This is a Performance Work Statement for insulation renewal services on a 45-foot Response Boat – Medium (RB-M) vessel. The work will be performed at USCG Base Miami Beach Industrial Production Facility located at 100 MacArthur Causeway, Miami Beach, FL 33139. The primary contacts are LT Allie Doris (305-535-4332) and Mr. Bryan Goltz (305-535-4337). The scope of services includes installing insulation throughout the Engine Room Machinery Space including Port and Starboard Engine Room Air Intakes, and repairing/replacing 64 square feet of the lower half of the Pilot house with 2-inch Hullboard with fiberglass facing. All work must be performed in accordance with Drawing 45-RB-M-635-002, Rev C.
The contractor must furnish trained, qualified personnel and all required special tools and equipment. Required materials include Pyrotek "QUADZERO" #17763007 sound attenuation barrier and Owens Corning 2-inch Foil-Faced "Insul-Quick" insulation. The contractor is responsible for providing all consumables, the stud gun, pins, caps, and arranging disposal of existing lead-lined insulation, which will be pre-removed and packaged prior to contractor arrival. Work is estimated to occur late April to early May 2026, scheduled Monday through Friday excluding holidays, from 6:30 a.m. to 3:00 p.m. Exact performance periods will be scheduled by the Contracting Officer's Technical Representative (COTR) at least two weeks in advance. Any required overtime must be requested 24 hours in advance and approved by Base Miami Beach officials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Insulation Details 45-RB-M-635-002 Rev C.pdf | ||
| COMBINED SYNOPSIS SOLICITATION SERVICES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION/SPECIFICATION/WORK STATEMENT
FOR INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM
Work Statement
In the performance of this contract, the contractor shall provide the services to perform insulation renewal on a 45-foot Response Boat – Medium (RB-M) while the vessel is dry-docked at USCG Base Miami Beach Industrial Production Facility located at 100 MacArthur Causeway Miami Beach, FL 33139. The contact person for this contract is LT Allie Doris, 305-535-4332, or Mr. Bryan Goltz, 305-535-4337.
Scope of Services
The contractor shall furnish trained, qualified personnel, and any required special tools or equipment necessary to complete the following work:
1. Install insulation in the entirety of the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, IAW Drawing 45-RB-M-635-002, Rev C.
2. Repair/Replace 64SF lower half of Pilot house. Which is 2” Hullboard with fiberglass facing. IAW Drawing 45-RB-M-635-002, Rev C
3. Installation material will be as follows:
a. Sound attenuation barrier: Pyrotek “QUADZERO” #17763007
b. Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation
4. Installation process is as follows:
Bulkhead > QUADZERO > Insulation Speed Washer > 2” Insul-Quick Hullboard > Insulation Speed Washer > Trim Pin (if necessary) > Insulation Cap
5. Tape all boundaries.
6. All consumables, Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation, Pyrotek insulation, and stud gun will be provided by the contractor.
7. Contractor will provide pins and caps. Contractor will replace any damaged pins found upon insulation removal.
8. Contractor will arrange for disposal of existing lead-lined insulation. Existing lead-line insulation will be removed and packaged prior to Contractor arrival.
Contractor Performance Requirements
(1) Installation period of performance will be scheduled as determined by the vessel’s production schedule; estimated late April to early May 2026.
(2) Exact periods of performance will be scheduled by the COTR at least two weeks prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:
6:30 am to 3:00 pm
(3) If overtime is required, the contractor must notify the COTR 24 hours in advance and must be approved by Base Miami Beach officials.