Statement of Work_RB-M Insulation Renewal 45609.docx

DOCX document 32 KB Posted

Attached to
INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM
Solicitation number
52050PR250000168
Issued by

About this file

This Statement of Work outlines insulation renewal requirements for a 45' Response Boat - Medium (RB-M) at the USCG Base Miami Beach Industrial Production Facility in Florida. The contractor must install insulation throughout the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, as well as install insulation in the Pilot House (approximately 200 square feet) and repair 10 square feet in the survivor compartment, all according to Drawing 45-RB-M-635-002, Rev C specifications.

The work is scheduled for late February/early March 2025, with normal working hours from 6:30 AM to 3:00 PM Monday through Friday, excluding holidays. The contractor must provide trained personnel and necessary special tools/equipment. This is a small business set-aside opportunity from the Department of Homeland Security US Coast Guard, with quotes due by February 19, 2025, at 3:00 PM EST. Award is anticipated within 7 business days, with an Out of Agency date of February 28, 2025. A recommended site visit is scheduled for February 12, 2025, at 10:00 AM EST, and questions will be accepted until February 14, 2025, at 10:00 AM EST.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/SPECIFICATION/WORK STATEMENT

FOR INSULATION RENEWAL ON 45’ RESPONSE BOAT - MEDIUM

Work Statement

In the performance of this contract, the contractor shall provide the services to perform insulation renewal on a 45-foot Response Boat – Medium (RB-M) while the vessel is dry-docked at USCG Base Miami Beach Industrial Production Facility located at 100 MacArthur Causeway Miami Beach, FL 33139. The contact person for this contract is LT Julia Ferris, 305-535-4332, or Mr. Bryan Goltz, 305-535-4337.

Scope of Services

The contractor shall furnish trained, qualified personnel, and any required special tools or equipment necessary to complete the following work:

1. Install insulation in the entirety of the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, IAW Drawing 45-RB-M-635-002, Rev C.

2. Install insulation in the entirety of the Pilot House approx. 200 square feet, and repair approx. 10 square feet in survivor compartment. IAW Drawing 45-RB-M-635-002, Rev C.

Contractor Performance Requirements

(1) Installation period of performance will be scheduled as determined by the vessel’s production schedule; estimated late Feb/ early March.

(2) Exact periods of performance will be scheduled by the COTR at least two weeks prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:

6:30 am to 3:00 pm

(3) If overtime is required, the contractor must notify the COTR 24 hours in advance and must be approved by Base Miami Beach officials.