UNCLASSIFIED

Maryland Air National Guard Statement of Work (SOW) 275 COS Floor Partition Wall

JUNE 2022

STATEMENT OF WORK (SOW)

Contents

1.(U) Introduction and Background3
2.(U) Objectives3
3.(U) Scope3
4.(U) Requirements3
4.Facility Clearance5
5.Key Personnel5
6. Place of Performance6

7. Period of Performance……………………………………………………………………………………..………………………..……5

8. Government Furnished Items……………………………………………….………………………5

275 COS Floor Partition Wall

1. Introduction and Background

The 275th Cyberspace Operations Squadron (COS) supports the Air Force as a Service aligned Cyber Protection Team (CPT). The 275 COS is required to maneuver within any Air Force environment from its geographically separated facility to perform Defensive Cyberspace Operation (DCO) missions. Cyberspace defenders need a distinguished operations floor for the ability to pristinely conduct Hunt, Clear, Enable-Hardening, and Assess Cyber Protection Team mission functions within room 225 of building 4240.

2. Objectives

The creation of a partition to act as a physical barrier between the operations floor and squadron administrative section of room 225 of building 4240.

3. Scope

In building 4240, room 225 of the second floor, construct a partition wall to reach across the room separating the operations floor and the full-time staff.

This wall is 36 feet in length and cannot extend to the ceiling. [NOTE] allowed height after Fire Dept survey This wall must contain a door to allow egress between the two sides of the room in the event of an emergency.

Lower portion of each section of wall to have sound absorbent material, and upper portion to have a noise dampening transparent glass for visibility across the room.

4. Requirements

Partition wall to be free standing and not penetrate the plenum of the ceiling to ensure original structural design is not modified.

Partition wall will be foldable / collapsible to one side of the room to be able to open the room and partition the room as required.

The contractor shall ensure the door in partition wall must allow for ease of egress throughout the room in the event of an emergency.

Door to be placed in the middle of the wall, and to include a window at the top of the door. Partition wall to include windows to allow visibility across the room.

The government shall ensure that furniture and equipment are moved from the immediate work area as to not impede the construction efforts.

The government will provide escorts for the contractors, as work will be accomplished within the SCIF.

Provide as-built drawings of final configuration. Conduct a walk through to identify any shortfalls missed during initial walk through. The contractor shall provide updated installation drawings to 175th Civil Engineering Squadron and 275 COS.

Normal working hours that will be respected by the government and contractors is Tuesday - Friday 7:00AM – 4:00PM.

5. Key Personnel

The Contractor shall have an engineer ensuring the partition wall is built according to code and is structurally sound. Work with base civil engineer to ensure their approval of the work prior to acceptance.

6. Place of Performance

6.1 2701 Eastern Blvd, Middle River Maryland 21220 Building 4240, Room 225 and Room 132

6.2 Base Access

6.2.1 The contractor shall verify that identification credentials presented by all contractor and subcontractor employees to obtain security badges, passes, cards, or decals used during the duration of this contract are current and correct.

6.2.2 Contractor’s Passes are only issued to personnel who have properly submitted a locally generated Wing Form 113: 175th Wing Installation Access Application (available from the Contracting Office or from the COR) and have been cleared through an approved background check. The vetting procedures are by the 175th Security Forces Squadron using the standards set forth in WI 31-101v3: Installation Access Control, Chapter 6.1.2: Fitness Determination. The Installation Access Application contains required information necessary to conduct a National Criminal Information Center (NCIC).

6.2.3 For Contractors that do not require CAC but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

6.2.4 Contractors who require access onto the installation for 30 days or more may be issued a contractor’s pass. For Contractors requiring less than 30 days access onto the installation may be issued a Defense Biometric Identification System (DBIDS) generated AF Form 75, Visitors Pass. The Defense Forces Commander (DFC) maintains the right to deny contractors access to the installation based on unfavorable information obtained through NCIC or DBIDS. 1.13.4. Contractors working on the installation need to complete an Antiterrorism Level I training. The training can be found at https://jko.jten.mil/courses/AT-level1/launch.html. Please ensure contractors are attaching their certificates along with their applications. Contractors who have not completed an Antiterrorism Level I training will not be allowed on the installation.

6.2.5 Contractors shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

7. Period of Performance

7.1 All items will be delivered and installed NLT 120 Days after date of award.

8. Government Furnished Items

8.1 N/A

UNCLASSIFIED