Statement of Work Paint Float.doc
DOC document 215 KB Posted
- Attached to
- CGC CAMPBELL FLOATING DOCK WITH SCAFFOLDING Federal contract opportunity
- Solicitation number
- 11509PR240000384
About this file
This document is a Statement of Work (SOW) for the manufacture and delivery of a two-tier floating scaffold dock to be used for maintenance of ships.
The key details are:
- The contractor shall provide all resources necessary to accomplish the tasks and deliverables, which include manufacturing and delivering a floating scaffold dock with specific dimensions, materials, and features. This includes a 16' x 20' aluminum floating dock section, a two-tier heavy duty aluminum scaffolding system with ladders and safety features, and all components must be corrosion-resistant.
- The contractor has the option to fabricate the dock in two or three separate pieces for ease of shipment and transportation, with the requirement to provide the estimated freight cost.
- The final product will be delivered to the USCGC CAMPBELL (WMEC 909) in Newport, RI.
- This will be a firm-fixed priced purchase order contract.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
USCGC CAMPBELL FLOATING MAINTENCE DOCK
A. GENERAL INFORMATION
1. Title of Project: USCGC CAMPBELL FLOATING MAINTENCE DOCK
2. Scope of Work: The contractor shall provide all resources necessary to accomplish the tasks and deliverables described in this Statement of Work (SOW). The contractor shall provide a two-tier floating scaffold dock as outlined in Contractor Requirements.
3. Background: Contractor is to manufacture and deliver a floating scaffold dock that will be used for maintenance of ships.
4. Type of Contract Contemplated: This will be a firm-fixed priced purchase order.
B. CONTRACTOR REQUIREMENTS
Contractor is to provide the below product:
Paint Float - Total Height 19'10"; Total Width 16'; Total Length 20' Aluminum Heavy Duty Paint Float 8'x 20' floating dock section with 8" 6005-T5 aluminum ribbed C channel with cross members on 16" centers, double gusset on all corners. Custom encapsulated floatation (.150" wall thickness) - (4) 5' x 8' x 12" floats per section, 15" installed freeboard. PVC Decking Large Cleat with stainless steel hardware Heavy Duty 4" Bump Strip surrounding 16' x 20' Paint Float Aluminum Scaffolding System Two tier heavy duty aluminum scaffolding system with three back side double railings totaling 60'. Scaffolding system to include build in ladders for access of top levels PVC Decking featuring Decking on both levels to match float decking. Rubber Bump Strip to be installed around all edges on each level. Harness Rod located on the top tier. This is to be a floating paint float dock platform that will always be in the SALT water and open to all elements. All material used shall be corrosive resistant; i.e. stainless steel, treated aluminum, etc. Structure shall be made of sturdy materials able to withstand several hundred pounds of additional weight. For ease of shipment and transportation, the contractor has the option to fabricate the Three Tier Paint Float in two or three separate pieces and re-assemble at the delivery destination. Provide the estimated freight cost.
C. DELIVERY OR DELIVERABLES
Furnished product will be delivered to the below address. Freight charges to be listed on quotations.
USCGC CAMPBELL (WMEC 909)
47 CHANDLER ST
NEWPORT, RI 02841