace and tighten air valve cap if it is removed for any reason. Failure to replace air cap may allow loss of air pressure and eventually lead to tank waterlogging and air cell failure.

Pre-charged storage tanks can be connected together to increase the supply of usable water (drawdown). Two tanks of the same size will double the supply and three tanks will triple the supply. See Figures No. 1A and 1B for typical installations of this kind.

OPERATING CYCLE:

1. Tank nearly empty – air expands filling area inside air cell (Figure 2A).

2. Water begins to enter tank – air is compressed in air cell as tank fills with water (Figure 2B).

3. Pump-up cycle completed – air pressure has reached the cut off setting of pressure switch (Figure 2C).

4. Water being drawn from tank – compressed air in air cell forces water out of tank (Figure 2D).

5. Tank now empty – new cycle ready to begin (Figure 2A).

Pressure Switch Setting Tank Precharge (psig)

20-40 psig 18 30-50 psig 28 40-60 psig 38 50-70 psig 48

From Well

To Service

Tanks

Pressure Switch

From Well

To Service

Tanks

Pressure Switch

Figure 1A:Typical Layout With Two Tanks

Figure 1B: Typical Layout With Three Tanks

Air Air

Water

Air

Air

Water

Figure 2A Figure 2B

Figure 2C Figure 2D

Figure 2:Air Cell Cycle

Operation / Installation 4

Chart II – Water Yield Per Pump Cycle (drawdown) in Gallons

INSTALLATION

Connect system pipe to elbow on tank flange. Use plas-tic or steel pipe as required. To prevent leaks, use Teflon tape or Plasto-Joint Stik1 on male threads of all threaded connections to tank.

NOTICE: To be sure that joint is not cross-threaded and that threads are clean, always make connections by hand (without sealer) first. After making sure that threads are clean, remove pipe, add Teflon tape or Plasto-Joint Stik, and remake connection. Do not over-tighten pipe connection at tank. Thread connection on hand tight plus 3 additional turns for steel pipe and 1-2 turns for schedule 40 PVC pipe.

NOTICE: When replacing a standard tank in a sub-mersible pump system, raise pump and discharge pipe far enough to remove bleeder orifices from the tees in the discharge pipe. Plug the tees. When replacing a standard tank in a jet pump system, remove Air Volume Control (AVC) and plug AVC port in pump.

In areas where the temperature is high for long periods of time, the tank pre-charge pressure may increase.

This may reduce the tank drawdown (amount of water available per cycle). If this occurs, reduce the pre-charge pressure to two PSI below the pump cut-in set-ting of the pressure switch.

It is necessary to flush all air out of the piping system and water reservoir portion of the pre-charged tank.

This is required on new installations, pumps requiring repriming and pumps that have been disassembled for service. Proceed as follows:

1. Open faucets furthest from tank and allow pump to operate.

2. Air in the system will cause a sputtering flow; allow faucets to run until you have a steady, air free stream.

3. Open and close faucets repeatedly until you are sure all air has been removed.

4. If stream does not become steady, air may be leak-ing into the system; check for leaks in the piping on the suction side of the pump.

NOTICE: To prevent waterlogging, check tank air charge every six months.

Tank Model Capacity Pressure Switch Setting Number (U.S. Gals) 20-40 30-50 40-60

PSC-14-4 14 5.3 4.5 3.9

PSC-20-6 20 7.2 6.1 5.3

PSC-30-9 30 10.8 9.1 7.9

PSC-35-11 35 12.8 10.8 9.4

PSC-40-12 40 14.7 12.5 10.8

PSC-48-14 48 17.2 14.6 12.6

PSC-60-20 60 21.9 18.5 16.1

PSC-80-23 80 29.1 24.6 21.3

PSC-85-25 85 31.7 26.8 23.2

PSC-119-35 119 43.8 37.0 32.0

Tank Capacity Tank Tank Discharge

Model (U.S. Gals) Diameter Height Tapping

PSC-14-4 14 16” 31-5/16” 1”

PSC-20-6 20 16 36-5/16 1

PSC-30-9 30 16 48-5/16 1

PSC-35-11 35 21 37 1

PSC-40-12 40 16 61-5/16 1

PSC-48-14 48 21 44 1

PSC-60-20 60 24 46-9/16 1-1/4

PSC-80-23 80 21 66 1

PSC-85-25 85 24 58-9/16 1-1/4

PSC-119-35 119 24 78-9/16 1-1/4

NOTICE: Maximum Internal Water Temperature – 120° F.

Maximum Ambient Air Temperature – 120° F.

Distance from base to center line of connection is 2".

Allow 12" clearance over top of tanks for service access.

NOTICE: Drawdown will be affected by operating temperature of the system, accuracy of the pressure switch and gauge, the actual precharge pressure, and the rate of fill.

1Lake Chemical Co., Chicago, Illinois

SPECIFICATIONS

Installation 5

TO CHECK TANK AIR CHARGE

If drawdown (amount of water that comes out of tank per pump cycle) decreases significantly, check as follows:

1. To check air charge in tank, shut off electric power to pump, open faucet near tank, and drain completely.

2. Remove pole piece cap and check air pressure at the air valve in top of tank with a standard tire gauge. Air pressure should be 2 psig below pump pressure switch cut-in setting (that is, if switch closes at 30 psig, pressure in tank should be at 28 psig).

3. If the air pressure is more than 2 psig below the cut-in setting, add air to the tank. Use an air compressor or a portable air storage tank.

4. Use soap or liquid detergent to check for air leaks around air valve. Continuous bubbling indicates a leak. If necessary, install new core in air valve. This is the same as those used for automobile tubeless tires.

TO CHECK PUMP PRESSURE

SWITCH SETTING

1. To check pressure switch setting, disconnect power to pump at supply panel (but be sure to leave pres-sure switch connected to power supply wires).

2. Remove pressure switch cover.

3. Open a faucet near tank.

4. Allow water to drain until pressure switch contacts close; immediately close faucet.

5. Check pressure at valve with standard tire gauge or with pump pressure gauge (if supplied).

6. Pressure gauge should read 2 psig below pump cut-in setting (28 psig for 30-50 switch, 18 psig for 20-40 switch, etc.) If not:

A. Adjust switch according to switch manufacturer’s instructions.

B. Reconnect power supply to pump and pump up pressure in system.

C. Disconnect power supply to pump again and re-check switch setting.

D. Repeat until pressure switch starts pump within ±1 psig of proper setting.

E. If cut-in setting is too low, system will rattle or develop water hammer when pump starts.

F. Cut-out setting is not as critical as cut-in setting.

Make sure that pump will stop running in a rea-sonable time. If it does not, cut-out setting may need to be adjusted down slightly. Be sure that after readjustment, system does not rattle or ham-mer on startup.

7. Re-check tank air pre-charge to be sure it is 2 psig below pump pressure switch cut-in setting.

TESTING FOR AIR CELL LEAKAGE

1. Disconnect power to pump.

2. Drain all water from tank by opening faucet closest to tank.

3. Remove pole piece cap and valve cap from valve and charge air cell.

4. Check air pressure after 24 hours. If air cell leaks, pressure will drop. If so, replace air cell.

AIR CELL REPLACEMENT

To be sure polar boss cap cannot blow off of tank, release all air from system before re-moving capscrews from flange assembly.

1. Disconnect power to pump.

2. Follow steps 1 through 3 under “Testing For Air Cell Leakage”.

3. Remove valve core (see Page 6).

4. Remove valve cap, hex nut and washer from valve.

5. With a screwdriver, pry the clips out and remove them. Remove polar boss cap.

Figure 3: Use A Tire Gauge To Check Pre-charge In Air Cell

5899 1008

Figure 4: Remove Pole Piece Cap,Valve Cap and Retaining Nut, Clips, and Polar Boss Cap.

Installation 6

6. Air cell may not come out in one piece. Pull air cell up with pliers and cut wherever convenient with sin-gle edge razor blade or sharp knife. Continue pulling and cutting until air cell is removed.

7. Before air cell can be inserted into tank, it must be tightly rolled up as follows:

A. Remove valve core.

B. Place air cell on clean surface with opening to one end; flatten bag to force air out. Pull ends out flat (see Figure 5).

C. To get tightest possible wrap, start on one side and TIGHTLY roll air cell to other side (see Figure 5). Force out as much air as possible.

8. Push and turn tightly rolled air cell into tank (see Figure 6).

9. Shake air cell a few times inside tank to work wrin-kles out. It is not necessary to remove all wrinkles from cell.

NOTICE: Don’t push air cell into tank further than its own length. In a large tank, air cell can slip out of reach if pushed too far.

10. Clean tank sealing surface before installing top flange assembly.

11. Clean sealing surface and groove of polar boss cap;

install O-ring and polar boss cap on tank.

12. Pull valve up through polar boss cap.

13. Install metal washer and nut on valve.

14. Reinstall polar boss cap into top opening. Fasten it with two (2) red clips.

15. Recharge tank to proper air pressure and install valve cap and install pole piece cap (see Page 5).

16. Prime pump (see pump owner’s manual).

VALVE CORE REPLACEMENT

To be sure air valve and core cannot blow out of tank, release all air pressure from tank before removing valve core.

1. Disconnect power to pump.

2. Drain ALL water in system by opening faucet clos-est to tank.

3. Depress valve core to release ALL air pressure in tank. When air stops coming out of valve, remove core from inside of valve to release remaining pres-sure. Thread new valve core into tank valve and tighten.

NOTICE: Do not overtighten.

4. Recharge tank with air pressure (see Figure 3, page 5) according to Chart I, Page 3; install valve cap and pole piece cap; reconnect power to pump.

Tank is ready for service.

Figure 5: Spread Air Cell Out Flat and Squeeze Air Out;

Roll Cell Tightly, Squeezing Remaining Air Out Through Valve

Figure 6:Turn and Push Air Cell Down Through Top Tank Port. Expel Any Remaining Air From Air Cell As You Go

Installation 7

Pressure Switch

To Service

Relief Valve

Floor Drain

Pressure Gauge

From Submersible Pump in Well

5896 1008

Figure 8:Typical Installation with Submersible Pump Figure 9:Typical Installation with Vertical Multi-Stage Pump

To Service

Relief Valve

Floor Drain

Pressure Gauge

60 40

Pressure Switch

Pressure Regulator Check

Valve

Pressure Switch

To Household Water System

From Well

Relief Valve

Check Valve

5895 1008

Figure 7:Typical Installation with Jet Pump

Repair Parts 8

REPAIR PARTS LIST

No. 7 Base No. 11 SS Elbow* B. Elbow Adapter Kit C. Air Cell Kit

PSC-14-4 CH20316 CH20379 CH20301K CH20070-1K

PSC-20-6 CH20316 CH20379 CH20301K CH20070-2K

PSC-30-9 CH20316 CH20379 CH20301K CH20070-3K

PSC-35-10 CH20317 CH20379 CH20301K CH20070-13K

PSC-40-12 CH20316 CH20379 CH20301K CH20070-4K

PSC-48-14 CH20317 CH20379 CH20301K CH20070-6K

PSC-60-20 CH20318 CH20378 CH20302K CH20070-7K

PSC-80-23 CH20317 CH20379 CH20301K CH20070-5K

PSC-85-25 CH20318 CH20378 CH20302K CH20070-8K

PSC-119-35 CH20318 CH20378 CH20302K CH20070-9K

*NOTE: Elbow only: CH20379 = 1" NPT; CH20378 = 1-1/4" NPT.

Key Part No. Part Description Qty. Number

AA Poolarr Boossss CCap KKit (includes CH20294K Key Nos. 1, 2, 3, 4, 5, 6)

1 Pole Piece Cap 1 2 Valve Stem Nut 1 3 Washer 1 4 C-Clip 2 5 Polar Boss Cap 1 6 O-Ring 1 7 Base 1 See below BB Elbboow AAddaappteer KKit (includes See below

Key Nos. 8, 9, 10, 11) 8 O-Ring 1 9 Elbow Adapter 1 10 H-Clip 1 11 SS Elbow 1 CC AAir CCeell KKit (includes See below

Key Nos. 12, 13, 14, 15) 12 Valve Cap 1 13 Valve Core 1 14 Rubber Washer 1 15 Air Cell 1

6 12

6163 0310

A

B

C