Statement of Work R11 Hydrant Upgrade (RAFM).docx

DOCX document 23 KB Posted

Attached to
100th LRS R-11 HYDRANT ADAPTER KIT
Solicitation number
FA558724Q0085
Issued by

About this file

This document is a Statement of Work (SOW) for the "R11 Hydrant Adapter Upgrade" at Royal Air Force (RAF) Mildenhall. The SOW outlines the requirement to purchase specific components from Isometrics Inc. to convert the R-11 Hydrant Servicing Modules (HSM) to USAFE specification, allowing them to be used in conjunction with the European theater fuel systems. This will provide more flexibility and capability for special refueling operations.

The key components required are: 1 ea Coupler storage bracket, 1 ea Hydrant Coupler/DOD coupler, and 1 ea Hydraulic Deadman adapters. The total cost for these items is $19,099.47. The contractor is responsible for shipping the items to RAF Mildenhall, with specific shipping instructions provided based on vendor location. No other services are required. The SOW also includes general contract management, security, and access requirements for working on a government installation.

View the file

Other files

File Type Posted
Solicitation - FA558724Q0085.pdf PDF
SSJ for 100 LRS Hydrant converter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) “R11 Hydrant Adapter Upgrade” at Royal Air Force (RAF) Mildenhall “Rev. 1, 31 Jul 2024”

1.0 Introduction

1.1 Mission: Recently the Mobile Pantographs for refueling operations were changed to the RM&MR program for maintenance and repair. This vastly lengthens the time it takes to get the repair and operational for mission support. By converting the R-11 Hydrant Servicing Module (HSM) to USAFE specification, it allows the 2x R-11s we have with HSM on them to be used in conjunction with the hydrants system. This offers more flexibility & capability in carrying out special refueling operations like hot pits and large frame refueling.

1.2 Background: POL would be able to rapidly respond with R-11s to support hot-pits at Victor and Hotel Ramp, without having to utilize multiple personnel to tow and move pantographs to the locations. This is compounded by being able to expand capabilities on weekends or on off shifts when personnel availability. This would increase hydrant refueling equipment support equipment availability by 50% allowing better manpower allocation.

1.3 Scope: Request purchase from Isometrics Inc who already manufactures the fuel trucks. This is an upgrade kit to allow US spec R11 HSMs be utilized in conjunction with the European theater fuel systems to increase capabilities. Purchase the following: 1ea Coupler storage bracket P/N 1061A-07-23 - $490.00, 1ea Hydrant Coupler/ DOD coupler used at NATO Bases with 4x3 threaded reducer P/N 351GF-14 - $15,947.72, 1ea Hydraulic Deadman adapters P/N 1061H-15-10 100-266C02 - $2,661.75.

2.0 General Requirements

2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.

2.2 Contract Management & Administration

2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.

2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.

2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.

2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays. Work hours are from 0800 to 1700 local UK time.

3.0 Product Specifications & Installation Requirements

3.1 Isometerics Inc will provide the following: 1ea Coupler storage bracket P/N 1061A-07-23 - $490.00, 1ea Hydrant Coupler/ DOD coupler used at NATO Bases with 4x3 threaded reducer P/N 351GF-14 - $15,947.37, 1ea Hydraulic Deadman adapters P/N 1061H-15-10 100-266C02 - $2,661.75 and ship to RAF Mildenhall. No other services will be need.

4.0 Special Requirements

4.1 Security & Safety

4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.

4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.

4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.

4.3 Shipping Instructions

4.3.1 For vendors located inside the United Kingdom.

4.3.1.1 Shipment shall be FOB Destination.

4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).

4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2 For vendors located outside of the United Kingdom.

4.3.2.1 Option One: United States Postal Service.

4.3.2.1.1 Shipping shall be FOB Destination.

4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.

4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.1.5 Hazardous material is not submitted.

4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.

4.3.2.2 Option Two: Commercial small parcel carrier.

4.3.2.2.1 Shipping shall be FOB Destination.

4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items or outline it in a separate line item).

4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.

4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.

4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2.3 Option Three: Consolidated Shipping Point.

4.3.2.3.1 Shipping shall be FOB Destination.

4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items or outline it in a separate line item).

4.3.2.3.3 Weight of individual shipments must exceed 300lbs.

4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).

4.3.2.3.5 Hazardous material may be shipped via this method.

4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.

4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED STATES AIR FORCE” in order to ensure shipments clear customs.

4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.

4.3.3 Contact Information; 100th Logistical Readiness Squadron (100 LRS)

4.3.3.1 100 LRS/Inbound Customs; 100lrs.lgrddc.inboundcustoms@us.af.mil.

4.3.3.2 100 LRS/Inbound Cargo; 100lrs.inboundcargo@us.af.mil.

4.3.3.3 Commercial phone number; +44 01638 545708.

4.4 Government Furnished Material: N/A

4.5 Applicable Directives: N/A

5.0 Appendix: Related Documents

Appendix 1: Isometrics Quote

File details come from the government source that posted it. Updated .