Statement of Work_Preventive Maintenance for HVAC Systems and Boiler_Oct 25 2022.docx
DOCX document 16 KB Posted
- Solicitation number
- 12405B23Q0025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Condensing Unit1.JPG | JPG image | |
| AHU1.JPG | JPG image | |
| AHU3.JPG | JPG image | |
| Condensing Unit2.JPG | JPG image | |
| Boiler2.JPG | JPG image | |
| Boiler1.JPG | JPG image | |
| AHU2.JPG | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PROJECT INFORMATION
| Project Name: | USDA-ARS, Aquatic Animal Research Unit |
| Project Location: | 990 Wire Road, Auburn, AL 36862 Annual Project Cost: $25,000.00 |
REQUIREMENTS and SCOPE
Provide skilled inspections and regular bi-monthly services for the HVAC equipment listed below. This work is to be performed during regular business hours (except for emergency service calls).
| Qty |
| Unit |
| Make |
| 1 |
| Condensing Unit |
| Carrier |
| 1 |
| AHU |
| York |
| 1 |
| Boiler |
| Raypak |
· Inspect overall operation of covered equipment.
· Check air filters (or clean if permanent). Replace filters bi-monthly.
· Check condition of drip pans. Recommend cleaning if needed.
· Inspect blower, evaporator coils, and condenser coils for buildup of dirt or debris.
· Clean evaporator coils and condenser coils annually.
· Check cooling controls for proper operation.
· Check tension on belts and adjust as necessary. Replace belts annually.
· Check refrigerant and oil levels.
· Visually inspect electrical connections and tighten as necessary.
· Check thermostat and time clocks for proper operation.
· Check heating controls for proper operation.
· Inspect heat-exchanger, baffles, and flue.
· Check gas piping and related shut-off valves at unit.
· Grease all zerk fittings.
File details come from the government source that posted it. Updated .