Statement of Work- Playground.pdf
PDF 139 KB Posted
- Attached to
- Supply and Install RAF Alconbury Playground
- Solicitation number
- FA557024S0001
About this file
This document is a Statement of Work (SOW) for the supply and installation of a children's playground at the Stukeley Inn located at RAF Alconbury in the United Kingdom. The SOW outlines the detailed requirements for the playground, including conformance to UK health and safety regulations, installation of a minimum 140 sq.m. wetpour safety floor, inclusion of specific play equipment such as a slide, swings, and equipment suitable for children of all abilities, use of treated wood with a 20-year guarantee, removal of waste material, a pre-installation survey, a 2-year maintenance agreement, and various safety and accessibility specifications for the playground equipment and surfacing.
The related federal contract opportunity is a pre-solicitation for the "Supply and Install RAF Alconbury Playground" under Solicitation Number FA557024S0001, issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa. The SOW excerpt provided outlines the key requirements for the playground, and acceptance will be based on successful installation, training, and operational checks.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT
OF WORK
STUKELEY
INN
Supply and fit
Playground
1. SCOPE: The vendor shall furnish and install, to the best commercial standard, a children’s playground at the Stukeley Inn: RAF Alconbury, Cambridgeshire, PE28 4DA, United Kingdom
2. REQUIREMENTS.
2.1 General It shall encompass and perform in accordance with the below listed guidelines:
2.2 Playground Specifications:
2.2.1 Equipment and installation must conform to all required UK health and safety regulations.
2.2.2. Must include installation of high quality wetpour recessed safety floor. Minimum area 140sqm
2.2.3 Play equipment must include; A least one slide, one regular swing and one suitable for inclusive play for children of all abilities and those who have limited mobility.
2.2.4 Equipment must be made from treated wood and must have a minimum 20 year guarantee.
This must also include chamfered edges to avoid splinters.
2.2.5 Must include the removal of any spoil/waste material created by the installation.
2.2.6 Must include a pre installation survey.
2.2.7 Must include a minimum 2 year maintenance agreement.
2.2.8 Equipment needs to have a sign or label indicating age appropriateness.
2.2.9 Area or playground needs to be fenced in with 2 exit points
2.2.10 Wood parts need to be smooth from splinters and all corners, metal and wood should be rounded.
2.2.11 Anchoring devices installed below ground level and covered with suitable material
2.2.12 All components need to be at least 6 feet apart
2.2.13 Fall surfacing must be a minimum of 6 feet from the end of the slide or the height of the slide not to exceed 8 feet
2.2.14 S-hooks need to be installed and completely closed so there is no gap or space greater than 04 inches
2.2.15 Propper surfacing for the surfacing needs to be twice the height of the swing beam, Front and back.
2.2.16 There needs to be a minimum of 6 feet of fall surfacing around the swing structure (To include on either side)
2.2.17 Swing seats needs to be made of soft materials.
2.2.18 Bucket swing (6-23 months) needs to be 24 inches from the bottom of the occupied seat to the surfacing.
2.2.19 Bucket swing structures (6-23 months) are less than 47 to 96 inches above the ground.
2.2.20 Bucket swings should not allow the child to enter and exit alone.
3. ACCEPTANCE: Acceptance of the Playground and flooring will be official when it is fully installed, training is implemented, and operational check is performed successfully.
4. MAINTANCE:
4.1 The vendor may quote for annual maintenance and management of the equipment.
| STATEMENT |
| OF WORK |
| STUKELEY INN |
| Supply and fit Playground |
| 2. REQUIREMENTS. |
| 3. ACCEPTANCE: Acceptance of the Playground and flooring will be official when it is fully installed, training is implemented, and operational check is performed successfully. |
| 4. MAINTANCE: |
| 4.1 The vendor may quote for annual maintenance and management of the equipment. |