This document is a Statement of Work (SOW) and associated Federal Contract Opportunity for the insulation renewal on a 45-foot Response Boat - Medium (RB-M) at the USCG Base Miami Beach Industrial Production Facility.

The SOW requires the contractor to install insulation in the Engine Room Machinery Space, including the port and starboard air intakes, using specified materials and installation processes. The work must be performed during the estimated mid to late November 2024 timeframe, Monday through Friday excluding holidays, from 6:30 am to 3:00 pm. Overtime must be approved by the COTR 24 hours in advance. The contractor will provide all consumables and replace any damaged pins. The contractor will also arrange for disposal of the existing lead-lined insulation.

The associated Federal Contract Opportunity is a small business set-aside with a NAICS code of 336611 - Ship Building and Repairing. Proposals are due by 3:00 pm EST on Wednesday, November 13, 2024. The government will award a fixed-price contract to the responsible offeror whose proposal is most advantageous based on cost and past performance. The anticipated award date is 7 business days after the solicitation closes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/SPECIFICATION/WORK STATEMENT

FOR INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM

Work Statement

In the performance of this contract, the contractor shall provide the services to perform insulation renewal on a 45-foot Response Boat – Medium (RB-M) while the vessel is dry-docked at USCG Base Miami Beach Industrial Production Facility located at 100

MacArthur Causeway Miami Beach, FL 33139. The contact person for this contract is LT

Julia Ferris, 305-535-4332, or Mr. Bryan Goltz, 305-535-4337.

Scope of Services

The contractor shall furnish trained, qualified personnel, and any required special tools or equipment necessary to complete the following work:

1. Install insulation in the entirety of the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, IAW Drawing 45-RB-M-635-002, Rev C.

Contractor Performance Requirements

(1) Installation period of performance will be scheduled as determined by the vessel’s production schedule; estimated mid to late NOV 2024.

(2) Exact periods of performance will be scheduled by the COTR at least two weeks prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:

6:30 am to 3:00 pm

(3) If overtime is required, the contractor must notify the COTR 24 hours in advance and must be approved by Base Miami Beach officials.

2. Installation material will be as follows:

a. Sound attenuation barrier: Pyrotek “QUADZERO” #17763007

b. Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation

3. Installation process is as follows:

Bulkhead > QUADZERO > Insulation Speed Washer > 2” Insul-Quick Hullboard > Insulation Speed Washer > Trim Pin (if necessary) > Insulation Cap

4. Tape all boundaries.

5. All consumables, Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation, Pyrotek insulation, and stud gun will be provided by the contractor.

6. Contractor will provide pins and caps. Contractor will replace any damaged pins found upon insulation removal.

7. Contractor will arrange for disposal of existing lead-lined insulation. Existing lead-line insulation will be removed and packaged prior to Contractor arrival